BC Highway 9 – Road Conditions for the Agassiz-Rosedale Highway.
| Paving operations at Highway 9, In Kent and At Tuyttens Road. Starting Mon Oct 5 until Fri Oct 16. Watch for traffic control. Southbound lane closure. Last update: September 14th, 2026 at 1:54pm PDT. minor construction | last updated |
| Utility work from Highway 9, In Kent and At Bristol Drive to In Kent and At McDonald Road. Starting Mon Oct 5 until Fri Oct 9. From 9:00 AM to 3:00 PM PDT, weekdays. Right lane closed. Last update: September 22nd, 2026 at 1:03pm PDT. minor construction | last updated |
| Utility work from Highway 9, In Harrison Hot Springs and At Pine Avenue to In Harrison Hot Springs and At Alder Avenue. Starting Mon Sep 28 until Fri Oct 2. From 8:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 23rd, 2026 at 2:50pm PDT. minor construction | last updated |
Highway 9 – road conditions at the Agassiz-Rosedale Highway. A north-south route in the eastern part of the Fraser Valley. It acts as the last connection between the Trans Canada Highway (Highway 1) and the Lougheed Highway (Highway 7) eastbound before Hope, and is the main access to the resort village of Harrison Hot Springs.
Highway 9 is 16 km (10 mi) long. In the south, the Highway starts at an interchange on Highway 1 between Rosedale and the Bridal Falls area. Highway 9 travels north for 2.8 km (1.7 mi) to its 1.9-kilometre-long (1.2 mi) bridge over the Fraser River. After crossing the Fraser, Highway 9 – road conditions travels north for 2.5 km (1.6 mi) to the centre of Agassiz. On the north side of Agassiz, Highway 9 meets Highway 7, and the two highways share a common alignment for 1.6 km (1.0 mi). Highway 9 then travels 6.4 km (4.0 mi) north to terminate at Harrison Hot Springs.
Highway 7 Road Condition Reports
Highway 1 Road Condition Reports