• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

British Columbia Highway News

Integrating BC Transportation Travel News Services and Products

  • BC Road Report News
  • Closures & Incidents
  • Mountain Pass Webcams
  • Canada / USA – Border Cameras
  • About us

Road Reports

Highway 37 Road Conditions

by

Highway 37 Road Conditions

Road Conditions for the Atlin Highway

Highway 37, in both directions. Maintenance between Bell 1 Bridge and Deltaic Cr Bridge (32 km north of Meziadin). Until Thu Sep 3. Maintenance at Bell I Rest Area. Speed reduced to 50km/h on highway. Watch for trucks leaving and entering the roadway. Expect minor delays.
minor construction | last updated Tue Aug 25 at 9:06 AM PDT.
Highway 37, in both directions. Maintenance between Meziadin Cres and Meziadin Lake Provincial Park (3 km south of Meziadin). Until Thu Sep 3. Maintenance at rest area. Speed reduced to 70km/h on highway. Watch for equipment and crews. Expect minor delays.
minor construction | last updated Wed Aug 26 at 11:59 AM PDT.
Highway 37, in both directions. Bridge maintenance between Elsworth Camp and Meziadin Cres for 0.5 km (14 km south of Meziadin). Until Thu Sep 3. From 7:00 AM to 4:30 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Watch for slow moving vehicles, watch for traffic control.
minor construction | last updated Tue Sep 1 at 7:33 AM PDT.
Highway 37. Utility work planned between 1.7km South of Westside Road and 0.4km North of Gruchy's Beach Turnoff. Starting Wed Sep 9 at 7:30 AM PDT until Wed Sep 30 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT daily. Expect delays. Single lane alternating traffic will be in effect. Watch for traffic control personnel.
minor construction | last updated Tue Sep 1 at 3:19 PM PDT.

BC Yukon Border – Highway 37 at BC-Yukon Border

Good Hope Lake – Hwy 37 near Good Hope Lake, looking to the north.

Dease Lake – Junction of Hwy 37 and Commercial Drive in Dease Lake, looking north on Hwy 37.

Meziadin Junction – Hwy 37 and Hwy 37A at Meziadin Junction, looking to the north.

Kitwancool Access Rd – Hwy 37N at Kitwancool Access Rd about 2.5 km south of Gitanyow and 21 km north of the Hwy 16 Yellowhead junction, looking to the north.

Kitwancool Access Rd – Hwy 37N at Kitwancool Access Rd about 2.5 km south of Gitanyow and 21 km north of Highway 16 Yellowhead junction, looking to the south.

Onion Lake – Hwy 37S at Onion Lake Cross Country ski trails, looking north.

Kitimat – Hwy 37 at Oolichan Avenue, 5 km north of Kitimat, looking to the north

Road Conditions for BC Highway 37A

Highway 37 starts its 874 km (543 mi) journey in the south at Kitimat. 59 km (37 mi) north, Highway 37 reaches Terrace, where it merges onto the Yellowhead Highway. The Yellowhead coincides with Highway 37 east for 91 km (57 mi) to Kitwanga Junction, where the Yellowhead diverges east.

North of the Yellowhead’s Kitwanga junction, Highway 37 travels 76 km (47 mi) to Cranberry Junction, and then another 80 km (50 mi) north to Meziadin Junction, where Highway 37A begins and heads west via Bear River Pass to Stewart and Hyder, Alaska. Highway 37 travels north through the Skeena Mountains for 333 km (207 mi) to the Continental Divide communities of Eddontenajon, Iskut and Dease Lake, which straddles the Stikine and Dease River basins. Another 116 km (72 mi) north and Highway 37 reaches Jade City, where a junction to the former asbestos-mining community of Cassiar is located. North of Jade City, Highway 37 travels another 120 km (75 mi) to its crossing of the 60th parallel into the Yukon Territory, becoming Yukon Highway 37 and terminating at a junction with the Alaska Highway near Upper Liard BC. Highway 37 Road Conditions

Filed Under: Road Reports

Vancouver Traffic

by

[wpgmza id=”1″]

Filed Under: Road Reports

BC Road Report News

British Columbia highway travellers road conditions linked to and collected from the BC Ministry of Transportation Infrastructure, Drive BC and the RCMP. Please drive safely and check for your travel route road conditions before you leave for your destination. BC Road Report News.

During the winter season and while travelling through mountain passes road and weather conditions can change at anytime. Remember to always drive within your ability.

Remember to bookmark our Highway Closures News! The Closure report is important and is updated throughout the day with route closures and major incidents. Road Reports and Closures on BC Secondary Routes

Transport drivers check seasonal government load restrictions.

