BC Highway 1 Road Conditions today for the Trans Canada Highway Route 1
Links to View Weather Cameras
Hwy 1 – Fraser Valley Traffic and Weather Cameras
Highway 1 Hope to Kamloops Weather and Road Condition Cams
Hwy 1 Kamloops to Sicamous Weather Cams
Highway 1 Sicamous to Revelstoke Weather Cameras
Hwy 1 Revelstoke to Golden BC Weather Cameras
Highway 1 Golden though to Alberta Weather Cameras
Road Conditions Report
Highway 1, in both directions. Construction work between Columbia West FSR and Wiseman Rd for 8.1 km (18 to 10 km east of East Boundary of Glacier National Park). Until Thu Nov 23, 2023. From 7:00 AM to 6:00 PM MST on weekdays and Saturday. Watch for traffic control. Expect minor delays. minor construction | last updated Thu Feb 24 at 2:36 PM MST. |
Highway 1, in both directions. Construction work between Junction Hwy 8 and Cornwall Rd for 38.6 km (9 km south of Cache Creek to Spences Bridge). Until Tue Nov 15 at 5:00 PM PST. Single lane alternating traffic. Expected delays of 5 minutes. Watch for signage and personnel. minor construction | last updated Sun Jan 9 at 6:57 PM PST. |
Highway 1, in both directions. Road sweeping between Savona Access Rd and Abbey Rd for 24.3 km (6 to 30 km west of Kamloops). Watch for slow moving vehicle. minor construction | last updated Thu May 12 at 7:26 AM PDT. |
Highway 1, in both directions. Watch for falling rocks between Shuswap Ave and Trans-Canada Hwy Frtg for 3.1 km (Chase). Watch for falling rock at Jade Mountain. minor incident | last updated Sun May 22 at 4:06 PM PDT. |
Highway 1 (on Vancouver Island). Utility work planned between Norcross Rd and Sprott Rd for 0.5 km (2 km north of Duncan). Starting Tue May 24 at 9:00 AM PDT until Tue May 24 at 3:00 PM PDT. Expect delays. Right lane will be closed. minor construction | last updated Wed May 18 at 12:29 PM PDT. |
Highway 1, in both directions. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Watch for traffic control. Expect delays. Loads over 3.8 metres in width restricted. Road open with sections of single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Mon May 23 at 12:15 AM PDT. major construction | last updated Sun May 22 at 1:04 AM PDT. |
Highway 1, westbound. Utility work between Exit 165: Flood Rd and Exit 160: Hunter Creek Rd for 4.7 km (Hope). Until Sat Jun 4 at 6:00 PM PDT. Lane Closure. Speed Reduction to 80 KM. minor construction | last updated Thu May 12 at 5:09 PM PDT. |
Highway 1 (on Vancouver Island). Utility work planned between Frayne Rd and Deloume Rd for 1.2 km (Mill Bay). Starting Tue May 24 at 9:00 AM PDT until Tue May 24 at 3:00 PM PDT. Expect delays. Right lane will be closed. minor construction | last updated Tue May 17 at 3:31 PM PDT. |
Highway 1, westbound. Construction work at Exit 8: Cypress Bowl Rd (West Vancouver). Until Sat Jul 16. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Cypress Bowl on ramp closure. minor construction | last updated Thu May 5 at 10:05 AM PDT. |
Highway 1 (on Vancouver Island). Utility work planned between Saanich Rd and Galloping Goose Trail for 0.3 km (Saanich). Starting Wed May 25 at 10:00 PM PDT until Thu May 26 at 6:00 AM PDT. Left lane will be blocked. Right lane will be closed. minor construction | last updated Thu May 5 at 2:02 PM PDT. |
Highway 1, westbound. Road construction work between Exit 73 and 208 St for 12.8 km (Langley - District). Until Mon Jun 6. From 7:30 PM to 5:00 AM PDT on weekdays and Saturday. Left shoulder closed. Left lane is blocked. minor construction | last updated Mon Mar 14 at 9:12 AM PDT. |
Highway 1, in both directions. Road construction work between 208 St and Exit 73 for 12.8 km (Langley - District). Until Sat Jun 25. From 8:00 AM to 5:30 PM PDT on weekdays and Saturday. Left shoulder closed. Left lane is blocked. minor construction | last updated Mon Mar 14 at 9:07 AM PDT. |
