• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

British Columbia Highway News

Integrating BC Transportation Travel News Services and Products

  • BC Road Report News
  • Closures & Incidents
  • Mountain Pass Webcams
  • Canada / USA – Border Cameras
  • About us

Road Reports

Northern Routes Road Conditions

by

Northern Routes Road Conditions Reports for British Columbia’s Peace district, Fort George district, Bulkley Stikine district and Skeena highways district.

Old Alaska Highway, in both directions. Geotechnical investigation at Kiskatinaw Curved Bridge near Dawson Creek. Bridge is closed. Assessment in progress. Slide impacting bridge.
minor construction | last updated Fri Jan 2 at 10:30 AM MST. | next update Mon May 4 at 10:00 AM MST.
3 Rolla Road. Washout between 230 Road and 203 45 km north of Dawson Creek. Road closed. Detour in effect. Detour Shearer Dale and 203 road.
minor incident | last updated Tue Apr 21 at 1:03 AM MST. | next update Wed Apr 22 at 9:00 AM MST.
Old Fort Road. Landslide between River Road and River Drive. Road closed. Please avoid the area, road now closed to all public.
minor incident | last updated Mon Apr 20 at 11:47 PM MST. | next update Tue Apr 21 at 10:00 AM MST.
Highway 97 (Alaska Highway). Bridge maintenance planned between Taylor Bridge and McMahon Dr (Taylor). Starting Fri Apr 24 at 7:00 PM MST until Sat Apr 25 at 3:30 AM MST. Single lane alternating traffic will be in effect.
minor construction | last updated Mon Apr 20 at 9:23 AM MST.
Germansen Landing Road, northbound. Geotechnical investigation between 1.5KM and 2.5KM near Fort St James. Road closed. Closed at the 1.7 kilometre mark. Detour in Effect using the Takla Road to Teardrop Forest Service Road.
minor construction | last updated Tue Apr 7 at 3:08 PM PDT. | next update Fri May 29 at 4:30 PM PDT.
Highway 5, southbound. Construction work between Miledge Creek Bridge and Thunder River Rd for 4.9 km (17 to 12 km north of Blue River). Until Sat Nov 7 at 5:00 PM PST. From 8:00 AM to 5:00 PM PST on weekdays. Watch for traffic control. Single Lane Alternating Traffic will only be required for a brief duration during mobilization and demobilization of materials and equipment.
minor construction | last updated Mon Jan 26 at 10:10 AM PST.
Highway 16 (Yellowhead Highway), westbound. Construction work between Moose Lake Boat Launch and Hargreaves Rd for 29.0 km (16 km east of Tete Jaune to 2 km east of Moose Lake). Until Thu Apr 23 at 5:00 PM PDT. Single lane alternating traffic. Lane Closure.
minor construction | last updated Tue Mar 10 at 1:56 PM PDT.
Highway 27, in both directions. Utility work between Braeside Rd and Malcom Rd for 39.0 km (7 to 46 km south of Fort St James). Until Mon May 11 at 5:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Wed Apr 15 at 2:50 PM PDT.
Highway 97, in both directions. Utility work planned between Tallus Rd and Crooked River Provincial Park for 13.3 km (54 to 41 km north of Prince George). Starting Mon Apr 27 at 9:00 AM PDT until Fri May 1 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel.
minor construction | last updated Wed Apr 8 at 3:29 PM PDT.
Highway 97, southbound. Special event planned between Carp Lake Rd and Haight Rd for 6.0 km (McLeod Lake). Starting Wed Aug 5 at 8:00 AM PDT until Wed Aug 5 at 2:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel.
minor special event | last updated Wed Apr 8 at 3:36 PM PDT.
Highway 97, in both directions. Utility work between Kelly Rd N and Edric Rd for 23.3 km (Prince George). Until Thu May 14 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Thu Apr 9 at 8:37 AM PDT.
Highway 97, southbound. Utility work planned between 22nd Ave and Upland St for 1.2 km (Prince George). Starting Thu May 7 at 9:00 AM PDT until Thu May 7 at 2:00 PM PDT. Right lane will be closed.
minor construction | last updated Tue Apr 14 at 2:21 PM PDT.
Highway 16 (Yellowhead Highway), in both directions. Construction work between Jardine Rd and Tapping Rd for 4.8 km (11 to 6 km west of Bednesti Norman). Until Mon Apr 27 at 5:00 PM PDT. Watch for traffic control.
minor construction | last updated Wed Apr 15 at 1:45 PM PDT.
Highway 97. Road sweeping planned between Edric Rd and Grizzly Ave for 37.8 km (19 to 57 km north of Prince George). Starting Tue Apr 21 at 7:00 AM PDT until Tue Apr 21 at 4:30 PM PDT. Shoulder will be closed.
minor construction | last updated Mon Apr 20 at 9:13 AM PDT.
Highway 37. Frost heaves between Tatogga Lake Resort and Stikine Bridge for 46.9 km (Tatogga to 30 km north of Iskut).
minor weather condition | last updated Mon Apr 20 at 3:52 PM PDT.
Highway 37. Watch for slippery sections between Burrage River Bridge and Tatogga Lake Resort for 57.6 km (35 km north of Bob Quinn to Tatogga). Frost heaves.
minor road condition | last updated Mon Apr 20 at 3:52 PM PDT.
Highway 37. Frost heaves between Deltaic Cr Bridge and Burrage River Bridge for 111.9 km (26 km south of Bell II to 35 km north of Bob Quinn).
minor weather condition | last updated Mon Apr 20 at 3:52 PM PDT.
Telegraph Creek Rd (Highway 51). Watch for slippery sections between Stikine Ave and Riverview Dr for 56.6 km (Telegraph Creek to 51 km west of Dease Lake). Muddy sections.
minor road condition | last updated Mon Apr 20 at 4:03 PM PDT.
Telegraph Creek Rd (Highway 51). Muddy sections between Burnt Trailer/Tanzilla Acc and Boulder Ave for 54.5 km (Dease Lake).
minor road condition | last updated Mon Apr 20 at 3:52 PM PDT.
Highway 37. Watch for slippery sections between Stikine Bridge and the end of Highway 37 for 282.9 km (30 km north of Iskut to British Columbia and Yukon Border). Frost heaves.
minor road condition | last updated Mon Apr 20 at 3:52 PM PDT.
Highway 37, in both directions. Special event planned between Kitwanga Lake Rd S and Kitwanga Lake Rd N (25 km north of Kitwanga). Starting Tue Apr 21 at 11:00 AM PDT until Tue Apr 21 at 8:00 PM PDT. Watch for traffic control personnel. Controlled burn. Possible intermittent closures on highway due to limited visibility or smoke. The public will be notified if any closure is put in place.
minor special event | last updated Mon Apr 20 at 4:12 PM PDT.
Usk Ferry. Seasonal shutdown between Usk Ferry and the end of Usk Ferry (Usk). Seasonal shutdown. Cable car in service.
minor incident | last updated Thu Jan 8 at 2:39 PM PST.
Skeena Drive. Road construction work between Highway 16 and Port Edward. From 6:00 AM to 6:00 PM PDT daily. Watch for traffic control. Single lane alternating traffic.
minor construction | last updated Mon Apr 20 at 6:25 PM PDT. | next update Fri Apr 24 at 6:00 PM PDT.
Highway 16 (Yellowhead Highway), in both directions. Construction work at 3rd Ave E (Prince Rupert). Until Mon May 11. Single lane alternating traffic. Alternating road closures on 3rd Ave W and 3rd Ave E. Local detour in effect. Watch for traffic control.
minor construction | last updated Wed Apr 8 at 7:42 AM PDT.
Highway 37, in both directions. Roadside brushing between Forest Ave and Oolichan Ave for 3.4 km (2 to 6 km north of Kitimat). Until Thu Apr 23. From 7:30 AM to 5:30 PM PDT daily. Single lane alternating traffic. Expect minor delays.
minor construction | last updated Mon Apr 20 at 10:00 AM PDT.