BC Road Report News by Geographic Area

Lower Mainland Road Reports
– Highway 99 to Whistler
Rocky Mountain Road Reports
Vancouver Island Road Reports
– Malahat Conditions
– Sutton Pass
Cariboo Road Conditions
Thompson Okanogan Shuswap &
Nicola Area Conditions
Kootenay Area Road Reports
Coquihalla Conditions Hwy 5 & Hwy 97CNorthern Routes
BC Weather by AreaHaida Gwaii – Cams

Mountain Pass – Weather Cams

Hwy 1 – Jack Ass Mountain SummitHwy 3 – Bombi Summit
Hwy 1 – RevelstokeHwy 3 – Kootenay Pass
Hwy 1 – Jack McDonald SnowshedHwy 3b – Strawberry Pass
Hwy 1 – Rogers PassHwy 5 – Messiter Summit
Hwy 1 – Kicking Horse CanyonHwy 6 – Monashee Pass
Hwy 1 – Lake Louise WestHwy 16 – Rainbow Summit
Hwy 1 – Lake Louise EastHwy 16 – Red Pass
Hwy 3 – Allison PassHwy 20 – Heckman Summot
Hwy 3 – Sunday SummitHwy 24 – McDonald Summit
Hwy 3 – Anarchist – West of SummitHwy 97 – Begbie Summit
Hwy 3 – Eholt SummitHwy 97 – Pine Pass
Hwy 3 – Paulson SummitHwy 97c – Pennask Summit
Coquihalla Summit Weather CamsHwy 97c Weather Cams
Road Conditions – Mountain Pass Cameras

Road Reports out of Province

  • Washington Road information
  • Alberta Road Conditions
  • Montana Road Conditions
Popular Travelled RoutesPopular Island Routes
Highway 1 (Trans Canada)Highway 4
Highway 3 (Crowsnest)Highway 14
Highway 3a (Castlegar Creston)Highway 19
Highway 5 (Southern Yellowhead)Highway 19a
Highway 5AHighway 28
Highway 7 (Lougheed)
Highway 9 (Agassiz-Rosedale)
Highway 11 (Abbotsford-Mission)
Highway 13
Highway 17
Highway 97
Highway 97A
Highway 97B
Highway 97C Merritt – Kamloops
Highway 99
Highway 101 (Sunshine Coast)
Highway 23
Highway 31
Highway 95
Highway 22
Highway 22a
Highway 41
Highway 16
Highway 3b
Highway 20 (Chilcotin)
Road Reports by Highway Number

Alberta Road Condition Reports

Here are a couple of Webcamera Images obtained from the Alberta Motor Association (AMA) in cooperation with The Alberta Ministry of Transportation and Infrastructure. AMA is responsible in Alberta for reporting of the provincial road condition reports.

Lake Louise TCH

Camera Image

Hwy 16: East of the Jasper Park Gate

Camera Image

Road condition reports for Alberta can be obtained by AMA
http://www.ama.ab.ca/road_report/road_reports_main.htm or by calling the following telephone numbers:

  • Calgary: (403) 246 5853
  • Edmonton: (780) 471 6056
  • Grande Prairie: (780) 532 0148
  • Lethbridge: (403) 320 7623
  • Medicine Hat: (403) 527 3664
  • Red Deer: (403) 342 6611
  • Fort McMurray: (780) 799 4135
  • Rural Areas (800) 642 3810

The province of Alberta has a network of over 20,000 kilometers (12,427 mi) of paved highways, maintained by the Government of Alberta. Another 41,000 kilometers (25,476 mi) of paved public roads are maintained in cooperation by municipal authorities and provincial authorities. From the total of 180,000 kilometers (111,847 mi) of public roads, approximately 140,000 kilometers (86,992 mi) are unpaved, generally made up of gravel.

Primary Highways are numbered from 1 to 100, with the exception of the ring roads around Calgary and Edmonton, which are numbered 201 and 216, denoting their bypass linkages between highways 2 & 1 and 2 & 16 respectively.

Alberta Highways 1, 2, 3, 4, 9, 16, 28, 28A, 35, 43, 49, and 63 are considered Core Routes of Canada’s National Highway System. Highway 28 from Highway 63 to Cold Lake is considered a national highway system feed route and Highway 58 between Rainbow Lake and Highway 88 is considered a national highway system Northern Route.

Highways 1, 2, 3, 4, 16, and 43 are also considered Alberta’s most important interprovincial and international highways and are divided highways (expressways) or freeways for much or all of their length.

The Highway 15/28A/28/63 corridor between Edmonton and Fort McMurray is considered one of Alberta’s most important intraprovincial highways.

Highway 33 Road Conditions

by

BC Highway 33 Road Conditions Reports from Rock Creek to Kelowna BC. Highway 33 Weather Cams.

McCulloch – Highway 33, 41 km southeast of Kelowna, just south of Big White turnoff, looking to the north.

Kelowna – Hwy 97 at Hwy 33 in Kelowna, looking North on Hwy 97.

Highbridge – Highway 33, about 14 km north of Westbridge and 20 km south of Beaverdell, looking to the north.

Highway 33 starts in Rock Creek, about 40km east of Osoyoos, and is 129km long.

Check Highway 33 Weather Cams. From Rock Creek on the Crowsnest Hwy3, Highway 33 goes north. The first town it comes to is Beaverdell, then Carmi. A little bit north of Carmi, the highway passes by Big White Ski Resort (Big White is only accessible via Highway 33). Just north of Big White lies the city of Kelowna, and its ending at a junction with Highway 97.

