BC Lower Mainland – Road Conditions
Up to date road reports for the greater Vancouver and lower mainland
| Highway 99, southbound. Utility work between Exit 26 and Exit 20 for 4.7 km (Delta). Until Sat Nov 7 at 11:45 PM PST. minor construction | last updated Mon Feb 2 at 10:31 AM PST. |
| 56th Avenue, in both directions. Construction work between 256th Street and Gloucester Way in Langley - District. Until Sun May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Lane closures in both directions in effect. Watch for traffic control. minor construction | last updated Thu Mar 26 at 4:18 PM PDT. | next update Fri May 29 at 10:00 AM PDT. |
| 52nd Avenue, in both directions. Construction work between 264th St (Hwy 13) and 272 St in Langley - District. Until Sun May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Utility work. Watch for traffic control. Lane closures in both directions in effect. minor construction | last updated Thu Mar 26 at 4:13 PM PDT. | next update Fri May 29 at 10:00 AM PDT. |
| Highway 10, eastbound. Construction work between 196 St and 200 St (1 km east of Langley - District). Until Mon Nov 15, 2027 at 7:00 AM PST. Access to side lane closed. Eastbound lanes unaffected. Watch for crews. minor construction | last updated Mon Jan 26 at 10:11 AM PST. | next update Mon Nov 16 at 3:00 PM PST. |
| Highway 7B (Mary Hill Bypass), in both directions. Bridge construction between United Blvd and Shaughnessy St (Port Coquitlam). From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Expect delays due to congestion. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. major construction | last updated Tue Apr 28 at 11:25 AM PDT. | next update Mon Aug 31 at 5:00 PM PDT. |
| Highway 3 (Crowsnest Highway), in both directions. Road maintenance work between Second Avalanche Gate and Allison Pass Summit for 22.1 km (25 to 47 km east of Hope). Road open to traffic. Watch for traffic control. One lane open in each direction. Speed reduction to 30 km/h at KM 42 between Hope and Manning Park. major construction | last updated Fri Apr 24 at 12:20 PM PDT. | next update Wed Sep 1, 2027 at 12:00 PM PDT. |
| Silver Skagit Rd, in both directions. Washout at Flood Hope Rd. Road has been impacted by washout, repair plans underway. While passable, the road is not being maintained at this time and 4wd recommended, use caution. minor incident | last updated Thu Apr 16 at 10:10 AM PDT. | next update Mon Mar 1, 2027 at 10:00 AM PDT. |
| Highway 99, southbound. Maintenance between Exit 28 and 72 St for 3.1 km (Delta). Until Tue Jun 30. From 10:00 PM to 5:30 AM PST daily. Environmental borehole drilling and soil sampling. minor construction | last updated Thu Jan 15 at 4:23 PM PST. |
| Highway 1 (TransCanada Highway), eastbound. Road construction work between Exit 18: Lonsdale Ave and Exit 19: Lynn Valley Rd (North Vancouver - City). Until Fri Jul 31. From 7:00 AM to 5:00 PM PST daily. Right lane of eastbound on-ramp closed. minor construction | last updated Thu Jan 22 at 1:53 PM PST. |
| Highway 1 (TransCanada Highway), in both directions. Construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 15. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Speed limit 60 km/h. Single lane traffic in both directions.
