• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

British Columbia Highway News

Integrating BC Transportation Travel News Services and Products

  • BC Road Report News
  • Closures & Incidents
  • Mountain Pass Webcams
  • Canada / USA – Border Cameras
  • About us

Rocky Mountain Road Conditions

by

Rocky Mountain Road Conditions

Highway 1 BC Road Report and Highway Conditions

Road reports and travel conditions through Rocky Mountain highway routes

Rest area closed at Highway 1, Redgrave Rest Area. Starting Tue Jul 14. Last update: September 15th, 2026 at 9:06pm MDT. Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses.
minor construction | last updated
Construction work from Highway 1, At W/B Exit to Illecillewaet Brake Check / Rest Area to At Jack Macdonald Snowshed. Starting Tue Jul 14 until Fri Oct 30. All day, every day. Speed Limit restriction: 50 km/hr. Last update: October 14th, 2026 at 10:04am PDT. Active construction within area. Intermittent 30 minute stoppages possible between 7 AM to 5 PM Mon to Sat. Reduced speed. Drive with caution.
minor construction | last updated
Construction work from Highway 1, At Quartz Creek Bridge to Wiseman Road. Starting Mon Apr 20 until Sun Dec 20. Expect delays. Watch for traffic control. Width restriction: 5 meters. Last update: September 15th, 2026 at 9:06pm MDT. Expect single lane alternating traffic 24 hours a day Sept 15th to Nov 7th.
minor construction | last updated
Washrooms closed at Highway 1, In Revelstoke and at Revelstoke Rest Area. Until Sat Oct 31. Watch for traffic control. Last update: September 15th, 2026 at 8:06pm PDT. The Revelstoke Rest Area will be closed due to highway upgrades in the area. Nearby rest areas remaining open: Illecillewaet Break check - Commercial and passenger, Rutherford rest area - Passenger, Shelter Bay rest area - Passenger and The Last Spike rest area - commercial and passenger.
minor incident | last updated
Construction work from Highway 93, In Radium Hot Springs and 151m Northeast of Jctn Hwy 93/95 (93 Splits Into 95 North and 93 East) to In Radium Hot Springs and West Boundary of Kootenay National Park. Starting Mon Jun 1 until Tue Dec 1. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 30 kmh. Width restriction: 3.7 metres maximum. Last update: September 15th, 2026 at 9:06pm MDT.
minor construction | last updated
Ditch maintenance. Starting Tue Jul 21. From 8:00 AM to 5:00 PM PST on Tuesday. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated
Road construction from Highway 93, In Radium Hot Springs and 800m South of Jctn Highway 93/95 (93 Splits Into 95 North and 93 East) to In Radium Hot Springs. Starting Mon Aug 10 until Wed Oct 28. All day, weekdays. Lane closures in both directions. Expect delays. Watch for traffic control. Width restriction: 4.65M. Last update: October 15th, 2026 at 7:44am MDT. Southbound direction reduced to 4.65 M.
minor construction | last updated
Road maintenance from Highway 1, At Bench Snowshed. Starting Tue Sep 8 until Fri Oct 30. All day, every day. Last update: September 15th, 2026 at 8:06pm PDT. Snowshed maintenance. Intermittent short term stoppages. Speeds reduced to 30 km/hr. Lane width reduced to 3.2m. Watch for traffic control and expect delays. Please reach out to Online Constructors at 604-791-8264 to coordinate wide load passage.
minor construction | last updated
Bridge construction at Kicking Horse Drive. Starting Thu Oct 1. All day, every day. Closed for repairs. Truck restriction. Width restriction: 2.6m. Last update: October 3rd, 2026 at 7:38am MDT. Minor delays 19:00 ¿¿¿ 23:00. October 1 to Dec 15 Closed 19:00hr until 23:00hr for 15 mins at the start of each hour. Starting at 23:00hr, the bridge will be closed and remain closed until 06:00hr Width restriction 2.6m in effect 24/7.
major construction | last updated
Geotechnical investigation from Highway 23, Bigmouth Creek Bridge to Mica Dam. Starting Thu Oct 15 until Wed Oct 21. From 7:00 AM to 5:30 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: October 1st, 2026 at 8:51am PDT.
