Up to date road reports for the greater Vancouver and lower mainland

Highway 1, in both directions. Utility work between Thomas Rd and Pfenniger Rd for 5.5 km (30 to 24 km south of Jackass Mountain Summit). Until Wed Mar 1. From 8:00 AM to 4:00 PM PST daily. Watch for traffic control. Single lane alternating traffic. Speed reduction to 50 km/hr.
minor construction | last updated Thu Jan 26 at 10:22 AM PST.
Hemlock Valley Rd. Compact snow between Enzian Way and End of Route (1 km north of Sasquatch Mountain Resort).
minor road condition | last updated Thu Feb 2 at 7:50 AM PST.
Highway 1, in both directions. Utility work between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 1.3 km (West Vancouver). Until Tue Feb 28. From 10:00 PM to 5:00 AM PST daily. Right lane closure eastbound. Left lane closure westbound. Watch for traffic control.
minor construction | last updated Thu Jan 5 at 3:52 PM PST.
Highway 7. Road construction work at 272 St (Maple Ridge). Until Fri Feb 17. From 5:30 AM to 5:30 PM PST on weekdays. Watch for traffic control.
minor construction | last updated Mon Feb 6 at 6:32 AM PST.
Old Hope Princeton Way, southbound. Electrical maintenance planned at 6th Avenue in Hope. Starting Tue Feb 7 until Fri Feb 10. From 8:00 AM to 3:30 PM PST on weekdays.
minor construction | last updated Mon Feb 6 at 4:45 PM PST.
Highway 1, westbound. Construction work at Exit 7: Westridge Ave (West Vancouver). Until Tue Feb 28 at 5:00 AM PST. From 10:00 PM to 5:00 AM PST daily. Ramp blocked. Westmount Road off ramp closure.
minor construction | last updated Thu Jan 5 at 4:05 PM PST.
Highway 1, westbound. Maintenance at Exit 8: Cypress Bowl Rd (West Vancouver). Until Tue Feb 28 at 7:00 AM PST. On-ramp from Cypress Bowl road will be blocked for construction and storm pipe installation.
minor construction | last updated Thu Jan 5 at 4:04 PM PST.
Cypress Bowl Road, in both directions. Utility work between Cypress Bowl Lane and Highway 1 on/off ramps in West Vancouver. Until Tue Feb 28 at 7:00 PM PST. From 7:00 AM to 7:00 PM PST daily. Single lane alternating traffic.
minor construction | last updated Thu Jan 5 at 4:06 PM PST.
Highway 1, eastbound. Road maintenance work between Exit 168: Flood Hope Rd and Exit 170 (Hope). Until Tue Feb 7. Lane Closure.
minor construction | last updated Mon Feb 6 at 8:08 PM PST.
Highway 1, westbound. Construction work between Exit 170 and Exit 168: Flood Hope Rd (Hope). Until Tue Feb 7 at 3:00 AM PST. Lane Closure.
minor construction | last updated Mon Feb 6 at 8:08 PM PST.
Highway 1, eastbound. Road maintenance work between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd (Hope). Until Tue Feb 7 at 2:00 AM PST. Lane Closure.
minor construction | last updated Mon Feb 6 at 8:09 PM PST.
Highway 1, westbound. Utility work between Exit 8: Cypress Bowl Rd and Exit 7: Westridge Ave for 1.6 km (West Vancouver). Until Tue Feb 28 at 5:00 AM PST. Expect delays. Watch for traffic control.
minor construction | last updated Thu Jan 5 at 3:50 PM PST.
Highway 1, eastbound. Road construction work between Exit 138: Bridal Falls Rd and Wahleach Access Rd (7 km east of Chilliwack). Until Tue Feb 7 at 5:30 AM PST. Lane Closure.
minor construction | last updated Mon Feb 6 at 8:09 PM PST.
Highway 3, westbound. Utility work planned between Sunshine Valley and First Avalanche Gate for 9.5 km (17 to 8 km east of Hope). Starting Mon Feb 13 at 8:00 AM PST until Fri Feb 24 at 4:00 PM PST. Single lane alternating traffic will be in effect.
minor construction | last updated Wed Jan 18 at 11:55 AM PST.
Highway 15, in both directions. Road maintenance work between 1 Ave and 40 Ave for 7.8 km (Surrey). Until Thu Mar 2. From 7:00 AM to 3:00 PM PST on weekdays. Shoulder closed. For screening and assessing culverts. Watch for workers and vehicles on the shoulder.
minor construction | last updated Mon Jan 30 at 12:59 PM PST.
Hemlock Valley Rd. Compact snow at End of Route (1 km north of Sasquatch Mountain Resort).
minor road condition | last updated Sun Feb 5 at 4:19 PM PST.
Highway 99, northbound. Maintenance planned between Exit 28 and Massey Tunnel (1 km north of Delta). Starting Mon Feb 6 at 10:00 PM PST until Tue Feb 7 at 4:00 AM PST. Right lane will be closed. Watch for traffic control personnel.
minor construction | last updated Mon Feb 6 at 4:00 PM PST.
Highway 1, in both directions. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Watch for traffic control. Expect delays. Loads over 3.8 metres in width restricted. Road open with sections of single lane alternating traffic. Watch for traffic control. Expect delays.