More info: https://news.Gov.Bc.Ca/releases/2026TT0016-000090. major construction | last updated Fri Mar 6 at 12:07 PM PST. | next update Mon Jun 15 at 12:00 PM PST. |
| Beach Road, westbound. Utility work between Highway 99 and Semiahmoo First Nations. Until Fri May 1. From 7:00 AM to 5:00 PM PST daily. Single lane alternating traffic. minor construction | last updated Tue Feb 3 at 8:23 AM PST. |
| Highway 99, in both directions. Maintenance between Exit 28 and Exit 32: Steveston Hwy for 3.7 km (Delta to Richmond). Until Fri May 1 at 7:00 PM PST. Watch for traffic control. Tree clearing work. minor construction | last updated Fri Feb 20 at 3:21 PM PST. |
| Highway 101, in both directions. Construction work between Silverstone Lane and Ocean Ave for 1.1 km (Sechelt). Until Tue Jun 30. From 7:00 AM to 7:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Highway 101 and Shorncliffe Avenue intersection improvements. minor construction | last updated Mon Feb 23 at 9:52 AM PST. |
| Mt Lehman Overpass, in both directions. Bridge construction at Highway 1. Reduced to one lane in each direction. Expect delays northbound on Mt Lehman Rd and on the westbound Highway 1 on-ramp. For more info: https://www2.Gov.Bc.Ca/gov/content/transportation-projects/fraser-valley-highway1/264th-street-to-mt-lehman-road/mt-lehman-road-interchange. major construction | last updated Fri Mar 20 at 10:14 PM PDT. | next update Mon Dec 21 at 12:00 PM PDT. |
| Highway 1 (TransCanada Highway), in both directions. Road construction work between Anderson River Mainline and Thomas Rd for 9.1 km (29 to 20 km north of Yale). Until Wed Sep 30. Lane Closure. Watch for traffic control. minor construction | last updated Tue Mar 3 at 8:56 PM PST. |
| Highway 1A, in both directions. Construction work at stal'ew'asem Bridge. Until Sat May 2. From 7:00 AM to 2:00 PM PDT on weekends and from 9:00 AM to 3:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. minor construction | last updated Sun Apr 19 at 6:55 AM PDT. |
| Highway 91A, in both directions. Bridge maintenance at Queensborough Bridge (New Westminster). Until Sun Nov 15. From 9:30 PM to 9:00 AM PDT on weekends and from 9:30 PM to 5:00 AM PDT on weekdays. Night time construction work. Reduced to one lane each direction. No lane closures on June 11 to July 9th or on stat holidays. Watch for crews and expect a speed limit reduction. major construction | last updated Wed Apr 1 at 10:17 PM PDT. | next update Wed Nov 11 at 5:00 AM PDT. |
| Highway 7B (Mary Hill Bypass), westbound. Construction work between Coast Meridian Rd and Pitt River Rd for 1.5 km (Port Coquitlam). Until Fri Aug 28. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. Bus stop improvement project. minor construction | last updated Wed Mar 18 at 12:47 PM PDT. |
| Highway 10, in both directions. Road construction work at 196 St (Surrey). Until Fri Jul 3 at 7:00 AM PDT. Left turn lane closed. Centre lane blocked. Watch for traffic control. Entry and exit lane construction east and west of Highway 10. Additionally, there will be a left turn lane closure from Fraser Highway onto Highway 10. No work on Long Weekends or closures after 12 PM before or after a Statutory Holiday. minor construction | last updated Mon Mar 30 at 12:46 PM PDT. |
| Highway 1 (TransCanada Highway), westbound. Construction work between Bradner Rd and 248 St for 6.9 km (Abbotsford to Langley - District). Until Sun May 31. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Watch for traffic control. Lane closures. minor construction | last updated Thu Mar 26 at 4:50 PM PDT. |
| Highway 13, in both directions. Construction work between 48 Ave and 56 Ave for 1.6 km (Langley - District). Until Sun May 31 at 7:00 AM PDT. Lane shifts. Speed reduction to 40km/h. Work zone includes 264th St between 56th Ave and 58th Ave. minor construction | last updated Thu Mar 26 at 5:01 PM PDT. | next update Fri May 29 at 10:00 AM PDT. |
| Highway 101, in both directions. Tree pruning between Redrooffs Rd and Shorncliffe Ave for 6.3 km (Sechelt). Until Sat May 30 at 4:00 PM PDT. minor construction | last updated Tue Mar 31 at 9:47 AM PDT. |