Highway 33 Road Conditions

Filed Under: Road Reports

Highway 97A Road Conditions

by

Highway 97A Road Conditions – Vernon Sicamous Highway – Hwy 97A Weather Cam

Bridge maintenance at Highway 97A. Starting Mon Aug 17. From 8:00 AM to 3:00 PM PDT, Monday to Thursday. Single lane alternating traffic. Expect minor delays. Last update: August 13th, 2026 at 10:31am PDT. Bridge Deck Repair.
minor construction | last updated

Spallumcheen – Highway 97A at Larkin Cross Rd, about 14km north of Vernon, looking to the north.

Highway 97A is a 65 km (40 mi) spur route between Highway 97 near Vernon and Highway 1 in Sicamous. Other communities on Highway 97A include Spallumcheen, Armstrong, and Enderby.

Road Conditions for Hwy 97B from Grindrod to Salmon Arm

Thinking of Flying to Vernon? Check out the Vernon Airport

Filed Under: Cameras, Road Reports

Highway 20 Road Conditions

by

BC Highway 20 Road Conditions – from Williams Lake on Highway 97 through to Bella Coola connecting with BC Ferry routes to Port Hardy, Bella Bella, Ocean Falls, Shearwater, Klemtu, and Prince Rupert.

Highway 97 Road Conditions Report Williams Lake

BC Ferries Bella Coola Ferry Information

Highway 20 Route Information

Highway 20 is also known as the Chilcotin Highway, and also the Alexander MacKenzie Highway.

Hwy 20 is one of the two main East-West routes in the Central Interior of British Columbia, the other being Highway 16 (the Yellowhead Highway).

The Chilcotin Highway (Highway 20) runs 457 km (284 mi) from Williams Lake westward through the Chilcotin region to an inlet (North Bentinck Arm) from the Pacific Ocean where the town of Bella Coola is located.

BC Ferries Bella Coola Terminal in Bella Coola, provides transportation to Port Hardy on Vancouver Island, and to northern destinations such as Bella Bella, Ocean Falls, Shearwater, Klemtu, and Prince Rupert. Check Highway 20 Road Conditions.

BC Ferries has a complete route map. This map can be downloaded here – Download BCF Route Map

Driving into Bella Coola is a spectacular experience. Bella Coola has a unique location on the coast of British Columbia. You will pass through remote areas. It is important when driving in these conditions to be prepared. There aren’t a lot of facilities along the way, so start out with a full tank of gas.

You can easily make this trip in a day, especially in summer, but be sure to leave plenty of time to stop and explore.

The road is very challenging. It includes 11km of switchbacks on the way up to Heckman Pass (see weather cams to the right), nicknamed as The Hill, at 1.524m (5.000ft) above the sea level.

The road descends 43 km (27 mi) of steep, sharp hairpin turns and two major switchbacks to the Bella Coola Valley. The descent includes a 9 km (5.6 mi) section with steep grades.

