BC Vancouver Island Road Conditions reports – Road reports for all Vancouver Island region.
Highway 19A Traffic and Weather Cameras – Courtenay
Highway 4 Sutton Pass Hwy 19 through Port Alberni, Sutton Pass to Tofino.
Highway 1 (on Vancouver Island). Utility work between Crace St and Bastion St for 0.6 km (Nanaimo). Until Sun Dec 31 at 11:45 PM PDT. From 12:00 AM to 11:45 PM PDT on weekdays. Left lane is closed. Left turn lane closed. Inside lanes closed for Nanaimo Utility rehabilitation project. Motorists should obey construction signage and TCPs. No work on holidays. major construction | last updated Fri Sep 8 at 12:01 PM PDT. | next update Fri Oct 13 at 11:45 AM PDT. |
Highway 1 (on Vancouver Island), northbound. Utility work planned between Edgelow Rd and Platt Rd for 0.4 km (2 km south of Ladysmith). Starting Thu Oct 5 at 9:00 AM PDT until Thu Oct 5 at 11:00 AM PDT. Right lane will be closed. Highway 1 northbound right lane closed between Edgelow Rd S and Platt Rd October 5th from 9AM - 11AM. minor construction | last updated Fri Sep 22 at 3:49 PM PDT. |
Highway 4. Utility work between Industrial Way and Tofino-Ucluelet Hwy for 30.4 km (Tofino to 1 km east of Southern Boundary of Pacific Rim National Park). Until Thu Nov 30 at 5:00 PM PDT. Single lane alternating traffic. Moving work zone in place for BC Hydro pole and line work. East bound lane will be closed by work zone, and speed limits in the work zone will be reduced to 50 km/h. minor construction | last updated Thu Jul 13 at 2:12 PM PDT. |
Highway 1 (on Vancouver Island), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Sat Nov 30, 2024 at 7:00 PM PDT. Lane closures in both directions in effect. Construction speed zone in effect. One bridge will be closed for repairs with all traffic diverted onto the adjacent bridge. Expect minor delays. minor construction | last updated Sun Jun 25 at 8:31 PM PDT. |
Highway 4, in both directions. Construction work planned between Maltby Rd and Radar Hill for 0.5 km (North Boundary of Pacific Rim National Park in Tofino). Starting Wed Oct 18 at 10:30 AM PDT until Thu Oct 19 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. minor construction | last updated Wed Sep 27 at 3:12 PM PDT. |
Highway 4. Fog patches between Sutton Pass Summit and the end of Highway 4 for 85.5 km (2 km west of Sutton Pass Summit to Qualicum Beach). minor weather condition | last updated Tue Oct 3 at 6:40 AM PDT. |
Highway 1 (on Vancouver Island). Fog patches between Shawnigan Lake Rd and Mt Sicker Rd for 43.0 km (4 km south of Malahat Summit to 2 km south of Chemainus). minor weather condition | last updated Tue Oct 3 at 6:43 AM PDT. |
Allenby Road. Mudslide between Miller Road and Boys Road. Road closed. Assessment in progress. Alternate routes available. major incident | last updated Mon Aug 14 at 5:37 PM PDT. | next update Sun Jun 2, 2024 at 3:00 PM PDT. |
Highway 1 (on Vancouver Island), in both directions. Utility work planned between Campbell St and Dawes St for 0.3 km (Nanaimo). Starting Tue Oct 3 at 7:00 PM PDT until Fri Oct 20 at 5:00 AM PDT. Northbound lane will be closed. Northbound closed for trenching. Southbound left lane for northbound traffic. Obey construction signs. Estimated time of re-opening Fri Oct 20 at 5:00 AM PDT. minor construction | last updated Mon Sep 25 at 11:53 AM PDT. |
Highway 4, in both directions. Ditching between Tofino-Ucluelet Hwy and Taylor River Rest Area for 50.9 km (2 km east of Sutton Pass Summit to 1 km east of Southern Boundary of Pacific Rim National Park). Until Mon Oct 9 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. minor construction | last updated Fri Sep 22 at 2:36 PM PDT. |
Highway 4, in both directions. Maintenance between Cathedral Grove/MacMillan Prov Park and Koen Rd for 7.0 km (Cathedral Grove). Highway is open to two lanes. Construction zone remains in place, obey traffic control and expect minor delays. Oversize vehicles/loads over 3.2m in width must contact Permit Centre for instructions. See https://rb.Gy/9h0x3 for more info. major construction | last updated Fri Sep 29 at 12:05 PM PDT. | next update Fri Oct 20 at 12:00 PM PDT. |