major construction | last updated Mon Feb 6 at 4:39 PM PST. | next update Tue Feb 7 at 4:30 PM PST.
Highway 7, westbound. Utility work planned between Wells Rd and Sutherland Rd for 1.1 km (Kent). Starting Thu Feb 9 until Fri Feb 10. From 9:00 AM to 4:00 PM PST daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Speed reduced to 60 km/hr.
minor construction | last updated Tue Jan 17 at 10:13 AM PST.
Highway 99, northbound. Road construction work between 32 Ave and Exit 10 (Surrey). Until Sun Apr 30. From 10:00 PM to 5:30 AM PST daily. Watch for traffic control. Hwy 99 on-ramp via 32nd Ave closed. Follow detour.
minor construction | last updated Tue Jan 17 at 12:03 AM PST.
Highway 1, westbound. Bridge maintenance at Exit 55: 192 St (Surrey). Until Wed Feb 15 at 4:30 AM PST. From 9:00 PM to 4:30 AM PST on weekdays and Sunday. Roadway reduced to one lane. Watch for traffic control. Expect delays. Work for repairs due to damage from overhead impact to 192 overpass, traffic will be routed into the HOV lane.
minor construction | last updated Fri Jan 6 at 10:20 AM PST.
Highway 99, southbound. Utility work planned between Exit 32: Steveston Hwy and Deas Thruway (Richmond). Starting Wed Feb 8 until Sat Feb 11. From 11:00 PM to 5:00 AM PST on Wednesday, Thursday, Friday and Saturday. Road will be closed intermittently. Expect minor delays. Exit ramp traffic stoppages.
minor construction | last updated Thu Feb 2 at 12:47 PM PST.
Highway 1, northbound. Utility work between Tuckkwiowhum Rd and Gibson Rd for 2.6 km (27 to 30 km south of Jackass Mountain Summit). Until Wed Mar 1 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on weekdays. Right lane closed. Pole access - placing poles, anchors, strand and fiber. No work on weekends.
minor construction | last updated Mon Jan 9 at 2:31 PM PST.
Highway 1, westbound. Construction work between Railway St and Main St (North Vancouver - District). Until Tue Feb 7 at 5:00 AM PST. Watch for traffic control. Drivers should expect stoppages of up to 5 minutes on Exit 23B.
minor construction | last updated Wed Feb 1 at 7:28 PM PST.
Murray St Overpass . Maintenance between Highway 7 and Horne St.. Until Tue Feb 7 at 6:00 AM PST. Lane Closure. Watch for crews.
minor construction | last updated Wed Feb 1 at 7:56 AM PST.
Highway 11, northbound. Bridge maintenance planned between Riverside St and London Ave Overpass for 1.5 km (Abbotsford to Mission). Starting Tue Feb 7 at 8:30 PM PST until Wed Feb 8 at 5:00 AM PST. Left lane will be closed. Expect delays. Speed limit 60 km/h.
minor construction | last updated Mon Feb 6 at 4:23 PM PST.
Highway 1, eastbound. Vehicle incident at Exit 55: 192 St (Surrey). The off ramp from Highway 1 to 192nd Street remains closed. Highway 1 itself is open in both directions with all lanes available. The 192nd St overpass has single lane alternating traffic in effect with a weight restriction of 24,000kg in place.
major incident | last updated Sun Feb 5 at 5:05 PM PST. | next update Mon Feb 13 at 5:00 PM PST.
Highway 1, northbound. Utility work planned between Tuckkwiowhum Rd and Gibson Rd for 2.6 km (27 to 30 km south of Jackass Mountain Summit). Starting Tue Feb 7 at 8:00 AM PST until Wed Feb 15 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on weekdays. Right lane will be closed. Pole access - placing poles, anchors, strand and fiber. No work on weekends.
minor construction | last updated Mon Jan 9 at 3:45 PM PST.
Highway 7, eastbound. Utility work planned between Mill Rd and Bodnar Rd for 3.1 km (Kent). Starting Thu Feb 16 until Fri Feb 24. From 9:00 AM to 4:00 PM PST daily. Watch for traffic control personnel. Right lane will be closed.
minor construction | last updated Tue Jan 17 at 1:58 PM PST.
Highway 99, in both directions. Utility work planned between Deas Thruway and Exit 32: Steveston Hwy (Richmond). Starting Tue Feb 7 at 11:00 PM PST until Wed Feb 8 at 4:30 AM PST. Road closure planned. Watch for traffic control personnel. Detour planned.
minor construction | last updated Thu Feb 2 at 12:14 PM PST.
Phibbs Exchange, in both directions. Construction work at the vicinity of Phibbs Exchange until Spring 2024. Sidewalk users should expect sidewalk closures and detours throughout the duration of the project.
minor construction | last updated Mon Jan 9 at 10:10 AM PST.
Highway 99, in both directions. Rock slope stabilization at Porteau Cove (10 km south of Squamish). Until Mon Feb 13 at 6:00 AM PST. Single lane alternating traffic.
minor construction | last updated Fri Jan 27 at 4:48 PM PST.
