Vancouver Island Highway 19 Road Conditions Reports
Highway 19. Limited visibility with fog between Port Hardy Ferry and Eve River Rest Area for 139.9 km (Port Hardy to 35 km south of Woss). Water pooling. minor weather condition | last updated Mon Feb 6 at 11:03 AM PST. |
Highway 19, northbound. Utility work between Sullivan Rd and Stowe Creek Rd for 0.7 km (48 km north of Campbell River). Until Wed Feb 8 at 5:00 PM PST. BC Hydro Maintenance Single Lane Alternating Traffic. Expect up to 15 min delay. minor construction | last updated Tue Jan 24 at 11:36 AM PST. |
Highway 19. Utility work planned between Browns Bay Rd and Sayward Timber for 1.8 km (2 km north of Campbell River to Campbell River). Starting Wed Feb 15 at 7:30 AM PST until Wed Feb 15 at 5:00 PM PST. Watch for traffic control personnel. Road will be open to traffic. minor construction | last updated Mon Feb 6 at 10:24 AM PST. |
Highway 19. Construction work between East Wellington Rd and Exit 16 for 0.7 km (Nanaimo). Until Fri Mar 31 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on weekdays. SB merge lane from Jinglepot Rd to Hwy 19 changes to a yield lane during shoulder construction, traffic lanes remain open. 70km/h work zone speed 9AM-3PM Mon-Fri excluding weekends/holidays. major construction | last updated Thu Jan 19 at 10:20 PM PST. | next update Fri Mar 31 at 3:00 PM PST. |
Highway 19, in both directions. Maintenance planned between Sayward Rd and Lakeview Rd for 33.4 km (18 to 51 km north of Campbell River). Starting Tue Feb 7 at 5:00 AM PST until Fri Mar 31 at 5:00 PM PST. From 5:00 AM to 5:00 PM PST on weekdays. Single lane alternating traffic will be in effect. There will be delays up to 20 minutes. Watch for traffic control personnel. minor construction | last updated Mon Jan 30 at 10:16 AM PST. |
Highway 19. Water pooling between Duncan Bay Main and Cook Creek Rd for 56.7 km (12 km south of Campbell River to 28 km south of Cumberland). minor road condition | last updated Mon Feb 6 at 3:45 PM PST. |
Highway 19, northbound. Road maintenance work between Hamm Rd and Coulter Rd for 27.6 km (Campbell River). Until Fri Feb 10. From 7:30 AM to 5:00 PM PST on weekdays. Watch for traffic control. Watch for northbound intermittent lane closures, slow moving vehicles with regular intermittent stops, arrow board vehicles and workers on shoulders of road. minor construction | last updated Thu Feb 2 at 3:43 PM PST. |
For Up to Date road condition reports for all of Vancouver Island
Environment Canada Weather Forecasts