Bella Coola Road Conditions

Filed Under: Road Reports

Highway 97 – Road Conditions

by

BC Highway 97 – Road Conditions Report

How to go to the USA for a day 

Road Condition Weather Cams

Highway 97 USA – Border Cameras

Highway 97 Osoyoos to Kelowna Weather Cams

Hwy 97 Kelowna to McLeese Lake Webcams

Highway 97 McLeese Lake to Prince George

Prince George Weather Cameras

Highway 97 Salmon Valley Rd (North of Prince George) to Chetwynd

Chetwynd Weather Cams

Hwy 97 Braden Rd (north of Chetwynd) to Ft St John

Fort Saint John Weather Cams

Mile 73 (north of Ft St John) to Steamboat Hill

Fort Nelson BC – Weather Cam

Highway Road Condition Reports

Highway 97 (Alaska Highway), in both directions. Road sweeping between 259 Rd and Julia Frtg for 18.3 km (Fort St John). From 12:00 AM to 12:00 AM MST on weekdays and Saturday. Continuous slow moving vehicle. Watch for crew and equipment working.
minor construction | last updated Tue Apr 21 at 9:42 AM MST.
Highway 97 (Alaska Highway), in both directions. Bridge construction between Pink Mountain Rd and Suicide Hill Pullout (67 km north of Wonowon). Until Sat Oct 31. Single lane alternating traffic. Beatton Bridge Construction, just north of Pink Mountain Road. Width restriction to 3.8 meters, Height restriction to 5.33 meters, Length restriction to 27.5m. GVW 81,500 kg.
minor construction | last updated Mon Jun 1 at 7:17 AM MST.
Highway 97 (Alaska Highway). Bridge construction between Sikanni Chief Rd and Prophet River Sub Rd (94 km south of Fort Nelson). Until Sat Oct 31. Single lane alternating traffic. Bridge construction at the Bougie Bridge south of Prophet River. Width restriction to 3.8 meters, Height restriction to 5.33 meters, Length restriction to 27.5m. GVW 81,500 kg.
minor construction | last updated Mon Jun 1 at 7:17 AM MST.
Highway 97 (Alaska Highway), in both directions. Construction work at Sweetwater Rd (18 km north of Dawson Creek). Until Fri Oct 16. Watch for traffic control. Speed reduction in effect: 50km/h, Monday to Friday from 7am-7pm. Speed reduced to 70km/h during inactive work hours.
minor construction | last updated Fri Jun 26 at 12:53 PM MST.
Construction work from Highway 97, Callan Rd to N Beach Rd. Starting Thu Aug 6. From 7:00 AM to 5:00 PM PDT, Monday to Saturday. Speed Limit restriction: 70 km/h. Last update: August 24th, 2026 at 3:55pm PDT. Expect intermittent stoppages. Speed reduced to 70km 24/7. Gravel trucks hauling Mon to Fri 7AM-5PM. Speed reduced to 50km/h during hauling operations. Watch for gravel trucks entering/exiting work zones and avoid following work vehicles into turning lanes.
minor construction | last updated
Paving operations. Starting Tue Aug 11 until Wed Sep 30. From 7:00 AM to 7:00 PM PDT, Monday to Saturday. Single lane alternating traffic. Pilot car controlled.
minor construction | last updated
Paving operations. Starting Mon Aug 17 until Wed Sep 30. From 7:00 AM to 7:00 PM MST, Monday to Saturday. Single lane alternating traffic.
minor construction | last updated
Highway 97, southbound. Utility work between Monterey Rd and Collins Rd for 0.9 km (Prince George). Until Sun Sep 13 at 5:00 PM PDT. Lane Closure. Shoulder closed.
minor construction | last updated Thu Aug 20 at 4:13 PM PDT.
Highway 97 (Alaska Highway), southbound. Special event planned between 93 St and 20 St for 70.1 km (Fort St John to Dawson Creek). Starting Fri Sep 11 at 8:00 AM MST until Fri Sep 11 at 8:00 PM MST. 2026 Cops for Cancer Tour De North Bicycle Tour. Watch for cyclists, slow moving vehicles, and first responders.
minor special event | last updated Fri Aug 21 at 3:04 PM MST.
Highway 97, southbound. Special event planned between Downtown Dawson Creek and 52nd St NW for 96.6 km (Chetwynd to Dawson Creek). Starting Sat Sep 12 at 8:00 AM MST until Sat Sep 12 at 8:00 PM MST. 2026 Cops for Cancer Tour De North Bicycle Tour. Watch for cyclists, slow moving vehicles, and first responders.
minor special event | last updated Fri Aug 21 at 2:28 PM MST.
Highway 97, southbound. Special event planned between Weiland Rd and Powder King Rd for 108.7 km (4 km south of Pine Pass Summit to Chetwynd). Starting Sun Sep 13 at 8:00 AM MST until Sun Sep 13 at 8:00 PM MST. 2026 Cops for Cancer Tour De North Bicycle Tour. Watch for cyclists, slow moving vehicles, and first responders.
minor special event | last updated Fri Aug 21 at 2:30 PM MST.
Highway 97, southbound. Special event planned between Powder King Rd and Kloss Rd for 39.0 km (16 km north of McLeod Lake to 4 km south of Pine Pass Summit). Starting Mon Sep 14 at 8:00 AM PDT until Mon Sep 14 at 8:00 PM PDT. 2026 Cops for Cancer Tour De North Bicycle Tour. Watch for cyclists, slow moving vehicles, and first responders.
minor special event | last updated Fri Aug 21 at 2:31 PM PDT.
Road construction at Highway 97, 566m North of Crooked River Rest Area N Access and 5km Southeast of Carp Lake Fsr. Starting Mon Aug 24. All day, every day. Expect 10 minutes delay. Single lane alternating traffic. Detour in effect. Last update: August 24th, 2026 at 11:05am PDT.
minor construction | last updated
Paving operations from Highway 97, In Clinton to 16km South of 100 Mile House. Starting Mon Jul 13 until Sat Sep 12. From 6:00 AM to 8:00 PM PDT, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Last update: August 25th, 2026 at 11:17am PDT. 15 min delays are possible.
minor construction | last updated
Utility work from Highway 97, Loon Lake Rd and 19km Southeast of Clinton to In Clinton. Starting Mon Aug 17 until Wed Sep 30. From 7:30 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: August 25th, 2026 at 11:30am PDT.
minor construction | last updated
Utility work from Highway 97, 19km Southeast of Clinton and Loon Lake Rd to 70 Mile House. Starting Mon Aug 17. Watch for traffic control. Last update: August 25th, 2026 at 11:44am PDT.
minor construction | last updated | next update Wed Sep 30 at 12:00 PM PDT.