Highway 7. Maintenance planned between Grand St and Glasgow Ave for 0.7 km (Mission). Starting Tue Feb 21 at 8:00 AM PST until Thu Feb 23 at 5:00 PM PST. Installation of lights on street poles. Most work will take place in the parking stalls whenever possible.
minor construction | last updated Wed Feb 1 at 4:06 PM PST.
Highway 1, southbound. Utility work planned between Toll Rd and Regent St for 0.4 km (Yale). Starting Thu Feb 9 at 9:00 AM PST until Fri Feb 17 at 4:00 PM PST. Lane Closure.
minor construction | last updated Wed Jan 18 at 12:59 PM PST.
Highway 17, westbound. Road construction work at 80 St Conn (Delta). Until Sat Feb 11. From 7:00 AM to 5:00 PM PST on Saturday. Lane Closure.
minor construction | last updated Fri Feb 3 at 9:08 PM PST.
Main Street. Construction work planned between Brooksbank Ave and Highway 1 in North Vancouver - City. Starting Tue Feb 7 until Sat Feb 11. From 7:00 PM to 5:00 AM PST on Tuesday, Wednesday, Thursday, Friday and Saturday. Drivers should expect lane closures and traffic pattern changes in both directions.
minor construction | last updated Wed Feb 1 at 8:58 PM PST.
Highway 99, southbound. Bridge maintenance between Oak Street Bridge and Cambie Rd for 2.2 km (Richmond to Vancouver). Until Thu Feb 16 at 5:00 AM PST. From 9:00 PM to 5:00 AM PST on weekdays and Sunday. Roadway reduced to one lane. Watch for traffic control. 5 nights per week Sunday night to Friday morning repairing concrete overhead girder from overhead impact.
minor construction | last updated Sun Jan 22 at 6:59 AM PST.
Highway 1, in both directions. Construction work between 208 St and Exit 66: 232nd St for 4.2 km (Langley - District). Until Fri Mar 31 at 5:30 AM PST. From 8:30 PM to 5:30 AM PST on weekdays. Lane Closure. Expect delays.
minor construction | last updated Mon Jan 23 at 10:23 AM PST.
Highway 11, in both directions. Utility work planned between London Ave Overpass and Cedar Valley Conn for 0.6 km (Mission). Starting Tue Feb 7 at 9:00 PM PST until Wed Feb 8 at 6:00 AM PST. Sequential and individual closure of all lanes. Expect delays.
minor construction | last updated Fri Feb 3 at 12:15 PM PST.
Highway 3, westbound. Utility work planned between Second Avalanche Gate and Sunshine Valley for 0.1 km (17 to 18 km east of Hope). Starting Mon Feb 13 until Fri Feb 24. From 8:00 AM to 4:00 PM PST on weekdays. Right lane will be closed. Shoulder will be closed. Telus pole transfer/removal from Lakeside Drive to the Highway 3 Frontage Road in the Sunshine Valley area.
minor construction | last updated Wed Feb 1 at 1:44 PM PST.
Highway 7, westbound. Road construction work at 280 St (Maple Ridge). Until Fri Feb 10. From 9:00 AM to 3:00 PM PST on weekdays. Shoulder closed.
minor construction | last updated Mon Feb 6 at 6:59 AM PST.
Highway 99, in both directions. Bridge construction between 32 Ave and Exit 10 (Surrey). Until Wed Mar 1. From 5:00 AM to 5:00 AM PST daily. Watch for traffic control. Two lanes open during daytime, one lane open overnight. Work occurring 24h a day except for long weekends. Speed reduction to 50 km/hr.
minor construction | last updated Mon Jan 23 at 2:23 PM PST.
Highway 17, westbound. Construction work between Grace Rd and Highway 91 Connector (Delta). Until Tue Feb 7. From 1:00 AM to 4:00 AM PST on Monday and Tuesday. Road closed. Watch for traffic control. Follow signs for detour route. Full closure of the interchange ramp from Highway 91C westbound to Highway 17 westbound.
minor construction | last updated Tue Jan 31 at 4:33 PM PST.
Highway 10, eastbound. Utility work planned at 192 St (Surrey). Starting Mon Apr 3 until Fri May 12. From 7:00 AM to 5:00 PM PST on weekdays. Right lane will be closed.
minor construction | last updated Wed Feb 1 at 9:24 AM PST.
Highway 7, westbound. Utility work between Haig St and Hurd St for 0.5 km (Mission). Until Tue Feb 28. Watch for traffic control. Expect delays. Utility work occurring on Hurd st.
minor construction | last updated Wed Feb 1 at 12:42 PM PST.
Highway 99, southbound. Paving operations between Exit 28 and Exit 20 for 7.2 km (Delta). Until Fri Feb 10. From 10:00 PM to 7:00 AM PST on weekdays. Right lane closed. Please drive carefully through the project corridor, and be aware that the locations of signs and traffic devices may change frequently.
minor construction | last updated Fri Feb 3 at 12:37 PM PST.
Highway 1, eastbound. Tree pruning between Exit 8: Cypress Bowl Rd and Exit 10: 21st St for 1.9 km (West Vancouver). Until Fri Feb 24. From 8:30 AM to 4:00 PM PST on weekdays. Right lane closed. Shoulder closed. No closures noon the day before to noon the day following a Statutory Holiday.
minor construction | last updated Wed Feb 1 at 1:11 PM PST.