Highway 97 Road Conditions Report

BC Highway 16 Yellowhead Hwy Road Reports

Highway 37 Road Conditions

Road Condition Reports for Alaska

Filed Under: Area, Road Reports

Okanagan Shuswap Road Conditions

by

Okanagan Shuswap Road Conditions – Okanagan Shuswap Nichola Merritt

Including the Thompson Nicola Merritt Area

Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Use Highway 97A and 97B. Single lane alternating traffic nightly Mon-Sat 8PM-6AM. Local access to Old Sicamous Rd. And Old Spallumcheen Rd. At the top of the hour only when closures are in place. No thru-traffic. Last updated Wed Apr
major construction | last updated | next update Wed Apr 22 at 12:00 PM PDT.
Highway 97. Bridge construction between Island Rd and Tucelnuit Dr (5 km north of Oliver). Until Tue Jun 30. Single lane alternating traffic. Watch for traffic control. Wide loads, use detour of Hwy 3 to Hwy 3A. Lane width is restricted to 3.8m. Site contact: Colin King 604-754-0626.
minor construction | last updated Mon Feb 2 at 10:31 AM PST.
Highway 97. Construction work between Trepanier Bench Rd and Buchanan Rd for 1.4 km (Peachland). Until Sun May 31. From 7:00 PM to 6:00 AM PST on Sunday, Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Tue Mar 3 at 1:48 PM PST.
Highway 97, in both directions. Construction work at Callan Rd (1 km north of Summerland). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Speed reduction to 70km/hr. Caution advised as company pick-ups will be entering and exiting onto highway more frequently at both the north and south end of the work zone. No closures or traffic interruptions scheduled.
minor construction | last updated Fri Apr 17 at 5:29 PM PDT. | next update Sat Apr 25 at 6:00 PM PDT.
Highway 3A, in both directions. Utility work between Barlelo Rd and Stagecoach Rd for 4.6 km (3 to 8 km east of Keremeos). Until Wed May 20. From 7:00 AM to 6:00 PM PST daily.
minor construction | last updated Wed Mar 4 at 9:33 AM PST.
Highway 1 (TransCanada Highway). Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Sat Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Localized speed reductions and intermittent minor stoppages.
minor construction | last updated Fri Mar 6 at 12:24 PM PDT.
Highway 6 EW. Road construction work at Middleton Way (Vernon). Until Fri Jul 31. 15th St northbound closed. Highway 6 turn lanes to 15th St northbound closed. Detour via Pottery Road.
minor construction | last updated Fri Mar 13 at 11:46 AM PDT.
Highway 6 EW. Watch for falling rocks between North Fork Rd and Monashee Summit for 42.1 km (Cherryville to Monashee Summit).
minor incident | last updated Tue Apr 21 at 1:02 AM PDT.
Highway 97, in both directions. Road sweeping between Tonasket Rd and Monte Creek for 67.8 km (18 km north of Vernon to Monte Creek). Until Thu Apr 30. Moving Work Zone! Watch for slow moving vehicles and equipment, shadow trucks will be following equipment.
minor construction | last updated Wed Mar 25 at 10:02 AM PDT.
Westside Rd. Industrial traffic may slow or block regular traffic. Between Main St and Shelter Cove for 2.7 km (16 to 14 km east of West Kelowna). Until Tue Jun 30 at 4:00 PM PDT.
minor construction | last updated Wed Mar 25 at 12:41 PM PDT.
Old Okanagan Hwy, in both directions. Utility work between Shannon Lake Rd and Daimler Dr. Until Sat Oct 31 at 7:00 AM PDT. Lane closures in effect. Watch for traffic control.
minor construction | last updated Wed Mar 25 at 12:43 PM PDT.
Highway 97A, in both directions. Tree pruning between Mara Heights Rd and Graham Rd for 4.2 km (Sicamous). Until Mon May 4 at 5:00 PM PDT. Single lane alternating traffic.
minor construction | last updated Tue Mar 31 at 8:54 AM PDT.
Highway 1 (TransCanada Highway). Watch for falling rocks between Des Fosses Rd and Bernie Rd for 57.6 km (8 km west of Sicamous to 14 km east of Chase).
minor incident | last updated Tue Apr 21 at 1:02 AM PDT.
Highway 97B. Watch for falling rocks between Black Rd and Highway 1 for 5.6 km (Salmon Arm).
minor incident | last updated Tue Apr 21 at 1:02 AM PDT.
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Maier Rd and Husky Frtg for 0.2 km (Sicamous). Starting Sat Apr 25 at 8:00 AM PDT until Mon Apr 27 at 4:00 PM PDT. Shoulder will be closed.
minor construction | last updated Tue Apr 7 at 1:23 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Utility work between Highway 97B and 70 Ave NE for 4.6 km (Salmon Arm). Until Fri Apr 24 at 4:00 PM PDT. Single lane alternating traffic.
minor construction | last updated Tue Apr 7 at 1:54 PM PDT.
Highway 6 EW, westbound. Utility work between Rawlings Lake Rd and Creighton Valley Rd for 3.4 km (1 to 4 km east of Lumby). Until Fri May 1. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Speed reduced to 60km/hr.
minor construction | last updated Wed Apr 8 at 10:42 AM PDT.
Highway 3 (Crowsnest Highway). Road sweeping between Copper Mountain Rd and 9th St for 66.2 km (Keremeos to Princeton). Until Fri May 1 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Slow Down & Move Over - Moving Work Zone. Watch for slow moving vehicles and equipment, shadow trucks will be following equipment.
minor construction | last updated Mon Apr 13 at 11:38 AM PDT.
Adams Lake Ferry, in both directions. There will be a safety inspection between Adams Lake Ferry and the end of Adams Lake Ferry (Adams Lake). Starting Tue Apr 28 at 8:00 AM PDT until Tue Apr 28 at 5:00 PM PDT.
major construction | last updated Mon Apr 13 at 11:15 AM PDT. | next update Tue Apr 28 at 5:00 PM PDT.
Highway 1 (TransCanada Highway). Roadside brushing between Old Ferry Rd and Stoney Flats Rd for 11.2 km (7 km east of Kamloops to 17 km west of Chase). Until Tue May 5. Slow down and move over. Tree removal and brushing on shoulder. Watch for moving equipment and crews.
minor construction | last updated Tue Apr 14 at 9:25 AM PDT.
Highway 97A, in both directions. Utility work between Cliff Ave and Stanley Ave for 0.2 km (Enderby). Until Fri May 1 at 6:00 PM PDT. From 8:00 AM to 6:00 PM PDT on weekdays. Left turn lane closed. Watch for traffic control.
minor construction | last updated Thu Apr 16 at 9:54 AM PDT.
Highway 1 (TransCanada Highway), eastbound. Geotechnical investigation between 4 Ave SW and 10 St SW for 0.3 km (Salmon Arm). Until Fri May 1. From 8:00 AM to 4:00 PM PDT daily.
minor construction | last updated Thu Apr 16 at 10:35 AM PDT.
Adams Lake Ferry, in both directions. Ferry will be out of service at Adams Lake Ferry (Adams Lake). Starting Fri May 1 at 10:00 PM PDT until Sat May 2 at 6:00 AM PDT. There will be required maintenance.
major construction | last updated Mon Apr 20 at 9:29 AM PDT. | next update Sat May 2 at 6:00 AM PDT.
Adams Lake Ferry, in both directions. Ferry will be out of service at Adams Lake Ferry (Adams Lake). Starting Sat May 2 at 10:00 PM PDT until Sun May 3 at 6:00 AM PDT. There will be required maintenance.
major construction | last updated Mon Apr 20 at 9:31 AM PDT. | next update Sun May 3 at 6:00 AM PDT.
Highway 97, in both directions. Road sweeping between Bentley Rd and Gellatly Rd for 30.8 km (Summerland to West Kelowna). From 8:00 PM to 5:00 AM PDT on Monday and Tuesday. Watch for crews.
minor construction | last updated Mon Apr 20 at 6:57 PM PDT.