Road maintenance from Highway 97, 34km North of Quesnel to 25km Northeast of Quesnel. Starting Thu Apr 30. Single lane alternating traffic. Expect delays. Last update: August 26th, 2026 at 9:21am PDT. Reduce speed, watch for crews at work.
minor construction | last updated
Construction work from Highway 97, 34km North of Quesnel to In Quesnel. Starting Mon Jul 20 until Fri Oct 16. Single lane alternating traffic. Watch for traffic control. Last update: August 26th, 2026 at 9:42am PDT. Widening, drainage improvements and construction of the northbound left turn lane at the Highway 97-Olson Road intersection in addition to culvert replacement .
minor construction | last updated
Bridge maintenance at Highway 97, In Quesnel. Starting Sat Aug 1 until Tue Sep 15. Open to traffic. Last update: August 26th, 2026 at 12:20pm PDT. No lane closure expected.
minor construction | last updated
Construction work at Highway 97, 34km North of Quesnel and Olsen Rd intersection. Starting Mon Aug 17 until Fri Oct 16. From 7:00 AM to 7:00 PM PDT, Monday to Saturday. Last update: August 26th, 2026 at 12:26pm PDT. Intersection improvements. Intermittent lane closures in both directions. Speed reduction in place. Watch for traffic control.
minor construction | last updated
Bridge maintenance at Highway 97. Starting Thu Aug 27. From 8:00 AM to 1:00 PM PDT, Thursday. Single lane alternating traffic. Expect minor delays. Last update: August 27th, 2026 at 8:26am PDT.
minor construction | last updated
Highway 97, southbound. Utility work planned between Weisbrod Rd and Birchwood Dr for 0.5 km (Prince George). Starting Wed Sep 9 at 9:00 AM PDT until Wed Sep 9 at 10:00 AM PDT. Lane Closure.
minor construction | last updated Mon Aug 31 at 8:58 AM PDT.
Highway 97, in both directions. Construction work between Industrial Way and Haight Rd for 0.8 km (25 to 26 km south of McLeod Lake). Until Fri Sep 4 at 6:00 PM PDT. Single lane alternating traffic.
minor construction | last updated Tue Sep 1 at 8:12 AM PDT.
Highway 97, in both directions. Utility work between Mitchell Rd and Crystal Lake Rd for 14.5 km (41 to 27 km north of Prince George). Until Tue Sep 15 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic.
minor construction | last updated Tue Sep 1 at 9:28 AM PDT.
Bridge maintenance at Highway 97, In NRRM and At Adsett Creek Bridge. Starting Wed Sep 2 until Thu Oct 15. Single lane alternating traffic. Watch for traffic control. Last update: September 1st, 2026 at 2:14pm MST.
minor construction | last updated
Mowing from Highway 97 to 13th Avenue,. Starting Wed Sep 2 until Fri Sep 11. From 5:30 AM to 4:30 PM PDT, every day. Expect minor delays. Last update: September 2nd, 2026 at 1:00pm PDT. Watch for crews and equipment.
minor construction | last updated
Fog patches between Powder King Road (24 miles south of Chetwynd) and Weiland Road (Chetwynd). Last update: September 3rd, 2026 at 6:24am MST. Next update: September 4th, 2026 at 6:53am MST.
minor road condition | last updated
Fog patches between 52nd Street NW and Watkins Road (33 miles north of Chetwynd). Last update: September 3rd, 2026 at 6:24am MST. Next update: September 4th, 2026 at 6:53am MST.
minor road condition | last updated
Highway 97. Ditching between Powder King Rd and Hasler Rd for 47.0 km (23 km south of Chetwynd to 33 km north of Pine Pass Summit). Until Fri Sep 4 at 4:00 PM MST. Single lane alternating traffic. Expect single-lane alternating traffic and possible delays. Please obey all traffic control personnel and signage, reduce your speed, and proceed with caution through the work zone.
minor construction | last updated Thu Sep 3 at 8:21 AM MST.
Highway 97. Shoulder maintenance planned between Powder King Rd and Old Hasler Rd for 11.3 km (44 km south of Chetwynd to 48 km north of Pine Pass Summit). Starting Tue Sep 8 until Fri Sep 25. From 6:30 AM to 6:00 PM MST daily. Single lane alternating traffic will be in effect.
minor construction | last updated Thu Sep 3 at 10:48 AM MST.
Highway 97 (Alaska Highway). Paving operations planned between 223 Rd and James Paul Rd (4 km north of Dawson Creek). Starting Tue Sep 15 at 6:30 AM MST until Tue Sep 15 at 6:00 PM MST. Single lane alternating traffic will be in effect.
minor construction | last updated Thu Sep 3 at 1:28 PM MST.
Highway 97. Construction work planned between Powder King Rd and Old Hasler Rd (28 km north of Pine Pass Summit). Starting Wed Sep 9 until Thu Sep 10. From 6:30 AM to 6:00 PM MST on Wednesday and Thursday. Single lane alternating traffic will be in effect.
minor construction | last updated Thu Sep 3 at 11:42 AM MST.
Highway 97. Bridge maintenance planned between Powder King Rd and Old Hasler Rd for 1.6 km (37 to 39 km south of Chetwynd). Starting Tue Sep 8 at 8:00 AM MST until Tue Sep 8 at 2:30 PM MST. Single lane alternating traffic will be in effect. Linseeding is underway ahead. Expect single-lane alternating traffic and delays. Please slow down, obey all traffic control personnel and signage, and use caution through the work zone.
minor construction | last updated Thu Sep 3 at 3:39 PM MST.
Highway 97. Bridge maintenance planned between McClarity Subdiv and Andrews Rd for 0.9 km (28 to 29 km north of Chetwynd). Starting Wed Sep 9 at 8:00 AM MST until Wed Sep 9 at 2:30 PM MST. Single lane alternating traffic will be in effect. Linseeding is underway ahead. Expect single-lane alternating traffic and delays. Please slow down, obey all traffic control personnel and signage, and use caution through the work zone.
minor construction | last updated Thu Sep 3 at 3:41 PM MST.
Highway 97. Bridge maintenance planned between Powder King Rd and Old Hasler Rd for 2.0 km (21 to 19 km north of Pine Pass Summit). Starting Thu Sep 10 at 8:00 AM MST until Thu Sep 10 at 2:30 PM MST. Single lane alternating traffic will be in effect. Linseeding is underway ahead. Expect single-lane alternating traffic and delays. Please slow down, obey all traffic control personnel and signage, and use caution through the work zone.
minor construction | last updated Thu Sep 3 at 3:45 PM MST.

