BC Lower Mainland – Road Conditions
Up to date road reports for the greater Vancouver and lower mainland
| Road maintenance from Highway 3, Second Avalanche Gate. Starting Wed Dec 10. Open to traffic. Watch for traffic control. Speed Limit restriction: 30 km/h in Manning Park 42km east of Hwy 5 junction. Last update: September 1st, 2026 at 11:02am PDT. One lane open in each direction. major construction | last updated |
| Washout at Silver Skagit Road, In Hope. Last update: September 15th, 2026 at 8:01pm PDT. Next update: March 1st, 2027 at 11:00am MST. Road has been impacted by washout, repairs are underway. Expect delays in both directions and drive with caution. minor incident | last updated |
| Bridge construction. Starting Mon Mar 9. Reduced to one lane in each direction. Expect delays northbound on Mt Lehman Rd and on the westbound Highway 1 on-ramp. More info: https://www2.gov.bc.ca/gov/content/transportation-projects/fraser-valley-highway1/264th-street-to-mt-lehman-road/mt-lehman-road-interchange. major construction | last updated |
| Construction work. Starting Sat Nov 15 until Mon Nov 15. Access to side lane closed. Eastbound lanes unaffected. Watch for crews. minor construction | last updated |
| Construction work at Howes Street, In New Westminster and Boyd Street. Starting Thu Apr 16 until Fri Nov 13. From 9:00 AM to 8:00 PM PDT, Saturday. From 7:00 AM to 8:00 PM PDT, weekdays. Last update: October 9th, 2026 at 10:56am PDT. Right turn lane closed and 30 km/h speed limit in effect 24/7. minor construction | last updated |
| Bridge maintenance. Starting Thu Mar 26 until Sun Nov 15. From 9:30 PM to 9:00 AM PST on Saturday and Sunday. From 9:30 PM to 5:00 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Reduced to one lane each direction. Watch for crews and expect a speed limit reduction. major construction | last updated |
| Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025. major construction | last updated |
| Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions. major construction | last updated |
| Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction. major construction | last updated |
| Mowing. Starting Mon Jun 29. From 7:00 AM to 3:00 PM PST on Monday, Tuesday, Wednesday, and Thursday. Watch for traffic control. Slow moving vehicle - shoulder mowing in progress. Watch for traffic control from Boston Bar northbound to Jackass Summit. minor construction | last updated |
| Road maintenance. Starting Mon Jul 13 until Tue Dec 22. Lane closures in both directions. Watch for traffic control. Expect alternating lane closures in both directions 24/7. Watch for traffic control. minor construction | last updated |
| Construction work from Highway 10, In Langley - District and 286m South of Exit to 72 Avenue & Highway 1 Eastbound to In Langley - District and 65m North of Exit to 72 Avenue & Highway 1 Eastbound. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:37am PDT. minor construction | last updated |
| Road construction from Highway 1, In Langley - District and 23m Southeast of 216 Street Underpass to In Langley - District and At 232 Street Underpass. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:41am PDT. Eastbound lane shift. Watch for crews and signage. minor construction | last updated |
| Shoulder maintenance from Gonzales Road, Lagoon Rd to Madeira Park Road, 105m East of Gonzales Road and Madeira Park Elementary School Access and Madeira Park Road. Starting Thu Sep 10 until Fri Sep 10. Watch for traffic control. Last update: September 9th, 2026 at 2:51pm PDT. minor construction | last updated |