Helmer Road. Construction work between Highway 5 northbound and Highway 5 southbound near Merritt. Until Sun Sep 20, 2026. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic.
minor construction | last updated Thu Sep 25 at 11:10 AM PDT.
Highway 1 (TransCanada Highway), in both directions. Construction work between Gladwin Rd and Nicomen River Rd (7 km east of Lytton). Until Mon Jun 8. Watch for traffic control. Gladwin Culvert Replacement. Please watch for signage and personnel. Expect minor delays of up to 5 minutes. Next update time Mon Jun 8.
minor construction | last updated Thu Jan 22 at 4:43 PM PST. | next update Mon Jun 8. Last updated Thu Jan 22 at 4:43 PM PST.
Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Thu Apr 30. SITE 9/10. Up to 30-min may occur between 10am-2pm daily.
minor construction | last updated Mon Jan 5 at 8:46 AM PST. | next update Thu Apr 30 at 2:00 PM PST.
Highway 5, in both directions. Construction work between Hoirup Rd and Skinner Rd (10 km north of Vavenby). Until Thu Apr 30 at 5:00 PM PST. From 7:00 AM to 7:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Culvert install near the junction of Hwy 5 and Martin Creek Forest Service Road.
minor construction | last updated Tue Jan 6 at 10:41 AM PST. | next update Wed Apr 29 at 10:00 AM PST.
Highway 1 (TransCanada Highway). Watch for falling rocks between Blue Lake Rd and Junction Hwy 8 for 51.4 km (1 km west of Spences Bridge to 1 km north of Jackass Mountain Summit).
minor incident | last updated Tue Apr 21 at 1:04 AM PDT.
Highway 1 (TransCanada Highway), in both directions. Construction work between Nicomen River Rd and Junction Hwy 8 (13 km west of Spences Bridge). Until Wed Jun 30, 2027. Single lane alternating traffic will be in effect at Sackum Overhead 24/7 April 20 until December 2026. Speed reduced to 50km/h. Watch for signage and personnel. Expect minor delays. Please obey signage and signals.
minor construction | last updated Mon Apr 20 at 10:58 AM PDT. | next update Wed May 20 at 1:00 PM PDT.
Highway 12. Watch for falling rocks between the start of Highway 12 and Kirbys Flat Rd for 22.2 km (Lytton).
minor incident | last updated Tue Apr 21 at 1:04 AM PDT.
Highway 1 (TransCanada Highway). Wildlife advisory in effect between Junction Hwy 12 and Nicomen River Rd for 17.2 km (Lytton).
minor incident | last updated Tue Apr 21 at 1:04 AM PDT.
Highway 5 (Coquihalla North), southbound. Maintenance planned between Inks Lake Rd and Exit 336: Walloper Interchange for 9.8 km (15 km north of Surrey Lake Summit to 9 km south of Kamloops). Starting Tue Apr 28 until Thu Apr 30. From 7:30 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Right lane will be closed. Watch for traffic control personnel.
minor construction | last updated Mon Mar 23 at 10:02 AM PDT.
Highway 1 (TransCanada Highway), westbound. Maintenance planned between Six Mile Hill Rd and Tunkwa Lake Rd for 9.2 km (30 to 20 km west of Kamloops). Starting Thu Apr 30 until Fri May 1. From 8:00 AM to 6:00 PM PDT on Thursday and Friday. Right lane will be closed. Watch for traffic control personnel.
minor construction | last updated Mon Mar 23 at 8:03 PM PDT.
Highway 1 (TransCanada Highway), eastbound. Road sweeping between Grand Blvd and Miners Bluff Rd for 23.5 km (Kamloops). Please watch for slow moving vehicles and crews.
minor construction | last updated Tue Mar 24 at 6:21 AM PDT.
Highway 1 (TransCanada Highway), in both directions. Paving operations between Kanaka Station Rd and Gladwin Rd for 21.6 km (4 km north of Jackass Mountain Summit to 5 km east of Lytton). Until Sat May 9 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays.
minor construction | last updated Mon Apr 13 at 12:01 PM PDT.
Highway 5, in both directions. Tree pruning between Hanson Rd and Hummingbird Rd for 37.3 km (Barriere to 3 km north of Little Fort). Until Fri Apr 24. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic.
minor construction | last updated Thu Apr 2 at 2:15 PM PDT.
Highway 5. Tree pruning between Westsyde Rd and Boulder Mountain Rd for 11.5 km (1 to 12 km north of Barriere). Until Fri Apr 24 at 5:00 PM PDT. Single lane alternating traffic.
minor construction | last updated Thu Apr 9 at 10:39 AM PDT.
Highway 5A, in both directions. Geotechnical investigation planned between Campbell Creek Rd and Rose Hill Rd for 10.0 km (10 km south of Kamloops to Kamloops). Starting Tue May 5 at 8:00 AM PDT for several days. Single lane alternating traffic will be in effect. Expect minor delays.
minor construction | last updated Mon Apr 13 at 12:21 PM PDT. | next update Sat May 9 at 8:00 AM PDT.
Highway 8, in both directions. Paving operations between Porcupine Ridge Rd and Junction Highway 5 for 51.8 km (9 km east of Spences Bridge to Merritt). Until Tue Jun 30. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays.
minor construction | last updated Wed Apr 15 at 9:03 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Road sweeping between Tunkwa Lake Rd and Cavesson Way for 11.3 km (18 to 30 km west of Kamloops). Single lane alternating traffic. Watch for slow moving vehicles and crews.
minor construction | last updated Mon Apr 20 at 6:26 AM PDT.
Highway 24, in both directions. Tree pruning planned between McNab Rd and Junction Hwy 5 for 5.9 km (Little Fort). Starting Wed Apr 22 until Fri May 1. From 7:30 AM to 4:30 PM PDT on weekdays. Watch for traffic control personnel. In some locations, traffic will be single lane alternating. In three-lane sections, just one lane will be closed.
minor construction | last updated Mon Apr 20 at 12:07 PM PDT.
Highway 1 (TransCanada Highway), westbound. Electrical maintenance planned between Savona Access Rd and Savona Station Rd (34 km east of Cache Creek). Starting Tue Apr 21 at 9:30 AM PDT until Tue Apr 21 at 12:00 PM PDT. Speed reduction in place for westbound traffic 70km/h.
minor construction | last updated Mon Apr 20 at 12:09 PM PDT.
Highway 1 (TransCanada Highway), eastbound. Electrical maintenance planned between West Kamloops and Copperhead Dr for 0.1 km (Kamloops). Starting Tue Apr 21 at 1:00 PM PDT until Tue Apr 21 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Right lane closed watch for traffic control and crews on scene.
minor construction | last updated Mon Apr 20 at 12:15 PM PDT.
Highway 5, westbound. Electrical maintenance planned between Halston Ave and Salish Road 1 km north of Kamloops. Starting Thu Apr 23 at 8:00 AM PDT until Thu Apr 23 at 11:00 AM PDT. Left lane will be closed. Watch for traffic control personnel. Fast lane will be closed watch for traffic control and crews on scene.
minor construction | last updated Mon Apr 20 at 12:24 PM PDT.
Highway 1 (TransCanada Highway), westbound. Electrical maintenance planned between Vicars Rd and Comazzetto Rd (Kamloops). Starting Thu Apr 23 at 12:00 PM PDT until Thu Apr 23 at 4:00 PM PDT. Left lane will be closed. Watch for traffic control personnel. Left lane closed, watch for traffic control.
minor construction | last updated Mon Apr 20 at 12:34 PM PDT.
Highway 5. Utility work planned between Hoirup Rd and Skinner Rd for 5.0 km (14 to 19 km north of Vavenby). Starting Mon Apr 27 at 6:00 AM PDT until Wed Apr 29 at 6:00 PM PDT. From 6:00 AM to 6:00 PM PDT on Monday, Tuesday and Wednesday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Work site is between the Mad River Bridge and East Mad River Forest Service Road.
minor construction | last updated Mon Apr 20 at 3:23 PM PDT.
Highway 5 (Coquihalla South), northbound. Vehicle fire between Exit 250: Larson Hill and Exit 286: Merritt - 97C for 36.3 km (31 km north of Coquihalla Summit to Merritt). Road closed. Toxic material on the roadway. Alternate route via Highway 1 or Highway 3 to Highway 5A.
major incident | last updated Tue Apr 21 at 12:32 AM PDT. | next update Tue Apr 21 at 6:15 AM PDT.