For All Road Conditions in Okanagan Shuswap Thompson Nichola

Cecil Lake Road Report and Weather Cam

Highway 97A Road Conditions

US Highway 97 Travel Data

Thinking of Going Skiing? Try Apex Ski Resort in Penticton

Filed Under: Road Reports

BC Highway Closures

by

News – Up to Date: BC Highway closures and BC Road Closures Today

Bridge maintenance from Dollarton Highway Onramp, In North Vancouver - District and Dollarton Highway to Ironworkers Memorial Bridge. Starting Mon Aug 17 until Fri Sep 4. From 8:00 PM to 6:00 AM PDT the next day, Monday to Saturday. Closed for repairs. Detour in effect. Last update: September 3rd, 2026 at 4:02pm PDT. Take Dollarton Hwy to go westbound on Highway 1. Take Exit 22B for Mount Seymour Pkwy / Lillooet Rd. Turn left at Keith Rd. Follow detour signage.
major construction | last updated
Construction work at River Road, In Delta and Exit 29 - River Rd. Starting Tue Sep 8 until Thu Oct 1. From 10:00 PM to 1:00 PM PDT the next day, every day. Exit ramp closed. Last update: September 2nd, 2026 at 3:55pm PDT.
major construction | last updated
Construction work from Highway 1, In Langley - District and At Exit to 264 Street From Access Lane to In Langley - District and 380m Northwest of Exit 61 to 216 Street. Starting Sat Sep 12 until Sun Sep 27. From 8:30 PM to 10:30 AM PDT the next day, Saturday. Watch for traffic control. Last update: September 2nd, 2026 at 2:38pm PDT. Watch for full overnight directional closures. Detours will be available via crossovers.
major construction | last updated
Highway 1 (TransCanada Highway), in both directions. Utility work between Anderson River Mainline and Thomas Rd for 2.5 km (20 to 23 km north of Yale). Road open to traffic. Single lane alternating traffic. Watch for traffic control. Through a 2km section extending 1km south of Alexandra Tunnel to 1km north of Alexandra Tunnel. Obey signage and expect delays of up to 30 min.
major construction | last updated Wed Sep 2 at 1:49 PM PDT. | next update Mon Sep 7 at 11:00 AM PDT.
Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting Wed Aug 19. Watch for traffic control. Last update: September 2nd, 2026 at 8:48am PDT. Effective September 15 - Road Closed from 9AM-3PM PT on weekdays and Saturday. Use alternate route Highway 97A and 97B. Single lane alternating traffic nightly Mon-Sat 8PM-6AM.
major construction | last updated
Princeton Summerland Rd. There is a wildfire between Trout Creek Main and Summerland 45 km north of Princeton. Road closed. Watch for traffic control. Alternate Routes: Highway 5A and Highway 3.
major incident | last updated Tue Sep 1 at 3:11 PM PDT. | next update Fri Sep 4 at 10:00 AM PDT.
Utility work from Sunset Drive, At Mountain Park Drive and Sunset Drive to Monteith Road, At Monteith Road and Sunset Drive. Starting Thu Sep 3 until Fri Sep 25. Closed. Last update: September 1st, 2026 at 2:52pm PDT. Detour via Broadwell Rd - Channel Ridge Dr.
major construction | last updated
Bridge construction at Kicking Horse Drive. Starting Tue Sep 8. All day, every day. Closed for repairs. Last update: September 1st, 2026 at 1:55pm MDT. Dogtooth bridge closed every night at 19:00hr until 23:00hr for 15 mins at the start of each hour. Specifically closed at 19:00hr until 19:15hr, 20:00hr until 20:15hr, 21:00hr until 21:15hr, and 22:00 until 22:15hr. Starting at 23:00hr, the bridge will be closed and remain closed until 06:00hr the following day.
major construction | last updated
Pavilion-Clinton Rd, in both directions. There is a wildfire between Pear Lake Road and Mowhich Road. Road closed to all traffic except emergency vehicles.
major incident | last updated Tue Sep 1 at 12:24 PM PDT. | next update Fri Sep 4 at 12:00 PM PDT.
Washout at Little Lake-Quesnel River Road, 93km Northeast of Williams Lake. Closed. Last update: September 1st, 2026 at 11:14am PDT. Next update: November 2nd, 2026 at 12:00pm MST. Road closed 10 km West of Likely Road Turnoff. No detour. No homes or driveways affected. No access to Quesnel River.
major incident | last updated
Road maintenance from Highway 3, Second Avalanche Gate. Starting Wed Dec 10. Open to traffic. Watch for traffic control. Speed Limit restriction: 30 km/h in Manning Park 42km east of Hwy 5 junction. Last update: September 1st, 2026 at 11:02am PDT. One lane open in each direction.
major construction | last updated
Big Bar Rd, in both directions. There is a wildfire between Little Big Bar Lake Rd and The Big Bar Ferry. Road closed. Road closed to all traffic except emergency vehicles.
major incident | last updated Mon Aug 31 at 1:55 PM PDT. | next update Fri Sep 4 at 12:00 PM PDT.