| Highway 7 (Lougheed Highway), in both directions. Rock slope stabilization between 7 Day Adventist Youth Camp Rd and Ross Rd for 3.1 km (Hope). Until Sat Aug 8. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic with 20 minute delays. Work taking place Apr 6-14, May 4-10, May 25-June 26, July 24-Aug 8. Watch for traffic control. minor construction | last updated Tue Mar 31 at 1:57 PM PDT. |
| Highway 7 (Lougheed Highway), in both directions. Construction work between Beaudry Rd and Beach Camp Rd for 0.8 km (6 to 5 km west of Kent). Until Sun May 31. From 9:00 AM to 9:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control. minor construction | last updated Wed Apr 1 at 3:44 PM PDT. |
| Bridgeport Rd, in both directions. Construction work between Sea Island Way and Hwy 99 Off Ramp. Until Fri May 8. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. minor construction | last updated Thu Apr 2 at 3:38 PM PDT. |
| 232 St Off-Ramp, in both directions. Construction work at Highway 1 in Langley - District. From 8:30 PM to 10:30 AM PDT on Friday and Saturday and from 9:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday and Wednesday. Watch for traffic control. Traffic pattern change. Follow signage and new traffic signal at 72nd Ave. minor construction | last updated Sun Apr 26 at 12:02 PM PDT. | next update Mon Jun 15 at 12:00 PM PDT. |
| Highway 15 (Pacific Highway), in both directions. Construction work between 28B Ave and 40 Ave for 0.6 km (Surrey). Until Sun May 31. From 7:00 PM to 5:00 AM PDT daily. Right turn lane closed. Right lane closed. Lane closures will only be in one direction at a time. minor construction | last updated Wed Apr 8 at 2:42 PM PDT. |
| Highway 99, southbound. Construction work between Exit 32: Steveston Hwy and Exit 28 for 3.1 km (Delta to Richmond). Until Sat May 2 at 5:30 AM PDT. Right lane is blocked. minor construction | last updated Fri Apr 10 at 10:04 AM PDT. |
| Highway 11, northbound. Utility work between McClary Ave and Delair Rd (Abbotsford). Until Wed May 6. From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Left turn lane closed. Drilling, cable placing and splicing between Lonzo Rd. And 90 m south of Lonzo Rd. minor construction | last updated Mon Apr 13 at 5:50 PM PDT. |
| Highway 1 (TransCanada Highway), in both directions. Utility work between Exit 90: McCallum Rd and Exit 95: Whatcom Rd for 5.5 km (Abbotsford). Until Wed May 6. From 9:00 PM to 5:00 AM PDT on weekdays and Saturday. Centre lane closed. Right turn lane closed. Right lane closed. Drilling, cable placing and splicing. minor construction | last updated Mon Apr 13 at 5:54 PM PDT. |
| Howes St, in both directions. Construction work between Boyd St and Ewen Ave in New Westminster. Until Fri Nov 13. From 9:00 AM to 8:00 PM PDT on Saturday and from 7:00 AM to 8:00 PM PDT on weekdays. Traffic controls in place. Speed reduction to 30km/hr. minor construction | last updated Wed Apr 15 at 6:04 PM PDT. |
| Highway 99, in both directions. Utility work planned between Copper Dr and Darrell Bay Rd for 7.2 km (Squamish). Starting Mon May 4 until Sun Jun 7. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control personnel. Expect delays. minor construction | last updated Wed Apr 15 at 4:33 PM PDT. |
| Lillooet Ave, eastbound. Road maintenance work planned between Chehalis St and Eagle St in Harrison Hot Springs. Starting Mon May 11 until Fri May 15. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. minor construction | last updated Thu Apr 16 at 3:19 PM PDT. |
| Highway 91, northbound. Maintenance between River Rd and Exit 11 for 2.6 km (New Westminster to Delta). Until Mon Jun 1 at 6:00 PM PDT. Pedestrian and cyclist sidewalk access reduced. Check local signage. minor construction | last updated Mon Apr 20 at 5:29 PM PDT. |
| Highway 10, westbound. Utility work planned between 153 St and 152 St for 0.3 km (Surrey). Starting Mon May 11 until Tue May 12. From 10:00 PM to 4:30 AM PDT on Monday and Tuesday. The right turn lane and curb lane will be blocked. minor construction | last updated Fri Apr 17 at 4:20 PM PDT. |