Links to Highways in the Reported Areas

BC Highway 1 Road Conditions

Highway 97 Road Conditions

Highway 6EW Road Conditions

Highway 5A Road Conditions

Don’t feel like driving? Fly out of Kamloops

Filed Under: Area, Road Reports

Kootenay Area Road Conditions

by

BC Kootenay Area Road Conditions Reports for the Kootenay’s

Highway 3 (Crowsnest Highway). Watch for falling rocks between West Avalanche Gate and West Creston Rd for 32.1 km (10 km west of Kootenay Pass to 21 km west of Creston).
minor incident | last updated Wed Mar 25 at 4:03 PM PDT.
Highway 3 (Crowsnest Highway). Watch for falling ice between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass).
minor incident | last updated Wed Mar 25 at 4:03 PM PDT.
Highway 3 (Crowsnest Highway), in both directions. Watch for falling rocks between 68th Ave and Highway 3B for 66.5 km (Grand Forks to 24 km west of Castlegar).
minor incident | last updated Wed Mar 25 at 4:03 PM PDT.
Highway 6 NS, in both directions. Watch for falling rocks between Junction Hwy 31A and Springer Creek Rd for 31.5 km (New Denver to 1 km south of Slocan).
minor incident | last updated Wed Mar 25 at 4:03 PM PDT.
Highway 6 EW. Watch for falling rocks between Needles North Rd and Needles Ferry (1 km west of Needles). Watch for fallen rocks west of Needles.
minor incident | last updated Wed Apr 15 at 11:33 AM PDT.
Highway 3A. Road maintenance work between Kuskonook Rest Area and Bathie Rd (4 km south of Kuskonook). Until Fri May 29. From 1:30 PM to 2:30 PM PDT on weekdays. Road closed. Single lane alternating traffic. Expect major delays. Closed from 1:30pm-2:30pm daily, with 20 minute delays and single alternating traffic on week days. Next update time Fri May 29.
major construction | last updated Mon Mar 30 at 8:19 AM PDT. | next update Fri May 29. Last updated Mon Mar 30 at 8:19 AM PDT.
Kootenay Lake Ferry. Possible ferry delays at Kootenay Lake Ferry. Until Tue May 5 at 2:30 PM PDT. Due to required maintenance. Osprey 2000 ferry will be out of service for semi-annual maintenance. The MV Balfour will be in service with reduced deck capacity. Potential sailing waits.
minor incident | last updated Mon Mar 30 at 2:43 PM PDT. | next update Tue May 5 at 2:15 PM PDT.
Needles Ferry, in both directions. There will be a safety inspection between Needles and Fauquier. Starting Wed Apr 29 at 8:00 AM PDT until Wed Apr 29 at 5:00 PM PDT. There will be delays up to 30 minutes.
major construction | last updated Mon Apr 13 at 11:24 AM PDT. | next update Wed Apr 29 at 5:00 PM PDT.
Kootenay Lake Ferry. Possible ferry delays at Balfour Terminal. The Tuesday, April 21, 2:50 p.M. Sailing may be delayed due to a Transport Canada safety drill.
minor incident | last updated Mon Apr 20 at 9:27 AM PDT. | next update Tue Apr 21 at 3:00 PM PDT.

