BC Lower Mainland – Road Conditions
Up to date road reports for the greater Vancouver and lower mainland
| Road maintenance from Highway 3, Second Avalanche Gate. Starting Wed Dec 10. Open to traffic. Watch for traffic control. Speed Limit restriction: 30 km/h in Manning Park 42km east of Hwy 5 junction. Last update: September 1st, 2026 at 11:02am PDT. One lane open in each direction. major construction | last updated |
| Washout at Silver Skagit Road, In Hope. Last update: September 15th, 2026 at 8:01pm PDT. Next update: March 1st, 2027 at 11:00am MST. Road has been impacted by washout, repairs are underway. Expect delays in both directions and drive with caution. minor incident | last updated |
| Bridge construction. Starting Mon Mar 9. Reduced to one lane in each direction. Expect delays northbound on Mt Lehman Rd and on the westbound Highway 1 on-ramp. More info: https://www2.gov.bc.ca/gov/content/transportation-projects/fraser-valley-highway1/264th-street-to-mt-lehman-road/mt-lehman-road-interchange. major construction | last updated |
| Construction work. Starting Sat Nov 15 until Mon Nov 15. Access to side lane closed. Eastbound lanes unaffected. Watch for crews. minor construction | last updated |
| Construction work at Howes Street, In New Westminster and Boyd Street. Starting Thu Apr 16 until Fri Nov 13. From 9:00 AM to 8:00 PM PDT, Saturday. From 7:00 AM to 8:00 PM PDT, weekdays. Last update: October 9th, 2026 at 10:56am PDT. Right turn lane closed and 30 km/h speed limit in effect 24/7. minor construction | last updated |
| Bridge maintenance. Starting Thu Mar 26 until Sun Nov 15. From 9:30 PM to 9:00 AM PST on Saturday and Sunday. From 9:30 PM to 5:00 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Reduced to one lane each direction. Watch for crews and expect a speed limit reduction. major construction | last updated |
| Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025. major construction | last updated |
| Construction work. Starting Fri Jun 5 until Sat Oct 31. Watch for traffic control. Lane shift in effect. Traffic will be detoured north of the highway to get by the work site. This will remain in effect 24/7. major construction | last updated |
| Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions. major construction | last updated |
| Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction. major construction | last updated |
| Mowing. Starting Mon Jun 29. From 7:00 AM to 3:00 PM PST on Monday, Tuesday, Wednesday, and Thursday. Watch for traffic control. Slow moving vehicle - shoulder mowing in progress. Watch for traffic control from Boston Bar northbound to Jackass Summit. minor construction | last updated |
| Paving operations. Starting Mon Jul 13 until Sat Oct 31. From 5:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, and Sunday. Single lane alternating traffic. Watch for traffic control. Expect delays. minor construction | last updated |
| Road construction. Starting Fri Jul 10 until Sat Oct 31. Closed. Traffic will be shifted to the north of the median around 256th St and and will cross over around Lefeuvre Rd. Existing eastbound lanes will be closed. This will remain in place 24/7. major construction | last updated |
| Road maintenance. Starting Mon Jul 13 until Tue Dec 22. Lane closures in both directions. Watch for traffic control. Expect alternating lane closures in both directions 24/7. Watch for traffic control. minor construction | last updated |
| Construction work at Chilliwack Lake Road, 700 metres east of Edward Rd west intersection, for 600 metres. Starting Fri Aug 21 until Sat Oct 31. From 7:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: August 20th, 2026 at 4:49pm PDT. Work on Aug 21 from 7am-12pm only. minor construction | last updated |
| Construction work from Highway 10, In Langley - District and 286m South of Exit to 72 Avenue & Highway 1 Eastbound to In Langley - District and 65m North of Exit to 72 Avenue & Highway 1 Eastbound. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:37am PDT. minor construction | last updated |