| Bridge construction from Gilbert Road, In Richmond to Dinsmore Bridge, In Richmond. Starting Mon Sep 14 until Thu Dec 31. From 10:00 PM to 6:00 AM PDT the next day, Monday to Thursday and Sunday. Bridge closed. Detour in effect. Watch for traffic control. Last update: September 11th, 2026 at 8:56am PDT. Bridge will be open to traffic during the day. Detour via No. 2 Rd. Bridge. minor construction | last updated |
| Utility work from Highway 1, 449m Southeast of China Bar Tunnel to 273m Northeast of China Bar Tunnel. Starting Thu Sep 17 until Sun Jan 31. From 8:00 AM to 6:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: September 16th, 2026 at 4:56pm PDT. Vegetation removal. minor construction | last updated |
| Construction work from 48 Avenue, In Langley - District and 272nd St to Watson Road, In Abbotsford and Lefeuvre Rd. Starting Thu Oct 1 until Mon Nov 30. From 9:00 PM to 5:30 AM PDT the next day, every day. Lane closures in both directions. Watch for traffic control. Last update: October 1st, 2026 at 9:06am PDT. minor construction | last updated |
| Construction work from Highway 13, In Langley - District and 48th Ave to In Langley - District and 58th Ave. Starting Thu Oct 1 until Mon Nov 30. From 9:00 PM to 5:30 AM PDT the next day, every day. Last update: October 1st, 2026 at 9:10am PDT. Intermittent traffic holds of up to two minutes. Watch for traffic control. minor construction | last updated |
| Road construction from Highway 1, In Abbotsford and Mt. Lehman Interchange to Highway 1A, In Abbotsford and Clearbrook Rd Interchange. Starting Tue Oct 13 until Thu Dec 31. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Lane closures in both directions. Watch for traffic control. Speed Limit restriction: 80km/hr. Last update: October 9th, 2026 at 3:24pm PDT. minor construction | last updated |
| Road construction from Highway 99, In Delta and Dease Slough Bridge to In Delta and George Massey Tunnel. Starting Thu Oct 1 until Mon Nov 30. From 8:00 PM to 5:00 AM PDT the next day, weekdays. Right lane closed. Watch for traffic control. Last update: October 13th, 2026 at 10:48am PDT. minor construction | last updated |
| Road construction from Highway 99, In Delta and Exit 29 (River Road) to Highway 17A, In Delta. Starting Wed Oct 14 until Mon Nov 30. Exit ramp closed. Right turn lane closed. Last update: October 13th, 2026 at 7:20pm PDT. minor construction | last updated |
| Road construction from Highway 17A, In Delta and 12m Southwest of Ladner Underpass (Over Route 99) to In Delta and 150 metres south of the merge. Starting Thu Oct 1 until Mon Nov 30. Right lane closed. Last update: October 13th, 2026 at 7:28pm PDT. Emergency southbound stop lane also closed. minor construction | last updated |
| Road maintenance from Highway 99, At Nordic Drive and 500m West of Nordic Drive to In Whistler. Starting Tue Oct 13 until Thu Dec 31. From 6:00 AM to 7:00 PM PDT, every day. Single lane alternating traffic. Last update: October 15th, 2026 at 12:56pm PDT. Fuel management and reduction for community wildfire risk reduction. minor construction | last updated |
| Utility work from Highway 99, In-Shuck-CH Forest Service Road to In Pemberton and At Harrow Road. Starting Tue Oct 13 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, every day. Single lane alternating traffic. Last update: October 15th, 2026 at 12:55pm PDT. Tree trimming for BC Hydro. minor construction | last updated |
| Tree pruning from Highway 99, In Whistler, At Lorimer Road and Soo Valley Road. Starting Fri Oct 9 until Mon Nov 30. Single lane alternating traffic. Shoulder closed. Last update: October 15th, 2026 at 12:37pm PDT. Tree trimming for BC Hydro power lines. minor construction | last updated |
| Utility work from Highway 17, In Surrey and At Tannery Rd to In Surrey and At Elevator Rd. Starting 10:00 AM PCT on Tuesday November 17, 2026 until 1:00 PM PCT on Tuesday November 17, 2026. Right lane closed. Watch for traffic control. Last update: November 9th, 2026 at 2:48pm PCT. minor construction | last updated |
