• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

British Columbia Highway News

Integrating BC Transportation Travel News Services and Products

  • BC Road Report News
  • Closures & Incidents
  • Mountain Pass Webcams
  • Canada / USA – Border Cameras
  • About us

Road Reports

Highway 5A Road Conditions

by

BC Highway 5A Road Conditions reports

Utility work from Highway 5A, At Old Nicola Trail to At Saddleman Rd. Starting Mon Nov 16 until Fri Nov 27. From 8:00 AM to 8:00 PM MST, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: October 15th, 2026 at 12:15pm PDT.
minor construction | last updated

Starting at the junction of the Crowsnest Highway (Highway 3) in Princeton, Highway 5A north to its junction with the Okanagan Connector (Highway 97C) at Aspen Grove.

Past Aspen Grove, Highway 5A and Highway 97C travel in a shared designation northwest for 23 km (14 mi) before intersecting the Coquihalla Highway 5 and Highway 8 at Merritt.

After a 4 km (2.5 mi) gap, Highway 5A continues north northeast for 89 km (55 mi), passing through the community of Quilchena, before terminating within Kamloops at its junction with Highways 5, 1 and Hwy 97 (which are overlapped at the point where 5A terminates). Highway 5A Road Conditions

Point of Interest: Check out Allison Lake Provincial Park

BC Highway 5A
BC Highway 5A

Want to see what the BC Highway 5A route looks like from a drivers perspective driving from Aspen Grove to Princeton?

Here is a video we found on YouTube. Soon BCHighway will make our own video. Until then you can see an example of one drivers experience July 2020. Watch here by clicking on the center of the screen.