| Highway 15 (Pacific Highway), in both directions. Utility work between 48 Ave and 68A Ave for 4.3 km (Surrey). Until Fri May 8. From 8:00 PM to 5:00 AM PDT on weekdays. Crews will be working on the shoulder. The centre, curb and bike lanes will be blocked. minor construction | last updated Mon Apr 20 at 9:00 AM PDT. |
| Highway 10, in both directions. Utility work between 160 St and 180 St for 4.0 km (Surrey). Until Fri May 8. From 8:00 PM to 5:00 AM PDT on weekdays. Crews will be working on the shoulder. The curb lane will be blocked. minor construction | last updated Mon Apr 20 at 9:02 AM PDT. |
| Highway 3 (Crowsnest Highway), in both directions. Construction work between Garret Rd and Sunday Summit for 14.0 km (46 to 32 km west of Princeton). Until Tue Jun 30. Lane Closure. Watch for traffic control. Work zone in effect 24/7. Work will be happening at Placer FSR near the Copper Creek Recreation Area. major construction | last updated Mon Apr 20 at 9:39 AM PDT. | next update Mon Jun 29 at 10:00 AM PDT. |
| Highway 13, in both directions. Road maintenance work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Fri May 1. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. minor construction | last updated Mon Apr 20 at 3:15 PM PDT. |
| NW Marine Drive, in both directions. Special event planned between Spanish Banks and 16th Avenue in Vancouver. Starting Sun May 3 at 8:30 AM PDT until Sun May 3 at 12:00 PM PDT. Road closure planned. BMO Vancouver Marathon. NW Marine Drive and 16th Avenue closed in UBC Endowment lands. Visit https://bmovanmarathon.Ca/detours for full road closure list. minor special event | last updated Mon Apr 20 at 9:27 PM PDT. |
| Highway 7 (Lougheed Highway), westbound. Mowing between Spilsbury St and 240 St for 4.5 km (Maple Ridge). Until Sat May 9 at 3:30 PM PDT. From 9:00 AM to 3:30 PM PDT on weekdays. Right lane closed. Watch for traffic control. Vegetation clearing work. minor construction | last updated Tue Apr 21 at 2:46 PM PDT. |
| Highway 101, in both directions. Utility work planned between Redrooffs Rd and Hill Rd for 1.2 km (Sechelt). Starting Wed May 6 at 7:00 AM PDT until Wed May 6 at 5:00 PM PDT. Watch for traffic control personnel. Crews will be working on the shoulder. minor construction | last updated Wed Apr 22 at 4:59 PM PDT. |
| Grandview Highway, westbound. Construction work between Boundary Road and Highway 1 in Vancouver. Until Fri May 1 at 3:00 PM PDT. Right lane is blocked. Welcome to Vancouver Sign construction. minor construction | last updated Wed Apr 22 at 9:29 PM PDT. |
| Lower Rd, in both directions. Special event planned between Geddes Rd and Conrad Rd. Starting Wed May 6 at 7:00 AM PDT until Wed May 6 at 9:00 PM PDT. Road closure planned. minor special event | last updated Thu Apr 23 at 10:29 AM PDT. |
| Bridgeport Rd, westbound. Utility work between Sexsmith Rd and Smith Rd in Richmond. Until Fri May 1. From 9:00 AM to 3:00 PM PDT daily. Right lane is blocked. minor construction | last updated Thu Apr 23 at 1:04 PM PDT. |
| River Road S, in both directions. Construction work between Highway 7 and 8793 River Road S. Until Wed May 6 at 3:30 PM PDT. Watch for traffic control. Road closed. Watch for dike excavation and material hauling. minor construction | last updated Thu Apr 23 at 3:01 PM PDT. |
| Highway 1 (TransCanada Highway), westbound. Construction work between Exit 92 and Riverside Rd (Abbotsford). Until Thu May 14 at 5:00 AM PDT. Westbound off-ramp closed April 24-29 and May 4-13 from 9pm to 5am. Speed reduction on Hwy 11 to 50km/hr. Allow for extra travel time and obey signage and traffic control personnel. major construction | last updated Thu Apr 23 at 4:30 PM PDT. | next update Thu May 14 at 5:00 AM PDT. |
| Highway 99. Special event planned between Bute St and Stanley Park Dr for 3.5 km (Vancouver). Starting Sat May 2 at 6:30 AM PDT until Sat May 2 at 1:00 PM PDT. Expect delays due to congestion. BMO Marathon. minor special event | last updated Fri Apr 24 at 2:40 PM PDT. |