The Kootenays are a large region in British Columbia Canada. This area begins at the Alberta Border and extends west to the Monashee range of the Columbia Mountains. The area is famed for its laid-back lifestyle and endless outdoor adventure opportunities.

Highway 3 Road Conditions

Highway 6 road Conditions

Highway 33 Road Conditions

Highway 41 USA to Highway Route 3

Highway 43 Elk Valley Highway Road Conditions

The name is derived from the Ktunaxa First Nation’s quthni, meaning “to travel by water”, and indeed this is how the region was explored before the railway arrived. Exploration by river and lake, and commerce facilitated by the large sternwheelers that plied the many large lakes emphasize this point. Virtually untouched until the gold and silver rushes of the mid-1800s, a few settlers who fell in love with the area remained after the fortunes faded, and provided the roots for the communities as they exist today. Info from Wikipedia BC Kootenay Area Road Conditions.

Filed Under: Area, Road Reports

Rocky Mountain Road Conditions

by

Rocky Mountain Road Conditions

Highway 1 BC Road Report and Highway Conditions

Road reports and travel conditions through Rocky Mountain highway routes

Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes.
minor incident | last updated Mon Feb 2 at 10:29 AM PST. | next update Tue Jun 30 at 10:00 AM PST.
Highway 1 (TransCanada Highway). Rest area closed at Redgrave (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses.
minor incident | last updated Sun Nov 30 at 11:48 PM MST.
Highway 1 (TransCanada Highway), in both directions. Maintenance between Perry River Bridge and Highway 23 South for 40.6 km (26 km east of Sicamous to Revelstoke). Until Sun Jun 14. From 5:00 AM to 6:00 PM PDT daily. Watch for traffic control. Weed control works. Watch for slow moving vehicles on shoulder.
minor construction | last updated Thu Feb 26 at 4:00 PM PDT.
Highway 23, in both directions. Maintenance between Shelter Bay Provincial Pk and Junction Highway 1 for 48.5 km (Revelstoke). Until Sun Jun 14. From 5:00 AM to 6:00 AM PDT daily. Watch for traffic control. Weed control works. Watch for slow moving vehicles on shoulder.
minor construction | last updated Fri Feb 27 at 8:53 AM PDT.
Highway 23, in both directions. Maintenance between Junction Highway 1 and Mica Dam for 149.9 km (Revelstoke). Until Sun Jun 14. From 5:00 AM to 6:00 PM PDT daily. Watch for traffic control. Weed control works. Watch for slow moving vehicles on shoulder.
minor construction | last updated Thu Feb 26 at 4:04 PM PDT.
Highway 1 (TransCanada Highway). Rest area closed at Highway 23 South (Revelstoke). Until Sat Oct 31. The Revelstoke Rest Area will be closed due to highway upgrades in the area. Nearby rest areas that remain open: Illecillewaet Break check rest area (Commercial and passenger vehicles), Rutherford rest area (Passenger vehicles), Shelter Bay rest area (Passenger vehicles) and The Last Spike rest area (commercial and passenger vehicles).
minor incident | last updated Wed Mar 4 at 12:16 PM PDT.
Highway 3 (Crowsnest Highway), in both directions. Road maintenance work between Jim Smith Lake Rd and 30th Ave N for 5.7 km (Cranbrook). Until Fri May 15 at 3:15 PM MDT. From 7:30 AM to 3:15 PM MDT on weekdays. Right lane closed. Last updated Mon Apr 13 at 1:24 PM MDT.
minor construction | last updated
Highway 1 (TransCanada Highway), westbound. Washout between Glacier National Park East Boundary and Beaver Valley Rd for 1.0 km (11 to 10 km west of East Boundary of Glacier National Park). Lane Closure. Westbound slow lane is closed on Beaver Hill. Fast lane remains open.
minor incident | last updated Tue Mar 31 at 12:58 PM PDT. | next update Fri May 22 at 12:00 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 15.8 km (14 km east of East Boundary of Glacier National Park to 25 km west of Golden). Until Sun Dec 20. Construction zone reduced speed limit in effect. Lane widths are 5 meters each direction. Watch for crews and expect delays. Last updated Mon Mar 30 at 8:49 AM MDT.
minor construction | last updated
Highway 1 (TransCanada Highway), in both directions. Road sweeping at Columbia River Bridge (Revelstoke). Until Thu Apr 23. From 6:00 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays.
minor construction | last updated Tue Mar 31 at 12:00 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Road sweeping planned between Perry River Bridge and Columbia River Bridge for 41.4 km (Revelstoke to 25 km east of Sicamous). Starting Mon Apr 27 until Thu Apr 30. From 6:00 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Expect minor delays.
minor construction | last updated Tue Mar 31 at 12:02 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Thu May 14. Expect 30-minute closures 24 hours a day. Possible 2-hour closures between 6am-8am, Mon-Sat and 1am-3am on Sun.
major construction | last updated Tue Apr 14 at 11:57 AM PDT. | next update Thu May 14 at 12:00 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Utility work between Wiseman Rd and Golden Donald Upper Rd for 26.3 km (Golden). Until Sun May 31 at 10:00 PM MDT. From 6:00 AM to 10:00 PM MDT daily. Lane closures in both directions in effect. Single lane alternating traffic. Watch for traffic control. Work continues on Highway 95 to 12th Street South. Last updated Sat Apr 11 at 12:22 PM MDT.
minor construction | last updated
Highway 95, in both directions. Utility work between 12th St S and the end of Highway 95 for 2.4 km (Golden). Until Sun May 31 at 10:00 PM MDT. From 6:00 AM to 10:00 PM MDT daily. Lane closures in both directions in effect. Single lane alternating traffic. Watch for traffic control. Work continues up to Wisemen Road on Highway 1 north west of Golden. Last updated Sat Apr 11 at 12:26 PM MDT.
minor construction | last updated
Highway 95, in both directions. Utility work between Gacek Rd and Station Ave for 50.3 km (26 km north of Brisco to Golden). Until Sun May 31 at 10:00 PM MDT. From 6:00 AM to 10:00 PM MDT daily. Left turn lane closed. Right lane is blocked. Single lane alternating traffic. Shoulder closed. Watch for traffic control. Last updated Sat Apr 11 at 1:18 PM MDT.
minor construction | last updated
Highway 23, southbound. Utility work planned between Nixon Rd and Big Eddy Rd for 0.1 km (Revelstoke). Starting Fri Apr 24 at 8:30 AM PDT until Fri Apr 24 at 3:00 PM PDT. Single lane alternating traffic will be in effect.
minor construction | last updated Mon Apr 13 at 10:48 AM PDT.
Upper Arrow Lake Ferry, in both directions. There will be a safety inspection between Shelter Bay and Galena Bay. Starting Tue Apr 28 at 10:00 PM PDT until Thu Apr 30 at 5:00 PM PDT. April 28th & 29th: Last sailing from Shelter Bay 10:00PM. Last sailing form Galena Bay 10:30 PM. April 30th: Expect up to 60 min delays from 8AM to 5PM.
major construction | last updated Mon Apr 13 at 11:22 AM PDT. | next update Thu Apr 30 at 5:00 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Maintenance planned between Three Valley Avalanche Gate and Clanwilliam OH Bridge for 9.8 km (18 to 9 km west of Revelstoke). Starting Tue Apr 21 at 8:00 AM PDT until Tue Apr 21 at 11:00 AM PDT. Watch for traffic control personnel. Removal of avalanche control systems for the season. Expect intermittent 30-minute closures.
minor construction | last updated Mon Apr 13 at 3:58 PM PDT.
Highway 1 (Kicking Horse Pass). Road maintenance work between Golden Donald Upper Rd and West Boundary of Yoho National Park for 24.0 km (West Boundary of Yoho National Park to Golden). Please watch for slow moving vehicles and crews. Last updated Tue Apr 14 at 8:40 AM MDT.
minor construction | last updated
Highway 1 (TransCanada Highway), in both directions. Maintenance between Glacier National Park East Boundary and Anderson Rd for 53.9 km (East Boundary of Glacier National Park to 1 km west of Golden). From 8:00 AM to 3:00 PM PDT on Wednesday and Thursday. Watch for slow moving vehicle.
minor construction | last updated Wed Apr 15 at 9:06 AM PDT.
Highway 1 (TransCanada Highway), in both directions. Road sweeping at Columbia River Bridge (Revelstoke). Until Wed Apr 22 at 2:30 PM PDT. From 6:00 AM to 2:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Watch for traffic control and crews working.
minor construction | last updated Wed Apr 15 at 9:46 AM PDT.
Highway 3 (Crowsnest Highway), westbound. Utility work planned between Shellborn Rd and Rosicky Rd for 5.8 km (6 km west of Jaffray to Jaffray). Starting Tue Apr 21 at 7:00 AM MDT until Thu Apr 23 at 4:00 PM MDT. From 7:00 AM to 4:00 PM MDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Last updated Thu Apr 16 at 10:56 AM MDT.
minor construction | last updated
Highway 1 (TransCanada Highway), in both directions. Paving operations between Crazy Ck. Bridge and Highway 23 South for 37.2 km (29 km east of Sicamous to Revelstoke). Until Sat Jun 20 at 7:00 AM PDT. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Single lane alternating traffic. Watch for traffic control.
major construction | last updated Thu Apr 16 at 12:12 PM PDT. | next update Sat Jun 20 at 7:00 AM PDT.
Highway 95. Maintenance between Greenwood Rd and Reflection Lake Rd for 89.6 km (Golden to 10 km north of Radium Hot Springs). Watch for slow moving vehciles. Last updated Mon Apr 20 at 7:31 AM MDT.
minor construction | last updated
Highway 1 (TransCanada Highway), in both directions. Travel advisory in effect between Glacier National Park Summit and Beaver Valley Rd (5 km east of Rogers Pass Summit). Flooding. Advisory speed limit 70 km/h. High levels of water pooling off snowpack into snowsheds east of Rogers Pass. Risk of hydroplaning. Speed reduction in effect. Obey signage and travel with caution.
major incident | last updated Mon Apr 20 at 5:00 PM PDT. | next update Mon Apr 27 at 10:00 AM PDT.