• Allison Lake is shown at 43 min:11 sec

• MacKenzie Lake is shown at 50 min:56 sec

• Similkameen River is visible at 1 hour:06 min:20 sec

Filed Under: Road Reports

Highway 1 Road Conditions

by

BC Highway 1 Road Conditions today for the Trans Canada Highway Route 1

Links to View Weather Cameras

Hwy 1 – Fraser Valley Traffic and Weather Cameras

Highway 1 Hope to Kamloops Weather and Road Condition Cams

Hwy 1 Kamloops to Sicamous Weather Cams

Highway 1 Sicamous to Revelstoke Weather Cameras

Hwy 1 Revelstoke to Golden BC Weather Cameras

Highway 1 Golden though to Alberta Weather Cameras

Road Conditions Report

Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions.
major construction | last updated
Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction.
major construction | last updated
Mowing. Starting Mon Jun 29. From 7:00 AM to 3:00 PM PST on Monday, Tuesday, Wednesday, and Thursday. Watch for traffic control. Slow moving vehicle - shoulder mowing in progress. Watch for traffic control from Boston Bar northbound to Jackass Summit.
minor construction | last updated
Rest area closed at Highway 1, Redgrave Rest Area. Starting Tue Jul 14. Last update: September 15th, 2026 at 9:06pm MDT. Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses.
minor construction | last updated
Construction work from Highway 1, At Quartz Creek Bridge to Wiseman Road. Starting 9:00 AM MDT on Monday April 20, 2026 until 2:00 PM MDT on Sunday December 20, 2026. Expect delays. Watch for traffic control. Width restriction: 5 meters. Last update: November 10th, 2026 at 8:16am MDT. Expect single lane alternating traffic 24 hours a day Sept 15th to Nov 14th.
minor construction | last updated
Road construction from Highway 1, In Saanich and At Mckenzie Ave / Admirals Rd U/P to In View Royal and At West Burnside Rd U/P (Colwood Bridge). Starting Tue Jul 14. From 8:00 PM to 5:00 AM PDT the next day, weekdays. Watch for traffic control. Speed Limit restriction: 50 kmh. Last update: October 16th, 2026 at 2:29pm PDT. Bus on Shoulder project. No impact during day. Periodic night work with 5min stoppages.
major construction | last updated
Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting 9:00 AM PDT on Wednesday August 19, 2026. Watch for traffic control. Last update: November 12th, 2026 at 2:51pm PCT. Road Closed 9AM-3PM PT Mon-Fri. Alternate routes Highway 97A and 97B. Local access to Old Sicamous Rd/Old Spallumcheen Rd at top of hour during closure. No thru-traffic.
major construction | last updated
Road construction from Highway 1, In Langley - District and 23m Southeast of 216 Street Underpass to In Langley - District and At 232 Street Underpass. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:41am PDT. Eastbound lane shift. Watch for crews and signage.
minor construction | last updated
Utility work from Highway 1, 11km South of Cache Creek to 12km South of Cache Creek. Starting Mon Apr 27. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 15th, 2026 at 8:09pm PDT.
minor construction | last updated
Construction work at Highway 1, Gladwin Rd. and 8km East of Lytton. Starting 12:00 PM PST on Saturday November 15, 2025 until 11:45 PM PCT on Wednesday November 25, 2026. Expect 5 minutes delay. Watch for traffic control. Last update: November 3rd, 2026 at 9:23am PCT. Gladwin Culvert Replacement.
minor construction | last updated
Construction work from Highway 1, Nicomen River Rd to At Exit From Highway 1 Northbound to Highway 8. Starting Tue Aug 25 until Wed Jun 30. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Last update: August 25th, 2026 at 2:02pm PDT.
minor construction | last updated
Utility work from Highway 1, In Sicamous and At Old Sicamous Road to In Salmon Arm and 850m Northeast of Canoe Beach Drive NE. Starting Thu Sep 17 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Last update: September 15th, 2026 at 3:03pm PDT. BC Hydro pole replacement.
minor construction | last updated
Utility work from Highway 1, 449m Southeast of China Bar Tunnel to 273m Northeast of China Bar Tunnel. Starting Thu Sep 17 until Sun Jan 31. From 8:00 AM to 6:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: September 16th, 2026 at 4:56pm PDT. Vegetation removal.
minor construction | last updated
Bridge maintenance at Highway 1. Starting Mon Oct 5. From 9:00 AM to 3:00 PM PDT, Monday and Tuesday. Left lane closed. Right lane closed. Watch for traffic control. Last update: October 2nd, 2026 at 3:12pm PDT. Fast lane closed Monday October 5th Slow lane closed Tueday Octocber 6th.
minor construction | last updated
Blasting from Highway 1, In View Royal and Helmcken Rd to In Saanich and McKenzie Ave. Starting Tue Oct 6 until Mon Nov 30. From 8:00 PM to 6:00 AM PDT the next day, weekdays. From 8:00 PM to 8:00 AM PDT the next day, Saturday. Lane closures in both directions. Last update: October 15th, 2026 at 3:48pm PDT. Intermittent stoppages of up to 10 mins during blasts. Watch for traffic control.
minor construction | last updated
Bridge construction at Highway 1, Taft Overhead Bridge. Starting 12:00 AM PCT on Monday November 16, 2026 until 12:00 AM PCT on Thursday December 10, 2026. Single lane alternating traffic. Watch for traffic control. Last update: November 13th, 2026 at 5:02am PCT. Speed reduced to 50 km/h in construction zone. Single lane alternating traffic in effect 24/7. There's a 4.0m width restriction to facilitate work at Bent 5.
minor construction | last updated
Utility work from Highway 1, At Deloume Road to Shawnigan Mill Bay Road. Starting 8:00 PM PDT on Monday September 28, 2026 until 5:00 AM PCT on Monday November 23, 2026. From 8:00 PM to 5:00 AM PDT the next day, every day. Last update: November 10th, 2026 at 11:23am PCT. BC Hydro Pole replacements and stringing.
minor construction | last updated
Road construction from Highway 1, In Abbotsford and Mt. Lehman Interchange to Highway 1A, In Abbotsford and Clearbrook Rd Interchange. Starting Tue Oct 13 until Thu Dec 31. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Lane closures in both directions. Watch for traffic control. Speed Limit restriction: 80km/hr. Last update: October 9th, 2026 at 3:24pm PDT.
minor construction | last updated
Construction work at Highway 1, Glacier National Park and At Beaver Valley Picnic Site. Starting 7:00 AM PDT on Monday October 26, 2026 until 11:59 PM MST on Friday December 11, 2026. Expect delay of 20 minutes. Last update: October 22nd, 2026 at 2:46pm PDT. Speed reduced to 50km/h. Expect intermittent holds to traffic.
minor construction | last updated
Construction work from Highway 1, Strathcona Road to turning lane, 1st Ave. Starting 9:00 AM MST on Tuesday November 17, 2026 until 3:00 PM MST on Thursday November 19, 2026. Right turn lane closed. Expect minor delays. Watch for traffic control. Last update: October 22nd, 2026 at 3:23pm PDT. Right turn lane will be closed 24/7. Slow down and watch for work crews.
minor construction | last updated
Electrical maintenance from Highway 1, 14km East of Golden and 1km Northwest of Park Bridge (Kicking Horse River) to Ten Mile Hill Truck Stop Road,. Starting 8:00 AM MDT on Wednesday October 28, 2026. From 8:00 AM to 6:00 PM MDT, Wednesday. Last update: October 26th, 2026 at 10:30am MDT.
minor construction | last updated
Construction work from Highway 1, In Revelstoke and Highway 23 South to In Revelstoke and Victoria Rd. Starting 8:00 AM PDT on Monday October 26, 2026 until 4:00 PM MST on Monday November 30, 2026. Last update: October 26th, 2026 at 9:46pm PDT. Paving Oct 26 to Nov 8. Single lane alternating traffic. Expect 20 minute delays. Columbia Rest Area closed until Nov 30. Use alternate rest area.
minor construction | last updated
Utility work from Highway 1, Fry Rd Exit to Morden Rd. Starting 2:00 AM PCT on Wednesday November 18, 2026 until 4:00 AM PCT on Thursday November 19, 2026. Right lane closed. Expect minor delays. Watch for traffic control. Last update: November 4th, 2026 at 2:50pm PCT. Slow down and watch for work crews.
minor construction | last updated
Road construction from Highway 1, In Langley - District and 256th Street to In Abbotsford and Lefeuvre Road. Starting 12:00 AM PDT on Friday October 30, 2026 until 12:00 AM PCT on Thursday December 31, 2026. All day, every day. Closed. Detour in effect. Watch for traffic control. Expect delays. Last update: October 31st, 2026 at 2:02pm PDT. Eastbound traffic will be shifted to south of the median.
major construction | last updated
Slippery sections between Emerald Lake Road and BC/Alberta Border (Field). Last update: November 15th, 2026 at 11:55am MDT. Next update: November 15th, 2026 at 5:00pm MDT.
minor road condition | last updated
Slippery sections between Beaverfoot Road (near West Boundary of Yoho National Park) and Field and Visitor Centre Access Road (near Field). Last update: November 15th, 2026 at 11:55am MDT. Next update: November 15th, 2026 at 5:00pm MDT.
minor road condition | last updated
Limited visibility with fog between Highway 95 (near Golden) and West Boundary of Yoho National Park (near West Boundary of Yoho National Park). Last update: November 15th, 2026 at 7:44am MDT. Next update: November 15th, 2026 at 5:00pm MDT.
minor road condition | last updated
Road construction from Highway 1, Comazzetto Road to Vicars Road. Starting 6:30 PM PCT on Thursday November 19, 2026 until 2:00 AM PCT on Friday November 20, 2026. Centre lane closed in both directions. Watch for traffic control. Last update: November 12th, 2026 at 9:15am PCT.
minor construction | last updated
Slippery sections and Limited visibility with fog between Rogers Pass Summit (Rogers Pass Summit) and Glacier Park East Boundary (East Boundary of Glacier National Park). Last update: November 15th, 2026 at 6:44am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Slippery sections and Limited visibility with fog between Glacier Park East Boundary and Quartz Creek Bridge (Structure) (14 miles east of East Boundary of Glacier National Park). Last update: November 15th, 2026 at 6:44am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Limited visibility with fog between Quartz Creek Bridge (Structure) (14 miles east of East Boundary of Glacier National Park) and Donald Road (24 miles west of Golden). Last update: November 15th, 2026 at 7:44am MDT. Next update: November 15th, 2026 at 5:00pm MDT.
minor road condition | last updated
Limited visibility with fog between Donald Road (24 miles west of Golden) and Golden Donald Upper Road (near Golden). Last update: November 15th, 2026 at 7:44am MDT. Next update: November 15th, 2026 at 5:00pm MDT.
minor road condition | last updated
Slippery sections and Limited visibility with fog between Glacier National Park West Boundary (near West Boundary of Glacier National Park) and Glacier National Park Summit (Rogers Pass Summit). Last update: November 15th, 2026 at 6:44am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Utility work from Highway 1, Boston Bar Airstrip to C¿¿X¿¿ ¿¿ Cix¿¿ Bridge. Starting 8:00 AM PCT on Tuesday November 24, 2026 until 5:00 PM PCT on Tuesday November 24, 2026. From 8:00 AM to 5:00 PM PCT, Tuesday. Watch for traffic control. Last update: November 13th, 2026 at 9:37am PCT. Crews will be working along the shoulder installing hydro poles.
minor construction | last updated
Utility work from Highway 1, Chapmans Bar 10 to 1st Avenue. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Monday November 30, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Last update: November 13th, 2026 at 10:12am PCT.
minor construction | last updated
Bridge maintenance from Highway 1, In North Vancouver - District to In Vancouver. Starting 10:00 PM PCT on Monday November 16, 2026 until 5:00 AM PCT on Wednesday November 18, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday and Tuesday. Two right lanes blocked. Reduced to one lane. Expect delays. Last update: November 13th, 2026 at 10:47am PCT. EB Middle and slow lanes will be closed for Bridge Joint Rehabilitation.
minor construction | last updated
High winds between Mount Sicker Road and Radford Road (Chemainus). Last update: November 15th, 2026 at 4:49am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
High winds between Panorama Ridge Road (near Chemainus) and 1st Avenue (near Ladysmith). Last update: November 15th, 2026 at 4:49am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
High winds between Buller Street (near Ladysmith) and Departure Bay Ferry Terminal (Nanaimo). Last update: November 15th, 2026 at 4:49am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Vehicle incident from Highway 1, 393m Northwest of Illecillewaet Campground to 494m Southwest of Illecillewaet Campground. Westbound lane closure. Watch for traffic control. Assessment in progress. Last update: November 15th, 2026 at 2:52pm PCT. Next update: November 15th, 2026 at 4:00pm PCT.
major incident | last updated

