BC Highway 9 – Road Conditions for the Agassiz-Rosedale Highway.
| Utility work from Highway 9, In Harrison Hot Springs and At Miami River Drive to In Harrison Hot Springs and At Lillooet Avenue. Starting Mon Oct 19 until Fri Oct 23. From 9:00 AM to 3:00 PM PDT, weekdays. Single lane alternating traffic. Last update: October 16th, 2026 at 1:21pm PDT. minor construction | last updated |
| Utility work from Highway 9, In Kent and At McDonald Road to In Kent and At Bristol Drive. Starting Mon Oct 19 until Fri Oct 23. From 9:00 AM to 3:00 PM PDT, weekdays. Right lane closed. Last update: October 16th, 2026 at 1:43pm PDT. minor construction | last updated |
| Utility work from Highway 9, In Kent and Morrow Road to In Kent and Cheam Avenue. Starting Mon Oct 19 until Fri Oct 23. From 9:00 AM to 3:00 PM PDT, weekdays. Last update: October 16th, 2026 at 1:43pm PDT. Crews will be working in the curb lane. minor construction | last updated |
Highway 9 – road conditions at the Agassiz-Rosedale Highway. A north-south route in the eastern part of the Fraser Valley. It acts as the last connection between the Trans Canada Highway (Highway 1) and the Lougheed Highway (Highway 7) eastbound before Hope, and is the main access to the resort village of Harrison Hot Springs.
Highway 9 is 16 km (10 mi) long. In the south, the Highway starts at an interchange on Highway 1 between Rosedale and the Bridal Falls area. Highway 9 travels north for 2.8 km (1.7 mi) to its 1.9-kilometre-long (1.2 mi) bridge over the Fraser River. After crossing the Fraser, Highway 9 – road conditions travels north for 2.5 km (1.6 mi) to the centre of Agassiz. On the north side of Agassiz, Highway 9 meets Highway 7, and the two highways share a common alignment for 1.6 km (1.0 mi). Highway 9 then travels 6.4 km (4.0 mi) north to terminate at Harrison Hot Springs.
Highway 7 Road Condition Reports
Highway 1 Road Condition Reports