Keating Cross Road, in both directions. Construction work at Barbara Drive. Exit ramp is closed. Access to Barbara Drive from Keating Cross Road to be permanently closed for the construction of the Keating Crossroad Flyover. major construction | last updated Wed Jul 12 at 2:19 PM PDT. | next update Mon Jul 1, 2024. |
Jubilee Parkway, in both directions. Shoulder maintenance between Highway 19 and Highway 19A. Until Fri Oct 6 at 5:00 PM PDT. From 7:30 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Watch for slow moving equipment. minor construction | last updated Thu Sep 28 at 7:56 AM PDT. |
Highway 19, in both directions. Shoulder maintenance between 14th Ave and Hamm Rd for 25.8 km (Campbell River). Until Fri Oct 6 at 5:00 PM PDT. From 7:30 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Watch for slow moving equipment. minor construction | last updated Thu Sep 28 at 8:06 AM PDT. |
Highway 19, in both directions. Shoulder maintenance between Browns Bay Rd and Hamm Rd for 44.8 km (Campbell River). Until Fri Oct 6 at 5:00 PM PDT. From 7:30 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Watch for slow moving equipment. minor construction | last updated Thu Sep 28 at 8:01 AM PDT. |
Highway 19A, in both directions. Shoulder maintenance between Catherwood Rd and Jubilee Pky for 11.3 km (12 km south of Campbell River to Campbell River). Until Fri Oct 6 at 5:00 PM PDT. From 7:30 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Watch for slow moving equipment. minor construction | last updated Thu Sep 28 at 8:11 AM PDT. |
Highway 14, in both directions. Construction work between Ludlow Rd and Kangaroo Rd for 6.0 km (Sooke to Metchosin). 4-Lanes active, follow posted speed limit. Watch for changing traffic patterns and follow the direction of traffic control. Expect minor delays. minor construction | last updated Sat Sep 30 at 7:17 PM PDT. |
Canal Road, in both directions. Geotechnical investigation at Mt Norman Access Rd.. Single lane alternating traffic. Watch for traffic control. Expect delays. Slow down to 20km/hour. minor construction | last updated Sat Sep 30 at 7:10 PM PDT. | next update Fri Oct 13 at 12:00 PM PDT. |
Highway 17, northbound. Construction work between Old East Rd and Exit 19: Island View Rd for 2.1 km (Central Saanich). Until Sat Jun 1, 2024 at 6:00 AM PDT. Lane Closure. Expect delays. minor construction | last updated Sat Sep 30 at 7:18 PM PDT. |
Highway 17, in both directions. Construction work between East Saanich Rd and Danica Pl (Central Saanich). Until Sat Jun 1, 2024. Exit ramp is closed. Permanent Closure of Highway 17 offramp at East Saanich Crossroad. Detour via Island View Road. minor construction | last updated Sat Sep 30 at 7:18 PM PDT. |
Keating Cross Rd. , southbound. Construction work at Highway 17 On Ramp. Until Mon Jun 3, 2024. Entrance ramp closed. Detour in effect. Detour required to access Highway 17. minor construction | last updated Sat Sep 30 at 7:18 PM PDT. |
Highway 1 (on Vancouver Island), northbound. Utility work between Drinkwater Rd and Sprott Rd for 1.5 km (Duncan to 2 km north of Duncan). Until Fri Oct 6 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays. Left turn lane closed. Right turn lane closed. minor construction | last updated Sat Sep 30 at 7:11 PM PDT. |
Highway 1 (on Vancouver Island), in both directions. Tree pruning between Shawnigan-Mill Bay Rd and Nightingale Rd for 2.7 km (Mill Bay to Cobble Hill). Until Mon Oct 16 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. No work will be done on September 29th, October 2nd, 6th, and 9th. minor construction | last updated Sat Sep 30 at 7:13 PM PDT. |