Route Description

Highway 1 is the main route of the Trans-Canada Highway (TCH) through British Columbia, Canada. Its total accumulated distance through British Columbia is 1,039 km (646 mi), including the distance travelled on ferries. Road Conditions Hwy 1 Hope to Banff and Alberta

Road Condition Reports for the Coquihalla Hwy5 and Highway 97C

Alberta Road Conditions

Check BC Highway and Road Closures Today

Highway 1 Road Conditions
BC Highway 1

Filed Under: Cameras, Road Reports

Head Bay Road Conditions

by

Head Bay Road Conditions Tahsis to Gold River and BC Highway 28 

For Emergencies call Tahsis RCMP

Filed Under: Road Reports

Highway 14 Road Conditions

by

BC Vancouver Island Highway 14 Road Conditions West Coast (Sooke) Highway, road reports including Traffic and Weather Cams

Shoulder maintenance from Highway 14, In Sooke and At Church Road to In Sooke and 318m Northeast of Church Road. Starting Fri Aug 28 until Thu Dec 24. From 7:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Last update: October 9th, 2026 at 12:28pm PDT.
minor construction | last updated
Shoulder maintenance from Highway 14, In Sooke and Church Road to In Sooke and 318m Northeast of Church Road. Starting Fri Aug 28 until Thu Dec 24. From 7:00 PM to 5:00 AM PDT the next day, weekdays. Single lane alternating traffic. Last update: October 9th, 2026 at 12:43pm PDT.
minor construction | last updated
Utility work from Highway 14, In Colwood and At Jacklin Road to In Colwood and At Cecil Blogg Drive. Starting 7:00 AM PCT on Thursday November 12, 2026 until 5:00 PM PCT on Wednesday November 18, 2026. From 7:00 AM to 5:00 PM PCT, weekdays. Last update: November 9th, 2026 at 2:13pm PCT. Bus lane closed.
minor construction | last updated

Highway 14 Weather Cams

Veteran’s Memorial Parkway South – Hwy 14 (Veteran’s Memorial Parkway) at Goldstream Ave in Langford, looking to the south.

Veteran’s Memorial Parkway East – Hwy 14 (Veteran’s Memorial Parkway) at Goldstream Ave in Langford, looking to the east.

Veteran’s Memorial Parkway West – Hwy 14 (Veteran’s Memorial Parkway) at Goldstream Ave in Langford, looking to the west.

Veteran’s Memorial Parkway North – Hwy 14 (Veteran’s Memorial Parkway) at Goldstream Ave in Langford, looking to the north.

Hwy 14 at Kangaroo Rd – looking to the south

Hwy 14 at Kangaroo Rd – looking to the east

Hwy 14 at Kangaroo Rd – looking to the west

Suyer Road – Hwy 14, between Langford and Sooke near Suyer Rd, looking to the west.

Sooke East – Hwy 14 at Lazzar Rd near Sooke, looking to the east.

Sooke West – Hwy 14 at Lazzar Rd near Sooke, looking to the west.

Highway 14 at Trailhead Drive – Hwy 14 near Cormorant Way/Trailhead Dr, looking to the east.

For Road Conditions for all of Vancouver Island

Highway 14 begins Trans-Canada Highway 1 (Exit 14) in north Langford, travels south for 3 km (2 mi) as the Veterans Memorial Parkway through the community of Langford before turning west.

The highway continues west through Langford and Metchosin for 22 km (14 mi), passing by Mount Helmcken, before entering the city of Sooke.