| Else Rd, westbound. Utility work planned between Ashton Rd and Hwy 7/9 1 km north of Kent. Starting Mon May 11 until Fri May 22. From 7:00 AM to 5:00 PM PDT on weekdays. minor construction | last updated Mon Apr 27 at 10:56 AM PDT. |
| Boyd St, in both directions. Road maintenance work between Howes St and Wood St in New Westminster. Lane Closure. Watch for traffic control. minor construction | last updated Tue Apr 28 at 3:56 PM PDT. |
| Main Street , in both directions. Utility work planned between Mountain Highway and Phibbs Exchnage in North Vancouver - City. Starting Mon May 11 at 9:00 PM PDT until Fri May 12, 2028 at 5:00 AM PDT. Right lane will be blocked. Watch for traffic control personnel. minor construction | last updated Tue Apr 28 at 6:24 PM PDT. |
| Highway 7B (Mary Hill Bypass), eastbound. Construction work between Pitt River Rd and Coast Meridian Rd for 1.5 km (Port Coquitlam). Until Fri Aug 28. From 6:00 AM to 2:00 PM PDT daily. Right lane closed. Bus stop improvements. minor construction | last updated Wed Apr 29 at 9:43 AM PDT. |
| Highway 7B (Mary Hill Bypass), in both directions. Construction work between Pitt River Rd and Coast Meridian Rd for 1.5 km (Port Coquitlam). Until Fri Aug 28. From 8:00 PM to 5:00 AM PDT daily. Bus stop improvements. Electrical intersection blackout. minor construction | last updated Wed Apr 29 at 9:47 AM PDT. |
| Highway 7B (Mary Hill Bypass), in both directions. Construction work between Pitt River Rd and Coast Meridian Rd for 1.5 km (Port Coquitlam). Until Fri Aug 28. From 9:00 AM to 2:00 PM PDT daily. Centre lane closed. Left turn lane closed. Bus stop improvements. minor construction | last updated Wed Apr 29 at 9:51 AM PDT. |
| Highway 7 (Lougheed Highway), in both directions. Paving operations at Sylvester Rd (1 km east of Mission). Until Sat May 16. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. minor construction | last updated Wed Apr 29 at 10:52 AM PDT. |
| Sylvester Rd., in both directions. Paving operations between Highway 7 and Dale Rd. Until Sat May 16. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. minor construction | last updated Wed Apr 29 at 11:00 AM PDT. |
| Highway 7 (Lougheed Highway), eastbound. Road maintenance work planned between Old Dewdney Trunk Rd and Kennedy Rd for 68.8 km (Pitt Meadows to Kent). Starting Mon May 18 until Fri May 22. From 9:00 AM to 4:00 PM PDT on weekdays. Right turn lane will be closed. Spill response remediation. minor construction | last updated Wed Apr 29 at 11:43 AM PDT. |
| Highway 13, in both directions. Road construction work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Tue Jun 30. From 7:00 AM to 7:00 PM PDT and from 8:00 PM to 5:00 AM PDT daily. Highway improvement. minor construction | last updated Wed Apr 29 at 3:37 PM PDT. |
| Highway 99, in both directions. Special event planned between Denman St and Lions Gate Bridge for 3.0 km (Vancouver to West Vancouver). Starting Sun May 3 at 6:30 AM PDT until Sun May 3 at 10:30 AM PDT. Entrance ramp will be closed. Exit ramp will be closed. Vancouver Marathon will require closure of the access ramps to and from Stanley Park from the Stanley Park Causeway. Consider using Ironworkers Memorial Second Narrows Bridge. Last upda major special event | last updated | next update Sun May 3 at 10:30 AM PDT. |
| Highway 99, northbound. Paving operations planned between 24 Ave and 32 Ave for 0.3 km (Surrey). Starting Tue May 5 at 8:00 PM PDT until Wed May 6 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. minor construction | last updated Thu Apr 30 at 5:57 AM PDT. |
| Sylvester Rd. Paving operations planned between Farms Rd and Dale Rd. Starting Mon May 4 until Tue May 5. From 7:00 AM to 7:00 PM PDT on Monday and Tuesday. Road closure planned. Watch for traffic control personnel. Detour via Farms Rd to Dale Rd. minor construction | last updated Wed Apr 29 at 3:45 PM PDT. |
| Highway 99A (King George Blvd), in both directions. Paving operations planned between South Surrey Park And Ride and 44 Ave for 0.4 km (Surrey). Starting Mon May 4 at 9:00 PM PDT until Tue May 5 at 5:00 AM PDT. Left lane will be closed in both directions. Watch for traffic control personnel. Detour planned. minor construction | last updated Thu Apr 30 at 5:58 AM PDT. |