Highway 1, in both directions. Construction work at Exit 58: 200 St (Langley - District). Until Wed Jun 1. Lane Closure. Work will be completed in phases to ensure two lanes remain open in each direction on 200th street and full access to the Highway 1 off-ramps, some delays should be expected. For more information: https://news.Gov.Bc.Ca/releases/2021TRAN0185-002391. Next update time Wed Jun 1. minor construction | last updated Mon Mar 28 at 8:27 AM PDT. |
Highway 1, eastbound. Construction work between Exit 150: 160 St and Exit 53: 176th St / Highway 15 for 3.3 km (Surrey). Until Thu Jul 7 at 7:00 AM PDT. Shoulder closed. Work to extend to 10 AM on Saturdays only. minor construction | last updated Tue Mar 29 at 11:19 AM PDT. |
Highway 1. Watch for falling rocks between Golden Donald Upper Rd and Ten Mile Hill Truck Stop Rd for 15.5 km (Golden to 9 km west of West Boundary of Yoho National Park). minor incident | last updated Fri May 20 at 5:24 AM MDT. |
Highway 1, westbound. Construction work between Exit 7: Westridge Ave and Almondel Rd (West Vancouver). Until Tue Sep 6. From 7:00 AM to 7:00 PM PDT daily. Watch for traffic control. Westmount Road off ramp closure. minor construction | last updated Thu May 5 at 10:08 AM PDT. |
Highway 1, westbound. Road construction work between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave (West Vancouver). Until Fri May 27. From 10:00 PM to 5:00 AM PDT daily. Right lane closed. Barrier installation will take place at entry to Westmount off ramp. minor construction | last updated Mon May 16 at 2:53 PM PDT. |
Highway 1, in both directions. Utility work planned between Dogwood Valley Rd and Emory Creek Rd for 0.9 km (7 km south of Yale to 7 km north of Hope). Starting Mon May 30 until Fri Jun 10. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed in both directions. Expect delays. minor construction | last updated Fri May 20 at 4:05 PM PDT. |
Highway 1, in both directions. Road maintenance work between Exit 66: 232nd St and 248 St (Langley - District). Until Sat Jun 25. From 8:30 PM to 5:30 AM PST daily. Watch for traffic control. Expect minor delays. Lane closures in both directions in effect. minor construction | last updated Fri Mar 11 at 4:59 PM PST. |
Highway 1 (on Vancouver Island). Utility work planned between Shawnigan-Mill Bay Rd and Nightingale Rd for 0.9 km (Mill Bay). Starting Tue May 24 at 9:00 AM PDT until Tue May 24 at 1:00 PM PDT. Expect delays. Right lane will be closed. minor construction | last updated Wed May 18 at 3:57 PM PDT. |
Highway 1 (on Vancouver Island). Utility work between West Shore Pky and Finlayson Arm Rd (Langford). Until Thu May 26. From 10:00 PM to 6:00 AM PDT on weekdays. Expect delays. Right lane closed. minor construction | last updated Tue May 10 at 1:17 PM PDT. |
Highway 1, eastbound. Utility work between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd (Hope). Until Sat Jun 4 at 6:00 PM PDT. Lane Closure. Speed Reduction to 80 KM. minor construction | last updated Thu May 12 at 5:18 PM PDT. |
Highway 1, in both directions. Blasting at Shuswap Ave (Chase). Until Wed Aug 31. From 10:00 AM to 3:00 PM PDT daily. Expect delays up to 30 minutes. minor construction | last updated Wed Apr 20 at 9:08 AM PDT. |
Highway 1 (on Vancouver Island). Construction work between Exit 16: Leigh Rd and Wellswood Rd for 4.8 km (Langford). Until Wed Nov 30. Expect delays due to congestion. minor construction | last updated Wed Feb 23 at 7:11 AM PST. |