After Sooke, Highway 14 proceeds west for 36 km (22 mi) to Jordan River, hugging the coastline for most of the distance. Highway 14 then travels west northwest along the southwestern coast of the Island for 42 km (26 mi), finally terminating at a Department of Fisheries and Oceans dock in the town of Port Renfrew BC. Highway 14 Road Conditions

Sooke Ham Radio Club

Filed Under: Road Reports

Highway 19 Road Conditions

by

Vancouver Island Highway 19 Road Conditions Reports

Road maintenance. Starting Mon Aug 10. From 8:30 PM to 11:00 PM PDT, Monday. Left lane closed in both directions. Watch for traffic control.
minor construction | last updated
Road construction from Highway 19, Intersection at Willis Rd & HWY 19 to In Campbell River and Intersection Willis Rd & HWY 19. Starting 7:00 AM PDT on Thursday October 29, 2026 until 8:00 PM MST on Friday November 27, 2026. From 7:00 AM to 8:00 PM PDT, weekdays. Right turn lane closed. Watch for traffic control. Shoulder closed. Last update: October 29th, 2026 at 11:23am PDT. Excluding Weekends and Stat Holiday - Nov 11.
minor construction | last updated
Utility work from Highway 19, Maughan Rd to Duke Point Ferry terminal. Starting 10:00 PM PCT on Wednesday November 18, 2026 until 2:00 AM PCT on Thursday November 19, 2026. Right lane closed. Expect minor delays. Watch for traffic control. Last update: November 4th, 2026 at 2:51pm PCT. Slow down and watch for work crews.
minor construction | last updated
Utility work from Highway 19, Lantzville Rd to McKercher Rd. Starting 2:00 AM PCT on Wednesday November 18, 2026 until 4:00 AM PCT on Thursday November 19, 2026. Right lane closed. Expect minor delays. Watch for traffic control. Last update: November 4th, 2026 at 2:49pm PCT. Slow down and watch for work crews.
minor construction | last updated
Water pooling between Hamm Road (12 miles south of Campbell River) and Cook Creek Road (28 miles south of Cumberland). Last update: November 15th, 2026 at 1:18pm PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Water pooling between Sayward Road (51 miles north of Campbell River) and Hamm Road (12 miles south of Campbell River). Last update: November 15th, 2026 at 1:18pm PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
High winds between Highway 1 (Nanaimo) and the end of Highway 19 (Duke Point BC Ferries Terminal). Last update: November 15th, 2026 at 4:49am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Water pooling between Church Road (Parksville) and Wilkinson Road (Nanaimo). Last update: November 15th, 2026 at 6:49am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated

For Up to Date road condition reports for all of Vancouver Island

Environment Canada Weather Forecasts

Filed Under: Road Reports

Vancouver Island Hwy Conditions

Vancouver Island Routes – All Vancouver Island Hwy Conditions (Hwy 1, 17, 4, 4a, 28, 14, 19, 19a, 18 etc)

You can also select a specific highway from the table below.

Highway 17Highway 19Highway 18
Highway 28Highway 19aHead Bay Road
Highway 4 Sutton PassHighway 14All Vancouver Island

General Route Information

Highway 4 

Highway 4’s eastern terminus is at an intersection with Highway 19A in Qualicum Beach, where the highway is known as Memorial Avenue.

The highway starts off travelling due south for 2 km (1¼ mi) to an interchange with Hwy 19. Another 2 km (1¼ mi) south of the interchange with Hwy 19, Highway 4 meets a junction with an older Alberni Highway segment, now known as Highway 4A, at the small community of Coombs. Highway 4 veers directly west upon meeting this junction.

West of Coombs

Highway 4 travels for 11 km (7 mi) before meeting Cameron Lake. After Highway 4 leaves Cameron Lake, it begins to wind its way through MacMillan Provincial Park, which includes the well-known area of Cathedral Grove. 20 km (12 mi) west of Cameron Lake, Highway 4 reaches a spur that travels into the city centre of Port Alberni.

Port Alberni

Highway 4 actually goes through land belonging to the city of Port Alberni starting 2 km (1¼ mi) west of the main spur into the city and lasting 5 km (3 mi), after which Highway 4 finally leaves Port Alberni via a bridge over the Somass River. 4 mi west of the Somass River crossing, Highway 4 reaches the shore of Sproat Lake, following the lake shore west for 24 km (15 mi). Highway 4 goes through Sutton Pass another 10 km (6 mi) later and turns toward the south-southwest. 

This very winding bearing of Highway 4, which features very steep grades, continues for 23 km (14 mi) before reaching the southeast shore of Kennedy Lake.

Highway 4 then follows the shore of Kennedy Lake southwest for 19 km (12 mi), then reaches a junction with a spur into the settlement of Ucluelet 5 km (3 mi) later. At the Ucluelet junction, Highway 4 then makes a ninety-degree turn towards the northwest. 1 km (0.6 mi) later, Highway 4 enters the Long Beach arm of Pacific Rim National Park. Highway 4 goes through the national park for 22 km (14 mi) northwest, finally terminating 11 km (7 mi) later at Tofino.

Highway 14

The total length of Highway 14 is 103 km (64 mi). In the east, Highway 14 begins at a junction with the Trans-Canada Highway in north Langford, proceeding south for 3 km (2 mi) as the Veteran’s Memorial Parkway through the community of Langford

The highway turns west and continuing through Langford and Metchosin for 22 km (14 mi), also passing by a local hill known as Mount Helmcken, before entering the city of Sooke.

After Sooke, Highway 14 proceeds west for 36 km (22 mi) to Jordan River, hugging the coastline for most of the distance. Highway 14 then travels west northwest along the southwestern coast of the Island for 42 km (26 mi), finally terminating at a Federal Government marine dock in the town of Port Renfrew.

Highway 17

In the south, Highway 17 begins at the intersection of Belleville and Oswego streets one block to the west of the provincial parliament/legislature buildings.

From Douglas and Blanshard, The highway travels north for 3 km (19 mi) through the city of Victoria before leaving the city at Tolmie Avenue; 2 km (1¼ mi) north of Tolmie Avenue, Highway 17 turns into a 6 km-long freeway (4 mi), with three interchanges.

After the third interchange at Royal Oak Drive, Highway 17 turns into a regular divided four-lane arterial, and goes for 14 km (9 mi) through mostly farmland, until it reaches the town of Sidney. After exiting Sidney 3 km (2 mi) later, the Pat Bay once again becomes a freeway, with two more interchanges along its length, toward its northern terminus at the Swartz Bay ferry terminal another 3 km north (2 mi).

BC Highway 18 

Highway 18 is a short, 42 km (26 mi) long main vehicle route on Vancouver Island, connecting the city of Duncan on the Trans-Canada Highway with the community of Youbou, on the north shore of Lake Cowichan.