Mountain Pass Weather Cameras

Rogers Pass Weather Cam

Alberta Road Conditions

Filed Under: Area, Road Reports

Lower Mainland Road Conditions

by

BC Lower Mainland – Road Conditions

Up to date road reports for the greater Vancouver and lower mainland

Highway 99, southbound. Utility work between Exit 26 and Exit 20 for 4.7 km (Delta). Until Sat Nov 7 at 11:45 PM PST.
minor construction | last updated Mon Feb 2 at 10:31 AM PST.
56th Avenue, in both directions. Construction work between 256th Street and Gloucester Way in Langley - District. Until Sun May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Lane closures in both directions in effect. Watch for traffic control.
minor construction | last updated Thu Mar 26 at 4:18 PM PDT. | next update Fri May 29 at 10:00 AM PDT.
52nd Avenue, in both directions. Construction work between 264th St (Hwy 13) and 272 St in Langley - District. Until Sun May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Utility work. Watch for traffic control. Lane closures in both directions in effect.
minor construction | last updated Thu Mar 26 at 4:13 PM PDT. | next update Fri May 29 at 10:00 AM PDT.
Highway 10, eastbound. Construction work between 196 St and 200 St (1 km east of Langley - District). Until Mon Nov 15, 2027 at 7:00 AM PST. Access to side lane closed. Eastbound lanes unaffected. Watch for crews.
minor construction | last updated Mon Jan 26 at 10:11 AM PST. | next update Mon Nov 16 at 3:00 PM PST.
Highway 7B (Mary Hill Bypass), in both directions. Bridge construction between United Blvd and Shaughnessy St (Port Coquitlam). From 7:00 AM to 5:00 PM PST on weekdays. Watch for traffic control. Expect delays due to congestion. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit.
major construction | last updated Tue Jan 13 at 12:12 PM PST. | next update Mon Apr 27 at 5:00 PM PST.
Highway 3 (Crowsnest Highway), in both directions. Road maintenance work between Second Avalanche Gate and Allison Pass Summit for 22.1 km (25 to 47 km east of Hope). Road open to traffic. Watch for traffic control. One lane open in each direction. Speed reduction to 30 km/h at KM 42 between Hope and Manning Park.
major construction | last updated Fri Mar 27 at 7:01 PM PDT. | next update Fri Apr 24 at 12:00 PM PDT.
Silver Skagit Rd, in both directions. Washout at Flood Hope Rd. Road has been impacted by washout, repair plans underway. While passable, the road is not being maintained at this time and 4wd recommended, use caution.
minor incident | last updated Thu Apr 16 at 10:10 AM PDT. | next update Mon Mar 1, 2027 at 10:00 AM PDT.
Highway 99, southbound. Maintenance between Exit 28 and 72 St for 3.1 km (Delta). Until Tue Jun 30. From 10:00 PM to 5:30 AM PST daily. Environmental borehole drilling and soil sampling.
minor construction | last updated Thu Jan 15 at 4:23 PM PST.
Highway 1 (TransCanada Highway), eastbound. Road construction work between Exit 18: Lonsdale Ave and Exit 19: Lynn Valley Rd (North Vancouver - City). Until Fri Jul 31. From 7:00 AM to 5:00 PM PST daily. Right lane of eastbound on-ramp closed.
minor construction | last updated Thu Jan 22 at 1:53 PM PST.
Highway 1 (TransCanada Highway), in both directions. Construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 15. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Speed limit 60 km/h. Single lane traffic in both directions. More info: https://news.Gov.Bc.Ca/releases/2026TT0016-000090.
major construction | last updated Fri Mar 6 at 12:07 PM PST. | next update Mon Jun 15 at 12:00 PM PST.
Beach Road, westbound. Utility work between Highway 99 and Semiahmoo First Nations. Until Fri May 1. From 7:00 AM to 5:00 PM PST daily. Single lane alternating traffic.
minor construction | last updated Tue Feb 3 at 8:23 AM PST.
Hwy 99 / Hwy 17. Utility work at Exit 13A (Burns Dr) in Delta. Until Tue Apr 21 at 6:00 AM PDT. From 6:00 PM to 6:00 AM PDT daily. Watch for traffic control. Exit 13A closed. Burns Dr closed north of Hwy 17 exit ramp to Hwy 99.
minor construction | last updated Fri Feb 20 at 10:34 AM PDT.
Highway 99, in both directions. Maintenance between Exit 28 and Exit 32: Steveston Hwy for 3.7 km (Delta to Richmond). Until Fri May 1 at 7:00 PM PST. Watch for traffic control. Tree clearing work.
minor construction | last updated Fri Feb 20 at 3:21 PM PST.
Highway 101, in both directions. Construction work between Silverstone Lane and Ocean Ave for 1.1 km (Sechelt). Until Tue Jun 30. From 7:00 AM to 7:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Highway 101 and Shorncliffe Avenue intersection improvements.
minor construction | last updated Mon Feb 23 at 9:52 AM PST.
Mt Lehman Overpass, in both directions. Bridge construction at Highway 1. Reduced to one lane in each direction. Expect delays northbound on Mt Lehman Rd and on the westbound Highway 1 on-ramp. For more info: https://www2.Gov.Bc.Ca/gov/content/transportation-projects/fraser-valley-highway1/264th-street-to-mt-lehman-road/mt-lehman-road-interchange.
major construction | last updated Fri Mar 20 at 10:14 PM PDT. | next update Mon Dec 21 at 12:00 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Road construction work between Anderson River Mainline and Thomas Rd for 9.1 km (29 to 20 km north of Yale). Until Wed Sep 30. Lane Closure. Watch for traffic control.