Meadow Lake Rd, in both directions. There is a wildfire between Dog Creek Rd and Gang Ranch Rd. Road closed. Road closed to all traffic except emergency vehicles.
major incident | last updated Mon Aug 31 at 1:55 PM PDT. | next update Fri Sep 4 at 12:00 PM PDT.
Silver Skagit Rd, in both directions. There is a wildfire between Silver Skagit Rd 6km mark and USA/Canada Border. Road closed. Closure point is approximately 6km south of Flood Hope Rd due to Provincial Parks closure caused by Hozomeen Mountain Wildfire. Silver Lake remains open. Ross Lake Campground and Skagit Valley Park closed.
major incident | last updated Mon Aug 31 at 12:11 PM PDT. | next update Fri Sep 4 at 12:00 PM PDT.
Bridge construction from Highway 5, In Merritt and Exit 286: Merritt - 97C to At Exit to Highway 5A North & Merritt. Starting Tue Aug 25 until Sat Oct 31. Watch for traffic control. Width restriction: 5m. Speed Limit restriction: 50km/h. Last update: August 28th, 2026 at 3:25pm PDT. 1 lane open in each direction at all times.
major construction | last updated
Construction work from 264 Street, In Langley - District and At 58 Ave to Highway 13, In Langley - District and At 52 Ave. Starting Fri Aug 28 until Sat Oct 17. All day, every day. Detour in effect. Watch for traffic control. Last update: August 28th, 2026 at 6:41am PDT. Northbound and southbound traffic will be shifted west onto a new bridge in order to demolish existing bridge and continue various work.
major construction | last updated
Special event from Highway 1A, In Vancouver and Denman St to In Vancouver and Stanley Park Dr. Starting Mon Sep 7 until Mon Sep 7. Exit ramp closed. Last update: August 26th, 2026 at 5:35pm PDT. Vancouver Triathlon. No vehicle access to Stanley Park.
major construction | last updated
Bridge closed at Johnston Bridge Loop, In Quesnel and Front St. Last update: August 26th, 2026 at 9:29am PDT. Next update: October 19th, 2026 at 9:00am PDT. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision.
major incident | last updated
Flooding at McKay Road, 41km Northwest of Williams Lake. Closed. Last update: August 25th, 2026 at 3:15pm PDT. Next update: May 1st, 2027 at 9:00am MST.
major incident | last updated
Landslide at Cave Road, 13km North of Quesnel. Closed. Last update: August 25th, 2026 at 3:03pm PDT. Next update: April 12th, 2027 at 10:00am MST.
major incident | last updated
Utility work. Starting Thu Aug 13 until Wed Sep 30. All day, every day. Closed. Work happening between Carson Rd and Almond Gardens Rd W. Road Closure planned.
major construction | last updated
Utility work. Starting Mon Aug 17 until Mon Sep 7. Closed to all traffic except emergency vehicles. Detour in effect. Drivers are asked to slow down and obey signage and traffic-control personnel, and watch for roadside workers.
major construction | last updated
Road maintenance. Starting Mon Jul 27 until Wed Sep 30. All day, every day. Closed. NW Marine Dr CLOSED. Detour via W 4th Ave/Chancellor Blvd. Spanish Banks Central Parking Lot West CLOSED. Spanish Banks Central parking lot East OPEN via east entrance. East parking lot exit lane open weekends and evenings when possible.
major construction | last updated
Bridge maintenance. Starting Thu Mar 26 until Sun Nov 15. From 9:30 PM to 9:00 AM PST on Saturday and Sunday. From 9:30 PM to 5:00 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Reduced to one lane each direction. Watch for crews and expect a speed limit reduction.
major construction | last updated
Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction.
major construction | last updated
Construction work. Starting Fri Jun 5 until Sat Oct 31. Watch for traffic control. Lane shift in effect. Traffic will be detoured north of the highway to get by the work site. This will remain in effect 24/7.
major construction | last updated
Road construction. Starting Fri Jul 10 until Sat Oct 31. Closed. Traffic will be shifted to the north of the median around 256th St and and will cross over around Lefeuvre Rd. Existing eastbound lanes will be closed. This will remain in place 24/7.
major construction | last updated
Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025.
major construction | last updated
Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions.
major construction | last updated
Bridge construction. Starting Mon Mar 9. Reduced to one lane in each direction. Expect delays northbound on Mt Lehman Rd and on the westbound Highway 1 on-ramp. More info: https://www2.gov.bc.ca/gov/content/transportation-projects/fraser-valley-highway1/264th-street-to-mt-lehman-road/mt-lehman-road-interchange.
major construction | last updated

Road Reports and Closures on BC Secondary Routes

Snow Tires vs. All Season Tires which ones do you need?