Highway 19

Hwy 19’s northern end is at an intersection with Market Street in the small community of Port Hardy. The highway then proceeds in a southwest arc through the town centre, then goes southeast through a junction with the B.C. Ferry terminal at Bear Cove, and a junction with Port McNeill.

The highway then winds its way past Nimpkish Lake, then through a 163 km (101 mi) long stretch of dense forest terrain, through the community of Woss and a junction with Sayward, finally entering the city of Campbell River at a junction with Highways 28 and 19A, just past the river that the city is named for.

The entire stretch of Hwy 19 north of Campbell River is an undivided two-lane configuration. Once at the junction with Highways 28 and 19A.

Hwy 19 separates into an expressway configuration, built between 1996 and 2001. In Campbell River, the expressway shares its northbound lanes with Tamarac Street, and its southbound lanes with Willow Street. The entire stretch of Hwy 19 between Campbell River and the city of Parksville is a divided four-lane freeway or expressway (alternates), with a nominal speed limit of 110 km/h (68 mph), and is referred to as the “Inland Island Highway”.

South from Campbell River

Hwy 19 reaches its first interchange, with a four-lane arterial highway that goes west to the village of Cumberland and east to the communities of Courtenay and Comox.

Past the Courtenay Interchange, BC Hwy 19 is divided by a grass median. 16 km (10 mi) later, Hwy 19 reaches another interchange, this time with a two-lane road that goes a short distance east to the B.C. Ferry terminal at Buckley Bay.

There are two more at-grade intersections on Hwy 19 in the 41 km (25 mi) between the Buckley Bay Interchange and the interchange with Highway 4, which goes east into Qualicum Beach. 9 km (6 mi) later, Hwy 19 goes through another interchange, this time with Highway 4A, which goes east into Parksville. The next interchange, at Craig’s Crossing, is another 5 km south (3 mi).

Past the Craig’s Crossing Interchange

Highway 19  passes southeast through the communities of Nanoose Bay and Lantzville before finally entering the north part of Nanaimo. Hwy 19 then veers south onto a new 20 km (12 mi) long four-lane expressway known as the “Nanaimo Parkway”, which has five at-grade intersections along its length. Hwy 19’s Nanaimo Parkway portion ends at an interchange with the Trans Canada and Cedar Road.

At the interchange with Cedar Road, Hwy 19 proceeds to share an alignment with the Trans-Canada Highway south for 2 km (1¼ mi) before turning eastward at another interchange . Hwy 19 then crosses over the Nanaimo River 2 km (1¼ mi) later, passes through an interchange at Maughan Rd and then goes northward for 5 km (3 mi), finally terminating at the B.C. Ferry terminal at Duke Point.

Planning a trip over to the mainland? Perhaps your destination will require you to have the Road Condition Reports for the Coquihalla Hwy5 and Highway 97C

Highway 99 – Road Conditions

by

BC Highway 99 – Road Conditions including the Whistler to Lillooet Weather and Sea to Sky Highway Road Condition Cams

Travelling South on Highway 99 – Check out the – Highway 99 Peace Arch Border Cameras

Highway 99 Whistler Village Weather and Road Condition Cameras

Highway 99 Cams – Lions Bay to Whistler

For the Whistler to Lillooet Cameras see the right sidebar or for mobile uses these cameras will show at the bottom of the page.

