BC Highway 7 – Lougheed Highway Road Reports
Highway 7 – Lougheed Highway Road Conditions and Weather Cams
Mission to Hope Weather and Road Condition Cams
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. July 7-12, 14-19, 21-26, 27-Aug 1. No work Aug 2-4. Construction speed zone 50km/h. Expect delays. minor construction | last updated Mon Jul 7 at 6:58 AM PDT. | next update Mon Aug 4 at 3:00 PM PDT. |
Highway 7 (Lougheed Highway), in both directions. Paving operations between Seabird Island Rd and Ross Rd for 26.4 km (Kent to Hope). Until Sat Jul 12 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Lane closures in both directions in effect. Access to some intersections and side roads may be restricted during work hours. Please follow posted construction signs and expect delays. minor construction | last updated Sun Jun 22 at 11:39 AM PDT. |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Thu Jul 31 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT daily. Watch for traffic control. Traffic control to not take place during a long weekend. minor construction | last updated Mon Jun 23 at 3:37 PM PDT. |
Highway 7 (Lougheed Highway). Heavy rain between 287 St and Holachten Dr for 33.1 km (Maple Ridge to 11 km west of Kent). minor weather condition | last updated Wed Jul 9 at 8:32 AM PDT. |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Maria Lane and Junction with Highway 9 for 2.6 km (Kent). Starting Mon Jul 14 until Fri Jul 25. From 9:00 AM to 4:00 PM PDT daily. Centre lane will be blocked. Watch for traffic control personnel. minor construction | last updated Wed Jul 9 at 9:39 AM PDT. |
Highway 9 Road Condition Reports
Hemlock Valley Road Conditions