minor construction | last updated
Electrical maintenance at Highway 1, In Revelstoke. Starting Thu Oct 22 until Thu Oct 22. Right lane closed. Watch for traffic control. Last update: October 14th, 2026 at 5:05pm PDT.
minor construction | last updated
Utility work from Highway 23, In Revelstoke and Brake check at the top of Revelstoke Dam to In Revelstoke and Forestry Museum Access Road. Starting Thu Oct 29 until Thu Oct 29. From 8:00 AM to 5:00 PM PDT, Thursday. Single lane alternating traffic. Watch for traffic control. Last update: October 16th, 2026 at 1:23pm PDT.
minor construction | last updated
Road maintenance from Highway 3, In Sparwood to In Sparwood and At BC/AB Border. Starting Wed Oct 21 until Fri Oct 23. From 7:00 AM to 7:00 PM MDT, Wednesday to Friday. Single lane alternating traffic. Last update: October 18th, 2026 at 8:31pm MDT. Rumble Strips Work. Watch for signage and personnel. Expect minor delays.
minor construction | last updated
Ditch maintenance from Highway 1, At Yoho Bridge (Kicking Horse River) to Golden-Donald Upper Road, In Golden and At Golden Donald Upper Road and Golden-Donald Upper Road. Starting Mon Oct 19 until Thu Oct 22. From 8:00 AM to 4:00 PM MDT, Monday to Thursday. Right lane closed. Last update: October 19th, 2026 at 7:48am MDT.
minor construction | last updated
Road construction at Highway 95A, In Kimberley. Starting Mon Oct 19 until Tue Oct 20. Watch for traffic control. Expect delays. Traffic signal out. Last update: October 20th, 2026 at 8:59am MDT.
minor construction | last updated
Bridge construction at Kootenay Crossing Warden Station, At Highway 93 and Kootenay Crossing Warden Station. Starting Mon Jun 22 until Wed Nov 25. From 7:00 AM to 7:00 PM MDT, every day. Speed Limit restriction: 50km/hr. Last update: October 19th, 2026 at 12:03pm MDT. Expect short intermittent stoppages.
minor construction | last updated
Utility work from Highway 1, In Revelstoke and At Alpine Lane W to Alpine Lane W, In Revelstoke and At Alpine Lane W and Trans-Canada Highway E. Starting Mon Oct 26 until Fri Nov 6. From 8:00 AM to 4:00 PM PDT, weekdays. Shoulder closed. Watch for traffic control. Last update: October 19th, 2026 at 1:25pm PDT. Speed reduction with closures up to once per day of less than 5 minutes.
minor construction | last updated
Vehicle recovery from Highway 1, At Woolsey Creek Bridge to At Albert Canyon Chain Up Area. Starting Wed Oct 21 until Wed Oct 21. From 8:00 AM to 5:00 PM PDT, Wednesday. Single lane alternating traffic. Last update: October 19th, 2026 at 1:23pm PDT.
minor construction | last updated
Road construction from Highway 1, Three Valley Frontage Road to At Three Valley Avalanche Gate. Starting Thu Oct 22 until Thu Oct 22. Expect delay of 20 minutes. Last update: October 19th, 2026 at 2:27pm PDT.
minor construction | last updated
 

Mountain Pass Weather Cameras

Rogers Pass Weather Cam

Alberta Road Conditions

Filed Under: Area, Road Reports

Primary Sidebar

Caribbean Business for Sale

Move to Sint Maarten with this incredible opportunity 

Best Personal Breathalyzer

Personal Breathalyzer
Dont risk a DUI. Make sure you don’t drive while impaired Get a personal breathalyzer check your alcohol levels and drive responsibly.




This 'travel news' services website is privately owned. It is not affiliated or sanctioned by the Government of BC, nor is it part of the provincial governments - DriveBC program or websites, operated by the BC Ministry of Transportation and Infrastructure. The data and electronic links provided in this web site are for informational purposes only and bchighway.com disclaims all responsibility for the accuracy of site content or linked information. This information obtained from bchighway.com should not be used as a basis for making financial or other commitments. Privacy Agreement © 1996–2026 bchighway.com - All Rights Reserved.