| Road maintenance from Mount Seymour Road, In North Vancouver - District and Mt Seymour Road to Mt Seymour Road. Starting 8:00 AM PCT on Monday November 2, 2026 until 6:00 PM PCT on Friday November 13, 2026. From 7:00 AM to 5:00 PM PCT, weekdays. Single lane alternating traffic. Expect delays. Last update: October 30th, 2026 at 2:54pm PDT. Expect delays as crews work to replace a culvert. minor construction | last updated |
| Construction work from Highway 99, In Richmond and Steveston Interchange to In Richmond and Rice Mill Rd Overpass. Starting 6:00 AM PDT on Monday October 19, 2026 until 3:00 PM PCT on Monday November 23, 2026. From 6:00 AM to 3:00 PM PDT, every day. HOV lane closed. Watch for traffic control. Last update: November 2nd, 2026 at 4:42pm PCT. Work until 5 PM on November 3rd. minor construction | last updated |
| Bridge maintenance from Highway 3, In Hope to First Avalanche Gate. Starting 8:00 PM PDT on Wednesday October 21, 2026 until 11:45 PM PCT on Friday November 13, 2026. Right lane closed. Centre lane closed. Expect delays. Last update: November 11th, 2026 at 7:28am PCT. Lanes closed between Exit 171 and before the Highway 3 and Highway 5 junction. Follow posted construction sign. minor construction | last updated |
| Paving operations from Highway 1, In Abbotsford and Sumas Way to In Chilliwack and Vedder Canal. Starting 7:00 PM PDT on Monday October 26, 2026 until 6:00 AM PCT on Sunday November 15, 2026. From 7:00 PM to 6:00 AM PDT the next day, weekdays and Sunday. Watch for traffic control. Last update: November 10th, 2026 at 11:11am PCT. Cole Road off and on ramp closed Nov 12th 7 PM-6 AM, and Nov 13th 9 PM-6 AM. minor construction | last updated |
| Utility work from Highway 1A, 264 Street to 270 Street. Starting 8:00 AM MST on Monday November 2, 2026 until 4:00 PM MST on Monday November 30, 2026. From 8:00 AM to 4:00 PM MST, weekdays. Right turn lane closed. Last update: October 26th, 2026 at 11:00am PDT. minor construction | last updated |
| Utility work from Highway 1A, In Langley - District and 270th Street to In Langley - District and 264th Street. Starting 8:00 AM MST on Monday November 2, 2026 until 4:00 PM MST on Monday November 30, 2026. From 8:00 AM to 4:00 PM MST, weekdays. Right turn lane closed. Watch for traffic control. Last update: October 26th, 2026 at 11:49am PDT. minor construction | last updated |
| Road construction from Highway 1, In Langley - District and 256th Street to In Abbotsford and Lefeuvre Road. Starting 12:00 AM PDT on Friday October 30, 2026 until 12:00 AM PCT on Thursday December 31, 2026. All day, every day. Closed. Detour in effect. Watch for traffic control. Expect delays. Last update: October 31st, 2026 at 2:02pm PDT. Eastbound traffic will be shifted to south of the median. major construction | last updated |
| Utility work from Highway 1A, In Langley - District and 264 Street to 264A Street. Starting 8:00 PM PCT on Saturday November 14, 2026 until 5:00 AM PCT on Sunday November 15, 2026. Expect minor delays. Last update: November 5th, 2026 at 12:34pm PCT. minor construction | last updated |
| Road construction from Highway 3, sunshine valley to first avalanche gate. Starting 7:00 AM PCT on Tuesday November 3, 2026. From 7:00 AM to 3:00 PM PCT, Tuesday. Right lane closed. Last update: November 3rd, 2026 at 8:57am PCT. minor construction | last updated |
| Utility work from Highway 1, 500m West of Cypress Bowl Road Overpass to 500m East of Cypress Bowl Road Overpass. Starting 10:00 PM PCT on Wednesday November 4, 2026 until 6:00 AM PCT on Saturday November 14, 2026. From 10:00 PM to 6:00 AM PCT the next day, weekdays. Reduced to one lane. Last update: November 3rd, 2026 at 5:19pm PCT. Except November 11th. minor construction | last updated |