minor construction | last updated Tue Mar 3 at 8:56 PM PST.
Highway 1A, in both directions. Construction work at stal'ew'asem Bridge. Until Sat May 2. From 7:00 AM to 2:00 PM PDT on weekends and from 9:00 AM to 3:00 PM PDT on weekdays. Lane Closure. Watch for traffic control.
minor construction | last updated Sun Apr 19 at 6:55 AM PDT.
Sylvester Rd, in both directions. Utility work between Dale Rd and Farms Rd. Until Fri Apr 24. From 7:00 AM to 7:00 PM PDT daily. Road closed. Detour via Farms Rd and Dale Rd. Access maintained for local vehicles and commercial trucks accessing the gravel pit. Watch for traffic control.
minor construction | last updated Thu Apr 16 at 4:02 PM PDT.
Highway 91A, in both directions. Bridge maintenance at Queensborough Bridge (New Westminster). Until Sun Nov 15. From 9:30 PM to 9:00 AM PDT on weekends and from 9:30 PM to 5:00 AM PDT on weekdays. Night time construction work. Reduced to one lane each direction. No lane closures on June 11 to July 9th or on stat holidays. Watch for crews and expect a speed limit reduction.
major construction | last updated Wed Apr 1 at 10:17 PM PDT. | next update Wed Nov 11 at 5:00 AM PDT.
Highway 7B (Mary Hill Bypass), westbound. Construction work between Coast Meridian Rd and Pitt River Rd for 1.5 km (Port Coquitlam). Until Fri Aug 28. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. Bus stop improvement project.
minor construction | last updated Wed Mar 18 at 12:47 PM PDT.
Highway 10, in both directions. Road construction work at 196 St (Surrey). Until Fri Jul 3 at 7:00 AM PDT. Left turn lane closed. Centre lane blocked. Watch for traffic control. Entry and exit lane construction east and west of Highway 10. Additionally, there will be a left turn lane closure from Fraser Highway onto Highway 10. No work on Long Weekends or closures after 12 PM before or after a Statutory Holiday.
minor construction | last updated Mon Mar 30 at 12:46 PM PDT.
Highway 1 (TransCanada Highway), westbound. Construction work between Bradner Rd and 248 St for 6.9 km (Abbotsford to Langley - District). Until Sun May 31. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Watch for traffic control. Lane closures.
minor construction | last updated Thu Mar 26 at 4:50 PM PDT.
Highway 13, in both directions. Construction work between 48 Ave and 56 Ave for 1.6 km (Langley - District). Until Sun May 31 at 7:00 AM PDT. Lane shifts. Speed reduction to 40km/h. Work zone includes 264th St between 56th Ave and 58th Ave.
minor construction | last updated Thu Mar 26 at 5:01 PM PDT. | next update Fri May 29 at 10:00 AM PDT.
Highway 101, in both directions. Tree pruning between Redrooffs Rd and Shorncliffe Ave for 6.3 km (Sechelt). Until Sat May 30 at 4:00 PM PDT.
minor construction | last updated Tue Mar 31 at 9:47 AM PDT.
Highway 7 (Lougheed Highway), in both directions. Rock slope stabilization between 7 Day Adventist Youth Camp Rd and Ross Rd for 3.1 km (Hope). Until Sat Aug 8. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic with 20 minute delays. Work taking place Apr 6-14, May 4-10, May 25-June 26, July 24-Aug 8. Watch for traffic control.
minor construction | last updated Tue Mar 31 at 1:57 PM PDT.
Highway 7 (Lougheed Highway), in both directions. Construction work between Beaudry Rd and Beach Camp Rd for 0.8 km (6 to 5 km west of Kent). Until Sun May 31. From 9:00 AM to 9:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control.
minor construction | last updated Wed Apr 1 at 3:44 PM PDT.
Bridgeport Rd, in both directions. Construction work between Sea Island Way and Hwy 99 Off Ramp. Until Fri May 8. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure.
minor construction | last updated Thu Apr 2 at 3:38 PM PDT.
232 St Off-Ramp, in both directions. Construction work at Highway 1 in Langley - District. From 8:30 PM to 10:30 AM PDT on Friday and Saturday and from 9:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday and Wednesday. Exit ramp is closed. Eastbound off-ramp closed April 15th, 19th-22nd. Westbound off-ramp closed April 24th & 25th. Traffic pattern change. Follow signage and new traffic signal at 72nd Ave. Last updated Mon Apr 13 at 4:57 PM P
minor construction | last updated | next update Sun Apr 26 at 12:00 PM PDT.
Roberts Bank Way, in both directions. Utility work between Deltaport Way and 27b Ave in Delta. Until Fri Apr 24 at 2:00 PM PDT. From 8:00 AM to 2:00 PM PDT on weekdays. Watch for traffic control.
minor construction | last updated Wed Apr 8 at 2:26 PM PDT.
Highway 15 (Pacific Highway), in both directions. Construction work between 28B Ave and 40 Ave for 0.6 km (Surrey). Until Sun May 31. From 7:00 PM to 5:00 AM PDT daily. Right turn lane closed. Right lane closed. Lane closures will only be in one direction at a time.
minor construction | last updated Wed Apr 8 at 2:42 PM PDT.
Highway 15 (Pacific Highway), northbound. Maintenance between 80 Ave and 92 Ave for 2.5 km (Surrey). Until Fri Apr 24. From 6:00 PM to 5:00 AM PDT daily. Right lane closed.
minor construction | last updated Wed Apr 8 at 2:47 PM PDT.
Highway 7 (Lougheed Highway). Utility work planned at North Nicomen Rd (13 km west of Kent). Starting Wed Apr 29 at 9:00 AM PDT until Wed Apr 29 at 5:30 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel.
minor construction | last updated Thu Apr 9 at 2:03 PM PDT.