Hillside Road, in both directions. Construction work planned between 3359 Hillside Road and 3356 Hillside Road in Chemainus. Starting Mon Oct 16 at 7:00 AM PDT until Fri Oct 20 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Roadway will be reduced to one lane. Traffic to 3356 and 3359 Hillside Road potentially impacted. Single lane available for traffic. minor construction | last updated Mon Sep 25 at 12:00 PM PDT. |
Martindale Rd. . Construction work at Highway 17 On Ramp. Until Sat Jun 8, 2024. Entrance ramp closed. Access to Martindale Rd from Highway 17 will be permanently closed. Access to Martindale Rd from Gliddon Road will remain open. minor construction | last updated Sat Sep 30 at 7:15 PM PDT. |
Highway 17, northbound. Utility work between Danica Pl and Exit 19: Island View Rd (Central Saanich). From 5:30 AM to 7:30 AM PDT on Tuesday. Right turn lane closed. minor construction | last updated Sat Sep 30 at 7:17 PM PDT. |
Highway 1 (on Vancouver Island), in both directions. Construction work between Finlayson Arm Rd and Wellswood Rd for 4.3 km (Goldstream Provincial Park to 1 km north of Langford). Minor delays up to 20 min outside peak travel. Vehicle Width Permit over 3.8 meters may be available (Commercial Transport Notice #05-21, Amended: 13JULY22]. Single lane alternating traffic overnight starting September 11th (9PM to 5AM). minor construction | last updated Sat Sep 30 at 7:17 PM PDT. |
Highway 19, northbound. Utility work between Exit 16 and East Wellington Rd for 0.7 km (Nanaimo). Until Tue Oct 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Watermain work on shoulder north of Jingle Pot Road to Hwy 19 from Jingle Pot Rd. Speed limits reduced to 70km/h. major construction | last updated Tue Jul 4 at 8:04 PM PDT. | next update Tue Oct 31 at 3:00 PM PDT. |
Highway 19, northbound. Road maintenance work between Englewood Dr and Zeballos Mainline for 21.3 km (Woss). Until Tue Oct 3 at 6:00 PM PDT. Single lane alternating traffic. Watch for traffic control. minor construction | last updated Mon Oct 2 at 3:23 PM PDT. |
Highway 14, in both directions. Construction work between Ludlow Rd and Manzer Rd for 2.5 km (Sooke). Until Thu Oct 5 at 6:00 AM PDT. Right lane is blocked. Shoulder closed. Culvert replacement. minor construction | last updated Sat Sep 30 at 7:09 PM PDT. |
Comox Road, northbound. Paving operations between Kennedy Street and Terminal Avenue in Nanaimo. Until Fri Oct 20 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Comox road reduced to 2 lanes for paving. Motorists travelling from Terminal Avenue onto Comox Road WB may experience minor delays. Estimated time of re-opening Fri Oct 20 at 7:00 PM PDT. minor construction | last updated Wed Sep 27 at 10:24 AM PDT. |
Highway 28, in both directions. Bridge construction between Gold River Hwy and Western Mine Rd (38 km west of Campbell River). Until Mon Oct 30 at 12:00 PM PDT. Single lane alternating traffic. Watch for traffic control. With traffic lights 30 km/h speed zone through detour. Expect up to 15 min delays 7am-6pm Monday to Saturday. major construction | last updated Fri Sep 1 at 12:08 PM PDT. | next update Mon Oct 30 at 12:00 PM PDT. |
Highway 1 (on Vancouver Island), northbound. Construction work between Highview Terr and Milton St for 0.8 km (Nanaimo). Until Wed Oct 4 at 3:30 PM PDT. Right lane closed. Shoulder closed. Moving work zone in right lane for sidewalk rehabilitation. Estimated time of re-opening Thu Sep 28 at 3:30 PM PDT. minor construction | last updated Thu Sep 28 at 1:34 PM PDT. |
Highway 14, in both directions. Utility work planned between Happy Valley Rd and Jacklin Rd for 0.8 km (Colwood to Langford). Starting Wed Oct 11 at 7:00 PM PDT until Thu Oct 12 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Expect minor delays and watch for traffic controllers. major construction | last updated Wed Sep 27 at 1:22 PM PDT. | next update Thu Oct 12 at 6:00 AM PDT. |
Highway 14 Road Condition Reports to Sooke BC