| Utility work at Cypress Bowl Road, In West Vancouver and At Highway 1 underpass. Starting 12:00 AM PCT on Wednesday November 4, 2026 until 12:00 PM PCT on Monday May 31, 2027. All day, every day. Single lane alternating traffic. Last update: November 3rd, 2026 at 5:31pm PCT. minor construction | last updated |
| Construction work from Highway 13, In Langley - District and At 52 Avenue to 264 Street, 58 Avenue. Starting 7:00 AM PCT on Saturday November 14, 2026 until 7:00 AM PCT on Saturday December 19, 2026. All day, every day. Expect delays. Last update: November 4th, 2026 at 8:32am PCT. Northbound and southbound traveling public will be shifted east to continue various construction works on 264th Street. This will remain in place 24/7. minor construction | last updated |
| Road maintenance from Highway 99, In Surrey and 26th Avenue to In Surrey. Starting 10:00 PM PCT on Monday November 16, 2026 until 5:00 AM PCT on Wednesday November 18, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday to Wednesday. Right lane closed in both directions. Shoulder closed. Last update: November 4th, 2026 at 1:09pm PCT. Geotechnical drilling investigation. minor construction | last updated |
| Utility work from Highway 7, In Kent and 18m Southeast of Junction with Highway 9 to In Kent and Hot Springs Rd. Starting 9:00 AM PCT on Monday November 9, 2026 until 3:00 PM PCT on Tuesday November 17, 2026. From 9:00 AM to 3:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: November 5th, 2026 at 11:20am PCT. minor construction | last updated |
| Utility work from Highway 7, In Mission and 180m East of James Street to James Street, In Mission and At 1st Avenue and James Street. Starting 8:00 AM PCT on Thursday November 12, 2026 until 4:00 PM PCT on Friday November 13, 2026. From 8:00 AM to 4:00 PM PCT, Thursday and Friday. Right lane closed. Last update: November 5th, 2026 at 11:45am PCT. minor construction | last updated |
| Rock slope stabilization at Highway 7, In Kent and At Dyke Road. Starting 7:30 AM PCT on Monday November 9, 2026 until 5:30 PM PCT on Saturday December 12, 2026. From 7:30 AM to 5:30 PM PCT, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Expect delay of 20 minutes. Last update: November 6th, 2026 at 11:08am PCT. minor construction | last updated |
| Utility work at Poplar Road, At Ash Road and Poplar Road. Starting 7:00 AM PCT on Monday November 9, 2026 until 6:00 PM PCT on Friday November 13, 2026. From 8:00 AM to 6:00 PM PCT, weekdays. Watch for traffic control. Single lane alternating traffic. Last update: November 6th, 2026 at 1:25pm PCT. minor construction | last updated |
| Utility work at Highway 99, In Lions Bay and 154m South of Kelvin Grove Way Underpass. Starting 9:00 AM PCT on Tuesday November 24, 2026 until 3:00 PM PCT on Tuesday November 24, 2026. Last update: November 6th, 2026 at 2:42pm PCT. Work on right shoulder. Watch for traffic control. minor construction | last updated |
| Utility work at Rice Mill Road, In Richmond and At Highway 99 and Rice Mill Road. Starting 7:00 AM PCT on Tuesday November 10, 2026 until 5:00 PM PCT on Friday November 13, 2026. From 7:00 AM to 5:00 PM PCT, Tuesday, Thursday, and Friday. Single lane alternating traffic. Watch for traffic control. Last update: November 6th, 2026 at 2:56pm PCT. minor construction | last updated |
| Road maintenance from Highway 10, In Surrey and 148th St to 146th St. Starting 9:30 AM PCT on Tuesday November 10, 2026 until 3:00 PM PCT on Monday November 23, 2026. From 9:30 AM to 3:00 PM PCT, every day. Right lane closed. Watch for traffic control. Expect delays. Last update: November 6th, 2026 at 5:42pm PCT. minor construction | last updated |