| Road construction from Highway 1, In Langley - District and 23m Southeast of 216 Street Underpass to In Langley - District and At 232 Street Underpass. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:41am PDT. Eastbound lane shift. Watch for crews and signage. minor construction | last updated |
| Utility work from Highway 99, In Vancouver and W 70th Ave to In Vancouver and W 71 Ave. Starting Mon Aug 24 until Sat Oct 31. From 9:30 AM to 3:00 PM PDT, Monday to Thursday. Right lane closed. Last update: September 25th, 2026 at 2:25pm PDT. minor construction | last updated |
| Construction work from 264 Street, In Langley - District and At 58 Ave to Highway 13, In Langley - District and At 52 Ave. Starting Fri Aug 28 until Sat Oct 17. All day, every day. Detour in effect. Watch for traffic control. Last update: August 28th, 2026 at 6:41am PDT. Northbound and southbound traffic will be shifted west onto a new bridge in order to demolish existing bridge and continue various work. major construction | last updated |
| Paving operations from Highway 1, In Hope and Exit 171: Old Hope-Princeton Highway to Exit 146. Starting Mon Aug 31 until Sat Oct 31. From 6:00 AM to 6:00 PM PDT, Monday to Saturday. Watch for traffic control. Last update: September 29th, 2026 at 12:13pm PDT. Watch for crews and equipment working. Speeds reduced to 60km/h through work zones. Detours will be in effect for off and on-ramp closures when night work takes place. minor construction | last updated |
| Paving operations from Highway 3, In Hope and First Avalanche Gate to Exit 171: Old Hope Princeton Way. Starting Mon Aug 31 until Sat Oct 31. From 6:00 AM to 6:00 PM PDT, Monday to Saturday. Watch for traffic control. Last update: September 29th, 2026 at 12:13pm PDT. Watch for crews and equipment working. Speeds reduced to 60km/h through work zones. Detours will be in effect for off and on-ramp closures when night work takes place. minor construction | last updated |
| Construction work at Highway 15, In Surrey and At Fraser Hwy. Starting Fri Sep 4 until Fri Oct 16. From 8:00 PM to 5:00 AM PDT the next day, every day. Lane closures in both directions. Watch for traffic control. Last update: September 4th, 2026 at 10:29am PDT. Eastbound right turn lane on Fraser Hwy also blocked. Speed reductions in place. minor construction | last updated |
| Shoulder maintenance from Gonzales Road, Lagoon Rd to Madeira Park Road, 105m East of Gonzales Road and Madeira Park Elementary School Access and Madeira Park Road. Starting Thu Sep 10 until Fri Sep 10. Watch for traffic control. Last update: September 9th, 2026 at 2:51pm PDT. minor construction | last updated |
| Road maintenance from Highway 13, In Langley - District and 28 Ave to In Langley - District and 30a Ave. Starting Thu Sep 10 until Sat Oct 31. From 8:00 PM to 5:00 AM PDT the next day, every day. Lane closures in both directions. Watch for traffic control. Last update: September 10th, 2026 at 11:23am PDT. minor construction | last updated |
| Bridge construction from Gilbert Road, In Richmond to Dinsmore Bridge, In Richmond. Starting Mon Sep 14 until Thu Dec 31. From 10:00 PM to 6:00 AM PDT the next day, Monday to Thursday and Sunday. Bridge closed. Detour in effect. Watch for traffic control. Last update: September 11th, 2026 at 8:56am PDT. Bridge will be open to traffic during the day. Detour via No. 2 Rd. Bridge. minor construction | last updated |
| Paving operations from Highway 1, In Abbotsford and Vedder Canal Bridge to In Abbotsford and Sumas Way. Starting Sun Sep 13 until Tue Oct 20. From 7:00 PM to 6:00 AM PDT the next day, weekdays and Sunday. Reduced to one lane. Last update: September 29th, 2026 at 12:11pm PDT. All on and off ramps will also be paved during this time. Motorists are advised to obey all posted speed limits, traffic signs, and traffic control personnel. major construction | last updated |
| Paving operations at Highway 9, In Kent and At Tuyttens Road. Starting Mon Oct 5 until Fri Oct 16. Watch for traffic control. Southbound lane closure. Last update: September 14th, 2026 at 1:54pm PDT. minor construction | last updated |