Road construction from Highway 99, In Delta and Dease Slough Bridge to In Delta and George Massey Tunnel. Starting Thu Oct 1 until Mon Nov 30. From 8:00 PM to 5:00 AM PDT the next day, weekdays. Right lane closed. Watch for traffic control. Last update: October 13th, 2026 at 10:48am PDT.
minor construction | last updated
Road construction from Highway 99, In Delta and Exit 29 (River Road) to Highway 17A, In Delta. Starting Wed Oct 14 until Mon Nov 30. Exit ramp closed. Right turn lane closed. Last update: October 13th, 2026 at 7:20pm PDT.
minor construction | last updated
Road maintenance from Highway 99, At Nordic Drive and 500m West of Nordic Drive to In Whistler. Starting Tue Oct 13 until Thu Dec 31. From 6:00 AM to 7:00 PM PDT, every day. Single lane alternating traffic. Last update: October 15th, 2026 at 12:56pm PDT. Fuel management and reduction for community wildfire risk reduction.
minor construction | last updated
Utility work from Highway 99, In-Shuck-CH Forest Service Road to In Pemberton and At Harrow Road. Starting Tue Oct 13 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, every day. Single lane alternating traffic. Last update: October 15th, 2026 at 12:55pm PDT. Tree trimming for BC Hydro.
minor construction | last updated
Tree pruning from Highway 99, In Whistler, At Lorimer Road and Soo Valley Road. Starting Fri Oct 9 until Mon Nov 30. Single lane alternating traffic. Shoulder closed. Last update: October 15th, 2026 at 12:37pm PDT. Tree trimming for BC Hydro power lines.
minor construction | last updated
Construction work from Highway 99, In Richmond and Steveston Interchange to In Richmond and Rice Mill Rd Overpass. Starting 6:00 AM PDT on Monday October 19, 2026 until 3:00 PM PCT on Monday November 23, 2026. From 6:00 AM to 3:00 PM PDT, every day. HOV lane closed. Watch for traffic control. Last update: November 2nd, 2026 at 4:42pm PCT. Work until 5 PM on November 3rd.
minor construction | last updated
Road maintenance from Highway 99, In Surrey and 26th Avenue to In Surrey. Starting 10:00 PM PCT on Monday November 16, 2026 until 5:00 AM PCT on Wednesday November 18, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday to Wednesday. Right lane closed in both directions. Shoulder closed. Last update: November 4th, 2026 at 1:09pm PCT. Geotechnical drilling investigation.
minor construction | last updated
Utility work at Highway 99, In Lions Bay and 154m South of Kelvin Grove Way Underpass. Starting 9:00 AM PCT on Tuesday November 24, 2026 until 3:00 PM PCT on Tuesday November 24, 2026. Last update: November 6th, 2026 at 2:42pm PCT. Work on right shoulder. Watch for traffic control.
minor construction | last updated
Utility work at Highway 99, 470m Northwest of Seymour Road. Starting 8:00 AM PCT on Monday November 23, 2026 until 4:00 PM PCT on Friday November 27, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: November 6th, 2026 at 5:54pm PCT.
minor construction | last updated
Construction work from Highway 99, In Whistler and 200m North of Alpha Lake Rd to In Whistler and At Alpha Lake Road. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Monday November 16, 2026. Shoulder closed. Last update: November 9th, 2026 at 2:21pm PCT. Work taking place on Alpha Lake Rd. Watch for work vehicles entering and exiting the highway.
minor construction | last updated
Tree pruning from Highway 99, In West Vancouver and Exit 2 to In West Vancouver and Pasco Road/Horseshoe Bay Drive. Starting 8:00 AM PCT on Tuesday November 17, 2026 until 4:00 PM PCT on Wednesday November 18, 2026. From 8:00 AM to 4:00 PM PCT, Tuesday and Wednesday. Road closure. Detour in effect. Last update: November 13th, 2026 at 1:26pm PCT. Hazard tree removal. Detour via Horseshoe Bay Drive.
major construction | last updated
Road construction from Highway 99, In Richmond and Steveston Interchange to In Richmond and Rice Mill Road overpass. Starting 8:00 PM PCT on Thursday November 12, 2026 until 5:00 AM PCT on Monday November 30, 2026. From 8:00 PM to 5:00 AM PCT the next day, every day. Right lane closed. Last update: November 11th, 2026 at 3:00pm PCT. Bus lane will also be closed.
minor construction | last updated
Tree pruning from Highway 99, In West Vancouver to In West Vancouver. Starting 9:00 PM PCT on Monday November 16, 2026 until 5:00 AM PCT on Thursday November 19, 2026. From 9:00 PM to 5:00 AM PCT the next day, Monday to Wednesday. Right lane closed. Expect minor delays. Last update: November 13th, 2026 at 12:47pm PCT. Crews working N/B and S/B along Taylor Way for tree removal.
minor construction | last updated
Utility work at Highway 99, 15km Northeast of Lillooet. Starting 7:30 AM PCT on Monday November 16, 2026 until 5:30 PM PCT on Monday November 16, 2026. Single lane alternating traffic. Watch for traffic control. Last update: November 13th, 2026 at 4:04pm PCT.
minor construction | last updated
High flood warning from Highway 99, At Rancheree Street to At In-Shuck-Ch Forest Service Road. Last update: November 14th, 2026 at 7:24pm PCT. Next update: November 16th, 2026 at 12:00pm PCT. Road open to traffic. Use caution. Watch for signage and traffic control.
minor road condition | last updated
Landslide from Highway 99. Watch for traffic control. Single lane alternating traffic. Last update: November 15th, 2026 at 2:38pm PCT. Next update: November 16th, 2026 at 9:31am PCT. Westbound lane closed due to washout. Single lane alternating traffic, watch for traffic control personnel.
minor incident | last updated
Debris on road between Kwetsa Road (Pemberton) and Seton Lake Road (38 miles south of Lillooet). Last update: November 15th, 2026 at 2:46pm PCT. Next update: November 16th, 2026 at 9:00am PCT. Road is passable. Watch for shoulder erosions. Please drive with caution.
minor road condition | last updated

Road Conditions Lillooet-Pioneer Road 40

For those travelling south – US Customs and Border

Keep up to date on Todays Closures for BC Highways

Hwy 99 Sea to Sky Highway Road Conditions
Highway 99 Sea to Sky Highway

The “Sea to Sky Highway” is the title given to Highway 99 (Hwy99) from Horseshoe Bay to Pemberton. From Horseshoe Bay, the highway travels along the coast of Howe Sound.

From Horseshoe Bay it is 12 km (7.5 mi) to Lions Bay. North of Lions Bay the highway travels 21 km (13 mi), crossing into the Squamish-Lillooet Regional District to Britannia Beach.

Leaving Britannia Beach the highway goes north for 11 km (6.8 mi) to Squamish, at the head of Howe Sound.

58 km (36 mi) north of Squamish, the highway enters the popular Village of Whistler.

North of Whistler it’s on to Pemberton, where the Sea-to-Sky Highway ends and Duffey Lake Road begins. 

Here is an interesting Video we found Vancouver to Squamish by Freeway Brent

Filed Under: Cameras, Road Reports

Highway 16 Road Conditions

by

BC Highway 16 Road Conditions Report – The Yellowhead Hwy

Weather Cams:

Terrace through Rainbow Summit to Port Edward Road Condition Weather Cams

Kitwanga Weather Cameras

Trout Creek to New Hazelton Weather Cams – Hwy 16 Between Smithers and Kitwanga

Smithers Weather Cams

Burns Lake to Smithers Road Condition Weather Cams

Vanderhoof to Burns Lake Weather Cams

Prince George to Vanderhoof Weather Cams

Alberta to Prince George Road Condition Weather Cams

BC Highway 16 Road Conditions Report – The Yellowhead Hwy

Construction work from Highway 16. Starting Mon Sep 28 until Tue Dec 1. From 7:00 AM to 5:00 PM PDT, every day. Expect 10 minutes delay. Expect delays. Lane closures in both directions. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 50km. Last update: October 10th, 2026 at 2:29pm PDT. Use caution when passing crew and equipment on highway.
minor construction | last updated
Utility work at Highway 16, In Prince Rupert. Starting Mon Oct 5 until Mon Nov 30. From 7:00 AM to 7:00 PM PDT, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Last update: October 5th, 2026 at 4:31pm PDT.
minor construction | last updated
Utility work from Highway 16, In Prince Rupert and At 8th Avenue to In Prince Rupert and At 4th Avenue E. Starting Mon Oct 5 until Mon Nov 30. From 7:00 AM to 7:00 PM PDT, Monday to Saturday. Single lane alternating traffic. Last update: October 16th, 2026 at 2:27pm PDT.
minor construction | last updated
Utility work from Highway 16. Starting 7:00 AM PCT on Monday November 16, 2026 until 5:00 PM PCT on Saturday December 12, 2026. Westbound lane closure. Single lane alternating traffic. Watch for traffic control. Last update: November 13th, 2026 at 11:14am PCT. Watch for traffic control between Red Pass and Moose Lake Boat Launch.
minor construction | last updated
Roadside brushing from Highway 16, 4km East of Purden Ski Hill Road. Starting 8:00 AM PCT on Monday November 16, 2026 until 6:00 PM PCT on Friday November 20, 2026. From 7:30 AM to 6:00 PM PCT, weekdays. Watch for traffic control. Last update: November 12th, 2026 at 3:48pm PCT.
minor construction | last updated
Limited visibility with fog between Maintenance Boundary SA25 (24 miles west of Cedarvale) and Kitwanga (17 miles west of Gitsegukla). Last update: November 15th, 2026 at 6:33am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Limited visibility with fog between Cedarvale Ferry Road (17 miles west of Gitsegukla) and Fielding Street (near New Hazelton). Last update: November 15th, 2026 at 6:33am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Limited visibility with fog between New Hazelton Hi-Level Road (near New Hazelton) and Moricetown Overhead Bridge (Witset (Moricetown)). Last update: November 15th, 2026 at 6:33am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Geotechnical investigation from Highway 16, In Vanderhoof to In Vanderhoof. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Tuesday November 17, 2026. Eastbound lane closure. Single lane alternating traffic. Watch for traffic control. Last update: November 13th, 2026 at 11:02am PCT.
minor construction | last updated
Road construction from Highway 16. Starting 8:00 AM PCT on Wednesday November 18, 2026 until 6:00 PM PCT on Wednesday November 18, 2026. Expect 20 minutes delay. Single lane alternating traffic. Last update: November 13th, 2026 at 4:42pm PCT. TRS - Transverse Rumble Strip - Installation at Level Crossing - Mile 28.
minor construction | last updated
Utility work from Highway 16, In Prince George and Konrath Rd to In Prince George and Sykes Rd W. Starting 8:00 AM PCT on Friday November 13, 2026 until 4:00 PM PCT on Wednesday December 2, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Westbound lane closure. Watch for traffic control. Last update: November 13th, 2026 at 6:04pm PCT.
minor construction | last updated
Heavy rain and High winds between Old Beach Road (near Masset) and Adams Road (near Port Clements). Last update: November 15th, 2026 at 11:23am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Heavy rain and High winds between Nadu Road (near Port Clements) and Skidgate Ferry Terminal (Skidegate). Last update: November 15th, 2026 at 11:23am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Heavy rain and High winds between Prince Rupert Ferry Terminal and 3rd Avenue E (near Prince Rupert). Last update: November 15th, 2026 at 11:23am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Fog patches between Moricetown Overhead Bridge (Witset (Moricetown)) and Main Street - Smithers (Smithers). Last update: November 15th, 2026 at 6:34am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Fog patches between Main Street - Smithers (Smithers) and Wakefield Road (16 miles east of Telkwa). Last update: November 15th, 2026 at 6:34am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated

BC Ferries – Prince Rupert to Skidegate or Port Hardy

Granisle Highway 118 Road Conditions and Weather

Haida Gwaii Weather Cams

Alberta Highways Road Conditons

Filed Under: Road Reports

Highway 7 – Lougheed Highway

by

BC Highway 7 – Lougheed Highway Road Reports

Highway 7 – Lougheed Highway Road Conditions and Weather Cams

Mission to Hope Weather and Road Condition Cams

Utility work from Highway 7, In Kent and 18m Southeast of Junction with Highway 9 to In Kent and Hot Springs Rd. Starting 9:00 AM PCT on Monday November 9, 2026 until 3:00 PM PCT on Tuesday November 17, 2026. From 9:00 AM to 3:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: November 5th, 2026 at 11:20am PCT.
minor construction | last updated
Rock slope stabilization at Highway 7, In Kent and At Dyke Road. Starting 7:30 AM PCT on Monday November 9, 2026 until 5:30 PM PCT on Saturday December 12, 2026. From 7:30 AM to 5:30 PM PCT, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Expect delay of 20 minutes. Last update: November 6th, 2026 at 11:08am PCT.
minor construction | last updated
Road maintenance at Highway 7, In Maple Ridge and 67m East of 240 Street. Starting 5:00 AM PCT on Monday November 16, 2026 until 5:00 AM PCT on Friday November 27, 2026. Lane closures in both directions. Last update: November 13th, 2026 at 3:43pm PCT. Median crossover will be in place 24/7. Both directions will be down to one lane, WB traffic will be directed into an EB lane. Both WB lanes fully closed.
major construction | last updated

BC Highway 11 Road Conditions

Highway 9 Road Condition Reports

Chilliwack Ham Radio Club

Hemlock Valley Road Conditions

Filed Under: Road Reports

Coquihalla Conditions Hwy 5 & Hwy 97C

by

Coquihalla Conditions for Hwy 5 Coquihalla highway & Hwy 97C Okanagan connector for today.

Highway 5 – Road Conditions

Bridge construction at Highway 5, At Six Mile Bridge. Starting 11:00 AM PDT on Thursday September 24, 2026. Last update: October 30th, 2026 at 10:38am PDT. Speed reduction in effect, no other delays or restrictions in place. Please use caution.
minor construction | last updated
Utility work at Highway 5, At Highway 5 and Vinsula-Knouff Lake Road. Starting 8:00 AM MST on Tuesday November 17, 2026 until 4:00 PM MST on Tuesday November 17, 2026. Single lane alternating traffic. Watch for traffic control. Last update: October 23rd, 2026 at 3:35pm PDT.
minor construction | last updated
Construction work from Highway 5, At Mount Paul Way to Halston Ave. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Friday December 4, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Lane closures in both directions. Expect delays. Last update: November 6th, 2026 at 12:34pm PCT. Access to SB Hwy 5 from WB Chief Louis Way closed. NB access to EB Chief Louis Way closed. Overnight work Nov 24/25 from 7PM to 5AM.
major construction | last updated
Fog patches between McMurphy Pullout; SA Boundary (18 miles south of Avola) and Blue River Bridge (near Blue River). Last update: November 15th, 2026 at 4:20am PCT. Next update: November 16th, 2026 at 4:20am PCT.
minor road condition | last updated
Fog patches between Blue River Bridge (near Blue River) and Clemina Overhead Bridge (29 miles south of Valemount). Last update: November 15th, 2026 at 4:20am PCT. Next update: November 16th, 2026 at 4:20am PCT.
minor road condition | last updated