| Utility work at Highway 99, 470m Northwest of Seymour Road. Starting 8:00 AM PCT on Monday November 23, 2026 until 4:00 PM PCT on Friday November 27, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: November 6th, 2026 at 5:54pm PCT. minor construction | last updated |
| Shoulder maintenance from Highway 99, exit to Furry Creek Dr to Britannia Beach FSR. Starting 7:30 AM PCT on Thursday November 12, 2026 until 5:30 PM PCT on Thursday November 12, 2026. Right lane blocked. Last update: November 9th, 2026 at 10:45am PCT. minor construction | last updated |
| Construction work from Highway 99, In Whistler and 200m North of Alpha Lake Rd to In Whistler and At Alpha Lake Road. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Monday November 16, 2026. Shoulder closed. Last update: November 9th, 2026 at 2:21pm PCT. Work taking place on Alpha Lake Rd. Watch for work vehicles entering and exiting the highway. minor construction | last updated |
| Tree pruning from Highway 99, In West Vancouver and Exit 2 to In West Vancouver and Pasco Road/Horseshoe Bay Drive. Starting 8:00 AM PCT on Tuesday November 17, 2026 until 4:00 PM PCT on Wednesday November 18, 2026. Road closure. Last update: November 10th, 2026 at 9:31pm PCT. Hazard tree removal 8AM-4PM on Tuesday and Wednesday. Detour via Horseshoe Bay Drive. major construction | last updated |
| Road construction from Highway 99, In Richmond and Steveston Interchange to In Richmond and Rice Mill Road overpass. Starting 8:00 PM PCT on Thursday November 12, 2026 until 5:00 AM PCT on Monday November 30, 2026. From 8:00 PM to 5:00 AM PCT the next day, every day. Right lane closed. Last update: November 11th, 2026 at 3:00pm PCT. Bus lane will also be closed. minor construction | last updated |
| Flooding from Squamish Valley Road, 3km mark to north of Pilchuk Creek Bridge. Closed. Last update: November 12th, 2026 at 3:19pm PCT. Next update: November 12th, 2026 at 6:00pm PCT. major incident | last updated |
| Flooding from Highway 99, At Rancheree Road to north of Stager Lane. Closed. Last update: November 12th, 2026 at 3:19pm PCT. Next update: November 12th, 2026 at 6:00pm PCT. major incident | last updated |
| Flooding from Pemberton Meadows Road, Erickson Rd to 2km south of Erickson Rd. Closed. Last update: November 12th, 2026 at 3:18pm PCT. Next update: November 12th, 2026 at 6:00pm PCT. major incident | last updated |
| Flooding from Highway 99, In Pemberton to In Pemberton. Single lane alternating traffic. Last update: November 12th, 2026 at 3:19pm PCT. Next update: November 12th, 2026 at 6:15pm PCT. minor incident | last updated |
| High flood warning and Debris on road from Pemberton Portage Road to NQuatqua Mainline,. Last update: November 12th, 2026 at 12:19pm PCT. Next update: November 12th, 2026 at 4:00pm PCT. Flooding and debris along Pemberton Portage Road. Please avoid the area if possible. minor road condition | last updated |
| Flooding from Highway 99. Road closure. Last update: November 12th, 2026 at 4:01pm PCT. Next update: November 12th, 2026 at 5:00pm PCT. major incident | last updated |
Check Highway 99 Road Conditions
BC Highway 1 Road Condition Reports
BC Highway 7 Lougheed Highway Road Conditions
The Lower Mainland is a geographic and cultural region of the mainland coast of British Columbia that generally comprises the regional districts of Metro Vancouver and Fraser Valley. The term has historically been in popular usage for over a century to describe a region that extends from Horseshoe Bay south to the Canada–United States border and east to Hope at the eastern end of the Fraser Valley. . The region is bounded to the north by the Coast Mountains and to the southeast by the Cascade Mountains, and is traversed from east to west by the Fraser River. BC Lower Mainland – Road Conditions Boating in the Lower Mainland. Remember to Get a Boat Operators Licence
Washington State Road Conditions