| Utility work from Highway 1, 449m Southeast of China Bar Tunnel to 273m Northeast of China Bar Tunnel. Starting Thu Sep 17 until Sun Jan 31. From 8:00 AM to 6:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: September 16th, 2026 at 4:56pm PDT. Vegetation removal. minor construction | last updated |
| Road construction from Bridgeport Road, In Richmond and Smith Street to In Richmond and No. 3 Road. Starting Mon Sep 21 until Wed Oct 21. From 7:00 AM to 7:00 PM PDT, weekdays. Centre lane closed. Right lane closed. Last update: September 18th, 2026 at 3:24pm PDT. minor construction | last updated |
| Utility work from Highway 99, Minaty Bay to At Copper Drive. Starting Fri Oct 2 until Fri Oct 23. From 6:30 PM to 6:30 AM PDT the next day, Monday to Thursday. Right lane blocked. Right turn lane closed. Expect minor delays. Last update: September 22nd, 2026 at 10:08am PDT. minor construction | last updated |
| Road maintenance from Lonsdale Avenue, In North Vancouver - City and Between E 25th St and Highway 1 East offramp to In North Vancouver - City. Starting Sun Oct 25 until Sun Oct 25. Centre lane closed. Watch for traffic control. Last update: September 22nd, 2026 at 4:10pm PDT. minor construction | last updated |
| Road maintenance from E 25th Street Offramp, In North Vancouver - City and Between Highway 1 and Lonsdale Ave to In North Vancouver - City. Starting Sun Oct 25 until Sun Oct 25. Left turn lane closed. Watch for traffic control. Last update: September 22nd, 2026 at 5:55pm PDT. minor construction | last updated |
| Utility work from Cheam Avenue, In Kent and At Cheam Avenue and Evergreen Drive to Highway 9, In Kent and SuperValu Agassiz. Starting Mon Sep 28 until Fri Oct 16. From 7:00 AM to 6:00 PM PDT, weekdays. Single lane alternating traffic. Last update: October 1st, 2026 at 2:50pm PDT. minor construction | last updated |
| Road construction at University Boulevard, At Shortcut Road and University Boulevard. Starting Mon Sep 28 until Fri Oct 30. From 7:30 AM to 5:30 PM PDT, weekdays. Shoulder closed. Last update: September 24th, 2026 at 10:24am PDT. Crosswalk installation. minor construction | last updated |
| Road maintenance from Highway 3, At Snass Creek Bridge to At Skagit River #1 Bridge. Starting Mon Oct 5 until Fri Nov 6. From 7:00 AM to 5:00 PM PDT, Monday to Saturday. Expect 20 minutes delay. Single lane alternating traffic. Last update: September 24th, 2026 at 2:19pm PDT. Rockworks mesh repair. minor construction | last updated |
| Tree pruning from Highway 7, In Hope and Haig Scale to At Chawathil Road. Starting Mon Sep 28 until Fri Oct 30. All day, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 24th, 2026 at 3:19pm PDT. minor construction | last updated |
| Wildfire from Silver Skagit Road, 6km Southwest of Hope to US Border. Closed. Last update: October 6th, 2026 at 12:32pm PDT. Next update: October 13th, 2026 at 12:00pm PDT. Closure point is approximately 6km south of Flood Hope Rd due to Provincial Parks closure caused by Hozomeen Mountain Wildfire. Silver Lake remains open. Ross Lake Campground and Skagit Valley Park closed. minor incident | last updated |
| Road construction from Highway 3, Sunshine Valley to Manning Park Resort. Starting Mon Sep 28 until Fri Oct 23. From 8:00 AM to 5:00 PM PDT, weekdays. Expect delays. Last update: September 25th, 2026 at 4:23pm PDT. minor construction | last updated |
| Construction work from 48 Avenue, In Langley - District and 272nd St to Watson Road, In Abbotsford and Lefeuvre Rd. Starting Thu Oct 1 until Mon Nov 30. From 9:00 PM to 5:30 AM PDT the next day, every day. Lane closures in both directions. Watch for traffic control. Last update: October 1st, 2026 at 9:06am PDT. minor construction | last updated |
| Construction work from Highway 13, In Langley - District and 48th Ave to In Langley - District and 58th Ave. Starting Thu Oct 1 until Mon Nov 30. From 9:00 PM to 5:30 AM PDT the next day, every day. Last update: October 1st, 2026 at 9:10am PDT. Intermittent traffic holds of up to two minutes. Watch for traffic control. minor construction | last updated |