| Highway 91, southbound. Paving operations planned between Exit 1 and the end of Highway 91 for 0.9 km (Delta). Starting Sun May 3 at 9:00 PM PDT until Mon May 4 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Detour planned. minor construction | last updated Thu Apr 30 at 5:59 AM PDT. |
| Highway 7 (Lougheed Highway). Paving operations planned between Athey Rd and Brooks Rd for 1.9 km (13 km east of Mission to 12 km west of Kent). Starting Mon May 4 until Thu May 14. From 7:00 AM to 7:00 AM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. minor construction | last updated Wed Apr 29 at 3:53 PM PDT. |
| Shell Rd, northbound. Shoulder maintenance at Highway 99 On-Ramp in Richmond. Until Fri May 15. From 9:00 AM to 3:00 PM PDT daily. Watch for traffic control. Travel lane width to be maintained at 3 metres. minor construction | last updated Wed Apr 29 at 4:18 PM PDT. |
| Sea Island Way, eastbound. Maintenance between Corvette Way and No. 3 Rd in Richmond. Until Wed May 6. From 8:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Eastbound lane closure. Right turn lane closed. Watch for traffic control. Speed reductions in place. minor construction | last updated Wed Apr 29 at 4:51 PM PDT. |
| Highway 99, northbound. Utility work planned between Porteau Cove Rd and Watts Point Rd for 13.7 km (9 km north of Lions Bay to Squamish). Starting Mon May 4 until Mon Jun 8. From 7:30 AM to 5:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Right lane will be closed. Telus utility work. Service vault and pole access for aerial and underground placing and splicing. minor construction | last updated Thu Apr 30 at 9:28 AM PDT. |
| Highway 99, northbound. Utility work planned between Sea View Dr and Copper Dr for 1.4 km (2 to 3 km south of Squamish). Starting Mon May 4 until Mon Jun 8. From 6:30 PM to 6:30 AM PDT on Monday, Tuesday, Wednesday and Thursday. Right lane will be closed. Telus utility work. Intermittent traffic control. Traffic to be held for three minutes. minor construction | last updated Thu Apr 30 at 9:33 AM PDT. |
| Furry Creek Dr., in both directions. Utility work planned between Ocean Crest Dr. And Seaview Dr. Starting Mon May 4 until Mon Jun 8. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed. Telus utility work. This will occur at intersections of Sea View Dr. And Furry Creek Dr. And Copper Dr. And Creekside Rd. minor construction | last updated Thu Apr 30 at 9:44 AM PDT. |
| Highway 1 (TransCanada Highway), in both directions. Utility work planned between Anderson River Mainline and Thomas Rd (22 km north of Yale). Starting Tue May 5 until Wed May 6. From 7:00 AM to 5:00 PM PDT on Tuesday and Wednesday. Single lane alternating traffic will be in effect. Electrical maintenance at Alexandra Tunnel. minor construction | last updated Thu Apr 30 at 10:41 AM PDT. |
| Highway 99. Utility work planned between Panorama Ridge and Village Gate Blvd for 0.8 km (Whistler). Starting Mon May 4 until Fri Jun 5. From 6:00 AM to 7:00 PM PDT on weekdays. Work on shoulder. Watch for cyclists. minor construction | last updated Thu Apr 30 at 2:43 PM PDT. |
| Highway 99. Utility work planned between Nordic Dr and Village Gate Blvd for 1.9 km (Whistler). Starting Mon May 4 until Fri Jun 5. From 6:00 AM to 7:00 PM PDT on weekdays. Work on shoulder. Watch or cyclists. minor construction | last updated Thu Apr 30 at 3:30 PM PDT. |
| North Railway Ave, eastbound. Utility work planned between Horne St and Lougheed Hwy. Starting Wed May 6 until Thu May 7. From 7:30 AM to 5:00 PM PDT daily. Road closed. Local access will be maintained. Watch for traffic control. minor construction | last updated Thu Apr 30 at 3:45 PM PDT. |
| Highway 99, in both directions. Avalanche control work planned between Lil'wat Pl and Seton Lake Rd for 3.1 km (41 km south of Lillooet to 40 km north of Pemberton). Starting Sat May 2 at 2:00 PM PDT until Sat May 2 at 4:00 PM PDT. Expect delays. major incident | last updated Thu Apr 30 at 5:07 PM PDT. | next update Sat May 2 at 4:00 PM PDT. |