Highway 1. Construction work planned between Golden Donald Upper Rd and Yoho Bridge (4 km east of Golden). Starting Tue May 24 at 12:00 PM MDT until Tue May 31 at 10:00 PM MDT. Single lane alternating traffic 9AM-3PM MDT Mon-Sat. Delays of 30 minutes expected. Overnight closures 10PM-7AM MDT Sun-Fri night. Alt. Route is available via Hwy 95 and Hwy 93S. Allow 1.5hrs additional travel time. Next update time Tue May 31 at 3:00 PM MDT. major construction | last updated Thu May 19 at 10:35 AM MDT. |
Highway 1, westbound. Paving operations planned between Exit 135 and Annis Rd (Chilliwack). Starting Tue May 24 until Sat May 28. From 7:00 PM to 6:00 AM PDT daily. Lane Closure. Expect delays. minor construction | last updated Fri May 20 at 3:42 PM PDT. |
Highway 1. Road construction work between Columbia West FSR and Wiseman Rd for 6.0 km (10 to 16 km east of East Boundary of Glacier National Park). Until Tue Jun 14 at 11:00 PM MDT. Bridge construction. Single lane alternating traffic. Expect delays. Watch for traffic control. Quartz Creek Bridge Replacement and 4 laning. Exception to work schedule: 30 minute closure May 19 330pm-4pm. Work will not occur from Noon May 20 to Noon May 24, 2022. minor construction | last updated Wed May 18 at 8:24 AM MDT. |
Highway 1. Geotechnical investigation planned between Main St and Nicoamen River Rd for 15.2 km (Lytton). Starting Tue May 24 at 7:00 AM PDT until Fri May 27 at 6:00 PM PDT. Single lane alternating traffic will be in effect. minor construction | last updated Tue May 17 at 7:36 AM PDT. |
Highway 1, in both directions. Maintenance between 208 St and Exit 73 for 11.8 km (Langley - District). Until Sat Jun 25 at 8:00 PM PDT. From 5:00 AM to 8:00 PM PDT daily. Shoulder closed. Drop off or pick up of crews or temporary stops for surveys and inspections. minor construction | last updated Mon Mar 14 at 9:11 AM PDT. |
Highway 1, in both directions. Watch for falling rocks between Canoe Beach Dr NE and Perry River Bridge for 39.1 km (Sicamous). Watch for falling rock in the area. minor incident | last updated Sun May 22 at 4:06 PM PDT. |
Highway 1, in both directions. Utility work planned between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd (Hope). Starting Wed Jun 15 until Fri Jul 15. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed in both directions. Expect delays. minor construction | last updated Fri May 20 at 4:52 PM PDT. |
Highway 1, in both directions. Bridge construction between Regent St and Toll Rd (Yale). Until Mon Oct 31. Road construction work. Single lane alternating traffic. Expect delays. Watch for traffic control. Speed reduced to 30km/h. minor construction | last updated Tue Mar 15 at 10:51 AM PDT. |
Highway 1, northbound. Utility work planned between American Creek Rd and Doolan Rd for 0.1 km (Hope). Starting Tue May 24 at 8:00 AM PDT until Fri Jun 10 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Expect delays. minor construction | last updated Fri May 20 at 3:15 PM PDT. |
Highway 1, northbound. Utility work planned at Parklane Dr (5 km north of Hope). Starting Mon May 30 at 8:00 AM PDT until Fri Jun 10 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. minor construction | last updated Fri May 20 at 4:26 PM PDT. |
Highway 1, westbound. Vehicle recovery planned between Illecillewaet Campground and Hemlock Grove Boardwalk (4 km west of Rogers Pass Summit). Starting Mon May 23 at 7:00 AM PDT until Mon May 23 at 12:00 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Next update time Mon May 23 at 11:00 AM PDT. minor incident | last updated Sun May 22 at 2:39 PM PDT. |
Route Description
Highway 1 is the main route of the Trans-Canada Highway (TCH) through British Columbia, Canada. Its total accumulated distance through British Columbia is 1,039 km (646 mi), including the distance travelled on ferries. Road Conditions Hwy 1 Hope to Banff and Alberta
Road Condition Reports for the Coquihalla Hwy5 and Highway 97C
Check BC Highway and Road Closures Today
