| Highway 7 (Lougheed Highway), in both directions. Rock slope stabilization between 7 Day Adventist Youth Camp Rd and Ross Rd for 3.1 km (Hope). Until Sat Aug 8. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic with 20 minute delays. Work taking place Apr 6-14, May 4-10, May 25-June 26, July 24-Aug 8. Watch for traffic control. minor construction | last updated Tue Mar 31 at 1:57 PM PDT. |
| Highway 7 (Lougheed Highway), in both directions. Construction work between Beaudry Rd and Beach Camp Rd for 0.8 km (6 to 5 km west of Kent). Until Sun May 31. From 9:00 AM to 9:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control. minor construction | last updated Wed Apr 1 at 3:44 PM PDT. |
| Highway 7 (Lougheed Highway), westbound. Mowing between Spilsbury St and 240 St for 4.5 km (Maple Ridge). Until Sat May 9 at 3:30 PM PDT. From 9:00 AM to 3:30 PM PDT on weekdays. Right lane closed. Watch for traffic control. Vegetation clearing work. minor construction | last updated Tue Apr 21 at 2:46 PM PDT. |
| Highway 7 (Lougheed Highway), in both directions. Paving operations planned at Sylvester Rd (1 km east of Mission). Starting Fri May 1 until Sat May 16. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. minor construction | last updated Wed Apr 29 at 10:52 AM PDT. |
| Highway 7 (Lougheed Highway), eastbound. Road maintenance work planned between Old Dewdney Trunk Rd and Kennedy Rd for 68.8 km (Pitt Meadows to Kent). Starting Mon May 18 until Fri May 22. From 9:00 AM to 4:00 PM PDT on weekdays. Right turn lane will be closed. Spill response remediation. minor construction | last updated Wed Apr 29 at 11:43 AM PDT. |
| Highway 7 (Lougheed Highway). Paving operations planned between Athey Rd and Brooks Rd for 1.9 km (13 km east of Mission to 12 km west of Kent). Starting Mon May 4 until Thu May 14. From 7:00 AM to 7:00 AM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. minor construction | last updated Wed Apr 29 at 3:53 PM PDT. |
| Highway 7 (Lougheed Highway), eastbound. Maintenance planned between Wardrop St and Grand St (Mission). Starting Wed May 6 at 8:00 PM PDT until Thu May 7 at 5:00 AM PDT. N. Railway Ave EB On Ramp Full On Ramp Closed, Detour to HWY 7 via Horne St Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:05 PM PDT. |