Check Highway 99 Road Conditions

BC Highway 1 Road Condition Reports

BC Highway 7 Lougheed Highway Road Conditions

The Lower Mainland is a geographic and cultural region of the mainland coast of British Columbia that generally comprises the regional districts of Metro Vancouver and Fraser Valley. The term has historically been in popular usage for over a century to describe a region that extends from Horseshoe Bay south to the Canada–United States border and east to Hope at the eastern end of the Fraser Valley. . The region is bounded to the north by the Coast Mountains and to the southeast by the Cascade Mountains, and is traversed from east to west by the Fraser River. BC Lower Mainland – Road Conditions Boating in the Lower Mainland. Remember to Get a Boat Operators Licence

Washington State Road Conditions

 

Filed Under: Area, Road Reports

Primary Sidebar

News

How to go to the USA.

The rules imposed by the United States Dec 2 2021 requiring a test 24hours before flying to the USA do not apply at the land border however You are still required to be fully vaccinated to drive to USA.

Driving to Canada

Canadian Covid -19 Emergency border measures have ended.

Best Personal Breathalyzer

Personal Breathalyzer
Dont risk a DUI. Make sure you don’t drive while impaired Get a personal breathalyzer check your alcohol levels and drive responsibly.




This 'travel news' services website is privately owned. It is not affiliated or sanctioned by the Government of BC, nor is it part of the provincial governments - DriveBC program or websites, operated by the BC Ministry of Transportation and Infrastructure. The data and electronic links provided in this web site are for informational purposes only and bchighway.com disclaims all responsibility for the accuracy of site content or linked information. This information obtained from bchighway.com should not be used as a basis for making financial or other commitments. Privacy Agreement © 1996–2023 bchighway.com - All Rights Reserved.