| Paving operations from Highway 99, Keith Rd to Inglewood Ave. Starting Mon Oct 13 until Sat Oct 17. From 9:00 PM to 5:00 AM PDT the next day, Tuesday and Friday. Lane closures in both directions. Expect delays. Reduced to one lane. Last update: October 8th, 2026 at 5:49pm PDT. Taylor Way NB and SB lanes with side road and intersection closures. There will be counter flow to allow traffic through. minor construction | last updated |
| Paving operations from Highway 99, In Vancouver to In Vancouver. Starting Wed Oct 14 until Fri Oct 16. From 11:00 PM to 5:00 AM PDT the next day, Wednesday and Thursday. Single lane alternating traffic. Expect delays due to congestion. Last update: October 7th, 2026 at 6:54pm PDT. Paving works in both directions. NB Traffic will be single lane alternating. SB Traffic will be open to buses and Emergency vehicles only. major construction | last updated |
| Utility work from Highway 11, In Abbotsford and At Hazelwood Avenue to In Abbotsford and At Valley Road. Starting Thu Oct 15 until Fri Oct 16. Right lane closed. Last update: October 1st, 2026 at 3:13pm PDT. minor construction | last updated |
| Night work from Highway 99, In Delta and At Ladner Trunk Rd to In Delta and At Highway 17. Starting Sun Oct 4 until Sun Oct 18. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Watch for traffic control. Last update: October 2nd, 2026 at 10:43am PDT. One lane in each direction will remain open to traffic. major construction | last updated |
| Construction work from Highway 1, In Langley - District and 20m East of 216th Street to In Langley - District and 12m Northwest of 264th Street (Highway 13) Underpass. Starting Tue Oct 13 until Thu Oct 22. Last update: October 2nd, 2026 at 2:18pm PDT. Alternating eastbound and westbound lane shift. Watch for traffic control and signage. minor construction | last updated |
| Utility work from Highway 7, In Maple Ridge and Jim Robson Way to In Maple Ridge and 240th Street. Starting Mon Oct 19 until Mon Oct 19. From 8:00 AM to 5:00 PM PDT, Monday. Watch for traffic control. Last update: October 4th, 2026 at 8:05pm PDT. minor construction | last updated |
| Night work from Golden Ears Conn, In Surrey and 104 Ave to In Surrey and Golden Ears Way. Starting Fri Oct 9 until Thu Oct 15. From 10:00 PM to 4:00 AM PDT the next day, Monday to Wednesday and Friday to Sunday. Last update: October 5th, 2026 at 11:53am PDT. Possible lane closures in both directions. minor construction | last updated |
| Utility work from Horne Street, In Mission and Glasgow Ave to In Mission and Harbour Ave. Starting Fri Oct 16 until Sat Oct 17. Right lane closed. Watch for traffic control. Last update: October 5th, 2026 at 2:40pm PDT. minor construction | last updated |
| Utility work from Highway 99, In Delta to In Delta and Ladner Trunk Road off-ramp. Starting Tue Oct 6 until Fri Oct 23. All day, every day. Exit ramp closed. Last update: October 5th, 2026 at 3:40pm PDT. Exit 23 to Ladner Trunk Road closure. major construction | last updated |
| Construction work from Highway 99, In Whistler to In Whistler. Starting Tue Oct 6 until Fri Oct 30. Lane closures in both directions. Last update: October 5th, 2026 at 4:05pm PDT. One lane to remain open in both directions at all times. Watch for traffic control. minor construction | last updated |
| Construction work from Highway 1, Hell's Gate Tunnel. Starting Thu Oct 8 until Fri Oct 23. Single lane alternating traffic. Watch for traffic control. Last update: October 6th, 2026 at 11:40am PDT. minor construction | last updated |
| Bridge maintenance from Highway 5, At Highway 3 to At Othello Rd. Starting Wed Oct 14 until Tue Oct 20. All day, every day. Left lane closed in both directions. Watch for traffic control. Last update: October 7th, 2026 at 11:11am PDT. Nicolum Creek Bridge work. Left lanes will be closed in one direction at a time. minor construction | last updated |
| Construction work at Highway 1, In Langley - District and 232nd Street. Starting Sun Oct 18 until Mon Oct 19. Last update: October 7th, 2026 at 1:34pm PDT. Transitioning of current westbound off ramp. minor construction | last updated |
| Utility work from Highway 7, In Maple Ridge and At 203 Street to In Maple Ridge and At Dewdney Trunk Rd. Starting Mon Oct 26 until Mon Oct 26. From 9:00 AM to 3:00 PM PDT, Monday. Right lane closed. Expect delays. Watch for traffic control. Last update: October 7th, 2026 at 2:49pm PDT. major construction | last updated |