| Highway 1 (TransCanada Highway), in both directions. Construction work planned between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 1.4 km (North Vancouver - City to North Vancouver - District). Starting Wed May 6 until Wed Sep 30. From 7:00 AM to 9:00 PM PDT daily. Work on shoulder. Watch for crews. minor construction | last updated Thu Apr 30 at 5:44 PM PDT. |
| Highway 11, northbound. Maintenance planned between Abbotsford-Mission Bridge and London Ave Overpass (Mission). Starting Mon May 4 at 8:00 PM PDT until Tue May 5 at 5:00 AM PDT. Road will be closed for repairs. Mission Bridge NB Onramp. Full Onramp closure. Watch for crews working and any loose gravel on roadway during spray patching activities. Detour available via Harris Road. minor construction | last updated Thu Apr 30 at 6:23 PM PDT. |
| Highway 11, southbound. Maintenance planned between London Ave Overpass and Abbotsford-Mission Bridge (Mission). Starting Tue May 5 at 8:00 PM PDT until Wed May 6 at 5:00 AM PDT. Road will be closed for repairs. Mission Bridge SB Offramp. Full Offramp closure.
Watch for crews working and any loose gravel on roadway during spray patching activities.
Detour available via Harris Road. minor construction | last updated Thu Apr 30 at 6:28 PM PDT. |
| Highway 7 (Lougheed Highway), eastbound. Maintenance planned between Wardrop St and Grand St (Mission). Starting Wed May 6 at 8:00 PM PDT until Thu May 7 at 5:00 AM PDT. N. Railway Ave EB On Ramp Full On Ramp Closed, Detour to HWY 7 via Horne St Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:05 PM PDT. |
| Highway 11, northbound. Maintenance planned between Abbotsford-Mission Bridge and London Ave Overpass (Mission). Starting Thu May 7 at 8:00 PM PDT until Fri May 8 at 5:00 AM PDT. Fast Lane Closure, Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:09 PM PDT. |
| Highway 11, northbound. Maintenance planned at London Ave Overpass (Mission). Starting Fri May 8 at 8:00 PM PDT until Sat May 9 at 5:00 AM PDT. Fast Lane Closure, Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:15 PM PDT. |
| Highway 11. Maintenance planned at London Ave Overpass (Mission). Starting Mon May 11 at 8:00 PM PDT until Tue May 12 at 5:00 AM PDT. Slow Lane Closure, Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:22 PM PDT. |
| Highway 11, northbound. Maintenance planned at London Ave Overpass (Mission). Starting Tue May 12 at 8:00 PM PDT until Wed May 13 at 5:00 AM PDT. Slow Lane Closure, Watch for Crews Working and Any Loose Gravel on Roadway during Spray Patching Activities. minor construction | last updated Thu Apr 30 at 7:26 PM PDT. |
| Highway 91, westbound. Stalled vehicle at Exit 11: Westminster Hwy (Richmond). Right hand left turn lane is blocked on off-ramp. Crews are on scene. major incident | last updated Fri May 1 at 1:38 PM PDT. | next update Fri May 1 at 2:30 PM PDT. |
| Highway 99, southbound. Bridge maintenance planned at Lions Gate Bridge (West Vancouver). Starting Sun May 3 at 10:00 PM PDT until Thu May 7 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Right lane will be blocked. Bridge and sidewalk washing. minor construction | last updated Fri May 1 at 1:20 PM PDT. |
Check Highway 99 Road Conditions
BC Highway 1 Road Condition Reports
BC Highway 7 Lougheed Highway Road Conditions
The Lower Mainland is a geographic and cultural region of the mainland coast of British Columbia that generally comprises the regional districts of Metro Vancouver and Fraser Valley. The term has historically been in popular usage for over a century to describe a region that extends from Horseshoe Bay south to the Canada–United States border and east to Hope at the eastern end of the Fraser Valley. . The region is bounded to the north by the Coast Mountains and to the southeast by the Cascade Mountains, and is traversed from east to west by the Fraser River. BC Lower Mainland – Road Conditions Boating in the Lower Mainland. Remember to Get a Boat Operators Licence
Washington State Road Conditions