Highway 97C – Road Conditions

Utility work from Highway 97C, In Merritt to At Loon Lake Rd. Starting 8:00 AM MST on Tuesday November 10, 2026 until 4:00 PM MST on Tuesday November 17, 2026. From 8:00 AM to 4:00 PM MST, every day. Lane closures in both directions. Watch for traffic control. Last update: October 27th, 2026 at 4:58pm PDT.
minor construction | last updated
Limited visibility with fog between Trepanier Road and Pennask Summit (Pennask Summit). Last update: November 15th, 2026 at 9:54am PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated
Limited visibility with fog, Slushy with slippery sections and Snowing between Pennask Summit and Loon Lake Road (Pennask Summit). Last update: November 15th, 2026 at 2:30pm PCT. Next update: November 15th, 2026 at 4:00pm PCT.
minor road condition | last updated

Road Conditions for all of Highway 5

Road Conditions for all of Highway 97C

Hwy 97C – Weather Cams

Coquihalla Highway Summit Weather Cams

BC Mountain Summit Weather and Road Condition Cameras

General Route Information – Coquihalla Conditions

Coquihalla Summit (el. 1244 m.) is a highway summit along the Coquihalla Highway in British Columbia, Canada. It is the highest point on the highway between the cities of Hope and Merritt. It is located just south of the former toll booth plaza on the Coquihalla Highway, about 50 km north of Hope, and 65 km south of Merritt and is the divide between the Coquihalla River and the Coldwater River. Coquihalla conditions today

The ascent to the Coquihalla Summit is very steep, especially from the south. The ascent is particularly steep after passing northbound through the Great Bear snow shed.

Highway 5 begins in the south at its junction with Highway 3 at an uninhabited location known as “Othello,” 7 km (4 mi) east of Hope (named after a nearby siding on the Kettle Valley Railway, which used many Shakespearean names). The exit numbers on the Coquihalla are a continuation of those on Highway 1 west of Hope. 35 km (22 mi) north of Othello, after passing through five interchanges, Highway 5 reaches the Great Bear snow shed, which is a landmark on the route. 13 km (8 mi) north of the snow shed, after passing through another interchange and the 1244 m (4,147 ft) Coquihalla Pass, Highway 5 reaches the former toll booth; it was the only highway in British Columbia to have tolls. The toll for a typical passenger vehicle on the highway was C$10. 61 km (38 mi) and five interchanges later, the Coquihalla enters the city of Merritt at its south junction with Highway 5A and Highway 97C.

The Coquihalla conditions has three more interchanges and one mountain pass, the Clapperton Creek Summit, in its remaining 72 km (45 mi) between Merritt and its end at a junction with Highways 1 and 97 within the Afton area of Kamloops. Highway 5 continues east for 7 km (4 mi) concurrent with Highways 1 and 97 through Kamloops. This stretch of road, which carries 97 South and 5 North on the same lanes (and vice versa), is the only other wrong-way concurrency in British Columbia, along with 99 North and 12 South, near the town of Lillooet.



After separating from Highways 1 and 97, Highway 5 proceeds north for approximately 19 km (12 mi), temporarily leaving Kamloops city limits as a four-lane highway, before re-entering the city at the Rayleigh community and continuing north. It becomes a two-lane highway at Heffley Creek and the exit to Sun Peaks resorts, both of which indicate the final northern boundary of Kamloops.

Highway 5 follows the North Thompson River north from Heffley Creek for approximately 54 km (34 mi), along a parallel course with a branch of the Canadian National Railway, passing through Barriere, to a junction with Highway 24 at Little Fort. 30 km (19 mi) north of Little Fort, while continuing to follow the North Thompson and the CN Railway, Highway 5 reaches the community of Clearwater. It proceeds northeast for another 107 km (67 mi), passing Vavenby en route, to the community of Blue River, and then 109 km (68 mi) further north through the Columbia Mountains, passing by the community of Valemount to its northern terminus at Tête Jaune Cache, where it meets Highway 16. Check Coquihalla conditions

Highway 97C begins near Trepanier, at a location on Highway 97 known as Drought Hill. The section of Highway 97C east of Merritt is mostly freeway, with a speed limit of 110 km/h (68 mph) and between 4 and 6 lanes, and has very few exits along its route. Its highest altitude is the Pennask Summit (1728 m, 5760 ft, above sea level). Highway 97C travels on this freeway 82 km (51 mi) northwest to Aspen Grove, where it converges with Highway 5A.

Highways 97C and 5A share the 28 km (17 mi) long route between Aspen Grove and Lower Nicola, where Highway 5A diverges immediately east and Highway 8 begins.

North of the Highway 8 junction, Highway 97C goes north for 42 km (26 mi) to Logan Lake, then northwest for 57 km (35 mi) to Ashcroft on the Canadian National Railway. Highway 97C then travels 6 km (4 mi) west from Ashcroft to where it converges with Highway 1, which takes Highway 97C north for its final 5 km (3 mi) to its end at Highway 97 in Cache Creek. Information Obtained from Wikipedia and Drive BC

Road Conditions for all of Highway 5

Road Conditions for all of Highway 97C

Hwy 97C – Weather Cams

Coquihalla Highway Summit Weather Cams

BC Mountain Summit Weather and Road Condition Cameras

Filed Under: Road Reports

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 7
  • Go to page 8
  • Go to page 9
  • Go to page 10
  • Go to Next Page »

Primary Sidebar

Caribbean Business for Sale

Move to Sint Maarten with this incredible opportunity 

Best Personal Breathalyzer

Personal Breathalyzer
Dont risk a DUI. Make sure you don’t drive while impaired Get a personal breathalyzer check your alcohol levels and drive responsibly.




This 'travel news' services website is privately owned. It is not affiliated or sanctioned by the Government of BC, nor is it part of the provincial governments - DriveBC program or websites, operated by the BC Ministry of Transportation and Infrastructure. The data and electronic links provided in this web site are for informational purposes only and bchighway.com disclaims all responsibility for the accuracy of site content or linked information. This information obtained from bchighway.com should not be used as a basis for making financial or other commitments. Privacy Agreement © 1996–2026 bchighway.com - All Rights Reserved.