| Utility work from Pratt Road, 3km West of Gibsons and At Fircrest Rd to At Fraser Rd. Starting Mon Oct 26 until Fri Nov 6. From 8:00 AM to 4:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: October 7th, 2026 at 4:26pm PDT. minor construction | last updated |
| Electrical maintenance from Highway 101, In Sechelt and Shorncliffe Avenue to In Sechelt and Silverstone Lane. Starting Thu Oct 15 until Thu Oct 15. From 9:00 AM to 3:00 PM PDT, Thursday. Single lane alternating traffic. Watch for traffic control. Last update: October 7th, 2026 at 5:05pm PDT. minor construction | last updated |
| Paving operations from Highway 1A, In Surrey and At stal¿¿¿¿w¿¿as¿¿m Bridge to At King George Blvd. Starting Fri Oct 16 until Mon Oct 19. Northbound lane closure. Last update: October 8th, 2026 at 3:10pm PDT. Southbound exit to King George Blvd closed. Detour via Hwy 17 westbound off-ramp, to Tannery Rd, to 120 St, to King George Blvd. Work from 9pm on October 16th, to 5am on October 19th. major construction | last updated |
| Utility work from Highway 10, In Surrey and 184th Street to In Surrey and 188th Street. Starting Mon Oct 19 until Fri Oct 30. From 10:00 PM to 5:00 AM PDT the next day, weekdays. Right turn lane closed. Watch for traffic control. Last update: October 9th, 2026 at 11:02am PDT. minor construction | last updated |
| Utility work from Highway 99, In West Vancouver to Westcot Road, In West Vancouver and Westcot Road. Starting Wed Oct 14 until Wed Oct 14. Right lane blocked. Centre lane blocked. Last update: October 9th, 2026 at 12:04pm PDT. Watermain work on Westcot Road between Taylor Way and Westcot Place. minor construction | last updated |
| Utility work at Highway 99, In West Vancouver. Starting Wed Oct 14 until Thu Oct 15. Right lane blocked. Centre lane blocked. Last update: October 9th, 2026 at 12:11pm PDT. Night time watermain work along Westcot Road between Taylor Way and Westcot Place. minor construction | last updated |
| Utility work at Fraser Highway, In Langley - City and At Fraser Highway and Production Way. Starting Wed Oct 21 until Wed Oct 21. Expect delays. Last update: October 9th, 2026 at 1:14pm PDT. minor construction | last updated |
| Night work from Highway 11, In Abbotsford and Hazelwood Avenue to In Abbotsford and Valley Road. Starting Wed Oct 14 until Thu Oct 15. From 8:00 PM to 6:00 AM PDT the next day, Wednesday and Thursday. Left turn lane closed. Watch for traffic control. Last update: October 9th, 2026 at 1:39pm PDT. minor construction | last updated |
| Utility work from Flood Hope Road, In Hope to Highway 1, In Hope. Starting Mon Oct 19 until Fri Nov 6. From 8:00 AM to 4:00 PM PDT, every day. Right lane blocked. Last update: October 9th, 2026 at 1:41pm PDT. Telus pole work. minor construction | last updated |
| Road construction from Highway 1, In Abbotsford and Mt. Lehman Interchange to Highway 1A, In Abbotsford and Clearbrook Rd Interchange. Starting Tue Oct 13 until Thu Dec 31. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Lane closures in both directions. Watch for traffic control. Speed Limit restriction: 80km/hr. Last update: October 9th, 2026 at 3:24pm PDT. minor construction | last updated |
Check Highway 99 Road Conditions
BC Highway 1 Road Condition Reports
BC Highway 7 Lougheed Highway Road Conditions
The Lower Mainland is a geographic and cultural region of the mainland coast of British Columbia that generally comprises the regional districts of Metro Vancouver and Fraser Valley. The term has historically been in popular usage for over a century to describe a region that extends from Horseshoe Bay south to the Canada–United States border and east to Hope at the eastern end of the Fraser Valley. . The region is bounded to the north by the Coast Mountains and to the southeast by the Cascade Mountains, and is traversed from east to west by the Fraser River. BC Lower Mainland – Road Conditions Boating in the Lower Mainland. Remember to Get a Boat Operators Licence
Washington State Road Conditions