Don’t have twitter? View DriveBC’s Twitter feed here for BC Highway Closures and BC Road Closures.

Before you head off to your next destination, it helps to check traffic, road and weather conditions along the way. Use these links to get the information you need for a safe trip. See whats happening on major routes, bridges, tunnels and borders across the province. Check out road Conditions closures for major routes in British Columbia, and routes by highway number and area. BC highway closures BC Road Closures. On a side note: When the BC weather get you down. Why not enjoy a nice sunny Vacation on Clothing Optional St Martin (sxm) , Hawaii or Zipolite Mexico.

Do You Need a Pleasure Craft Operator Card?

All operators of powered watercraft used for recreational purposes within BC, Canada now require a Pleasure Craft Operator Card.

Boaters are now required to have the Pleasure Craft Operator Card – Boaters Licence in order to operate a powered watercraft. There is no grandfather clause or age exemption – this law applies to all boaters. Powered watercraft includes watercraft fitted with any size motor – even a trolling motor. This includes operating a PWC – Licence for Jetski or Seadoo type device.

Get Your Pleasure Craft Operator Card Online!

Filed Under: Road Reports

Highway 4 Road Conditions

by

Highway 4 road conditions report for Vancouver Island including Hwy 4 weather cams.

Road maintenance. Starting Mon Feb 12. Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Daytime travel restriction, must travel between 9pm-5am.
minor construction | last updated | next update Mon Mar 1, 2027 at 3:00 PM PDT.

Highway 4 is the longest east–west main vehicle route on Vancouver Island with a total length of 162 km (101 mi).

It is known locally as the “Alberni Highway” to the east of Port Alberni; and the “Pacific Rim Highway” to the west.

It’s important to check the highway 4 road conditions report to Tofino BC.

Highway 4’s eastern terminus is at the interchange with Highway 19 road report at Qualicum Beach; however, the roadway continues north as Memorial Avenue for 4 km (2 mi) to Highway 19A Road report.

From Highway 19, it travels south for to a junction with an older Alberni Highway segment, now known as Highway 4A, at the small community  Coombs.

Highway 4 veers directly west upon meeting this junction. Hwy 4 Weather Cams

West of Coombs Junction, Highway 4 goes to Cameron Lake.

Highway 4 hugs the shore of Cameron Lake and then winds its way through Cathedral Grove.

Past Cameron Lake, Highway 4 follows the Cameron River to the Port Alberni Summit known by locals as “The Hump”.

It then descends for 6 km (4 mi) to a spur that travels into the city centre of Port Alberni.

Highway 4 enters the city limits of Port Alberni 2 km (1.2 mi) west of the main spur into the city, and 5 km (3 mi) later, exits Port Alberni via a bridge over the Somass River.

West of the Somass River crossing, Highway 4 reaches the shore of Sproat Lake. It followsthe lake shore west for 24 km (15 mi).

Highway 4 then follows the Taylor River to the summit of Sutton Pass (elevation: 240 metres (790 ft)), before reaching the southeast shore of Kennedy Lake.

The highway then follows the shore of Kennedy Lake southwest for 19 km (12 mi), and reaches a junction with a spur into the district municipality of Ucluelet (known locally as “The Junction”).

The hwy continues in a northwest direction and enters the Long Beach Unit of Pacific Rim National Park Reserve.

Highway 4 goes through the national park for 22 km (14 mi) northwest before terminating at Tofino BC.

Road Report for Highway 4A Hwy 19 through Coombs to Hwy 4

Port Alberni Visitors Information

Highway 4 Road Conditions

Filed Under: Cameras, Road Reports

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 6
  • Go to page 7
  • Go to page 8
  • Go to page 9
  • Go to page 10
  • Go to Next Page »

Primary Sidebar

Caribbean Business for Sale

Move to Sint Maarten with this incredible opportunity 

Best Personal Breathalyzer

Personal Breathalyzer
Dont risk a DUI. Make sure you don’t drive while impaired Get a personal breathalyzer check your alcohol levels and drive responsibly.




This 'travel news' services website is privately owned. It is not affiliated or sanctioned by the Government of BC, nor is it part of the provincial governments - DriveBC program or websites, operated by the BC Ministry of Transportation and Infrastructure. The data and electronic links provided in this web site are for informational purposes only and bchighway.com disclaims all responsibility for the accuracy of site content or linked information. This information obtained from bchighway.com should not be used as a basis for making financial or other commitments. Privacy Agreement © 1996–2026 bchighway.com - All Rights Reserved.