Highway 99, southbound. Utility work between Nicklaus North Blvd and Blackcomb Way (Whistler). Until Tue Apr 28 at 5:00 PM PDT. From 9:00 AM to 5:00 PM PDT on weekdays. Right lane closed.
minor construction | last updated Mon Apr 13 at 12:26 PM PDT.
Highway 99, northbound. Construction work between Deas Thruway and Exit 32: Steveston Hwy (Richmond). Until Tue Apr 21 at 5:30 AM PDT. From 10:00 PM to 5:30 AM PDT on Monday. Ramp blocked. Eastbound right turn closure with a detour.
minor construction | last updated Fri Apr 10 at 9:53 AM PDT.
Highway 99, northbound. Construction work between Deas Thruway and Exit 32: Steveston Hwy (Richmond). Until Wed Apr 22 at 5:30 AM PDT. Right lane is blocked. Eastbound right turn closure with a detour.
minor construction | last updated Fri Apr 10 at 9:57 AM PDT.
Highway 99, northbound. Construction work planned between Deas Thruway and Exit 32: Steveston Hwy (Richmond). Starting Wed Apr 22 at 10:00 PM PDT until Fri Apr 24 at 5:30 AM PDT. Left lane will be blocked.
minor construction | last updated Fri Apr 10 at 10:01 AM PDT.
Highway 99, southbound. Construction work planned between Exit 32: Steveston Hwy and Exit 28 for 3.1 km (Delta to Richmond). Starting Fri Apr 24 at 10:00 PM PDT until Sat May 2 at 5:30 AM PDT. Right lane will be blocked.
minor construction | last updated Fri Apr 10 at 10:04 AM PDT.
Highway 15 (Pacific Highway), in both directions. Construction work between 64 Ave and Fraser Hwy for 2.0 km (Surrey). Until Sat Apr 25 at 10:00 PM PDT. Right turn lane from Fraser Highway eastbound to Hwy 15 southbound closed. Right turn lane from Hwy 15 northbound to Fraser Highway eastbound closed. Watch for traffic control.
major construction | last updated Thu Apr 16 at 10:18 AM PDT. | next update Sat Apr 25 at 10:00 PM PDT.
Highway 15 (Pacific Highway), northbound. Construction work at Fraser Hwy (Surrey). Until Sat Apr 25. Right turn lane closed. Watch for traffic control. Eastbound right turn lane of Fraser Hwy also closed.
minor construction | last updated Fri Apr 10 at 4:43 PM PDT.
Highway 9, southbound. Utility work planned between Morrow Rd and Bristol Dr for 0.4 km (Kent). Starting Wed Apr 22 until Thu Apr 23 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Lane Closure. Lane shift in effect.
minor construction | last updated Mon Apr 13 at 2:59 PM PDT.
Highway 11, northbound. Utility work between McClary Ave and Delair Rd (Abbotsford). Until Wed May 6. From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Left turn lane closed. Drilling, cable placing and splicing between Lonzo Rd. And 90 m south of Lonzo Rd.
minor construction | last updated Mon Apr 13 at 5:50 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Utility work between Exit 90: McCallum Rd and Exit 95: Whatcom Rd for 5.5 km (Abbotsford). Until Wed May 6. From 9:00 PM to 5:00 AM PDT on weekdays and Saturday. Centre lane closed. Right turn lane closed. Right lane closed. Drilling, cable placing and splicing.
minor construction | last updated Mon Apr 13 at 5:54 PM PDT.
Howes St, in both directions. Construction work between Boyd St and Ewen Ave in New Westminster. Until Fri Nov 13. From 9:00 AM to 8:00 PM PDT on Saturday and from 7:00 AM to 8:00 PM PDT on weekdays. Traffic controls in place. Speed reduction to 30km/hr.
minor construction | last updated Wed Apr 15 at 6:04 PM PDT.
Highway 99, in both directions. Utility work planned between Copper Dr and Darrell Bay Rd for 7.2 km (Squamish). Starting Mon May 4 until Sun Jun 7. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control personnel. Expect delays.
minor construction | last updated Wed Apr 15 at 4:33 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Line painting between Exit 27: E 1st Ave and Port Mann Bridge for 18.8 km (Vancouver to Surrey). Until Tue Apr 21 at 5:00 AM PDT. Expect rolling lane closures and watch for crews working at highway interchanges and ramps.
minor construction | last updated Mon Apr 20 at 7:16 PM PDT.
Lillooet Ave, eastbound. Road maintenance work planned between Chehalis St and Eagle St in Harrison Hot Springs. Starting Mon May 11 until Fri May 15. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel.
minor construction | last updated Thu Apr 16 at 3:19 PM PDT.
Highway 7 (Lougheed Highway), in both directions. Maintenance planned between Lennox Rd and Johnson Rd for 0.8 km (9 to 8 km east of Mission). Starting Wed Apr 22 at 9:00 AM PDT until Wed Apr 22 at 3:00 PM PDT. Single lane alternating traffic will be in effect.
minor construction | last updated Thu Apr 16 at 3:28 PM PDT.
Highway 99, southbound. Utility work planned between Lost Lagoon Rd and Gilford St for 0.3 km (Vancouver). Starting Fri Apr 24 at 10:00 AM PDT until Fri Apr 24 at 3:00 PM PDT. Right lane will be blocked. Watch for traffic control personnel.
minor construction | last updated Fri Apr 17 at 10:19 AM PDT.
Highway 91, northbound. Maintenance between River Rd and Exit 11 for 2.6 km (New Westminster to Delta). Until Mon Jun 1 at 6:00 PM PDT. Pedestrian and cyclist sidewalk access reduced. Check local signage.
minor construction | last updated Mon Apr 20 at 5:29 PM PDT.
Morris Valley Road, in both directions. Special event planned between Hemlock Valley Road and Chehalis River Bridge. Starting Thu Apr 30 at 3:00 PM PDT until Thu Apr 30 at 11:00 PM PDT.
minor special event | last updated Fri Apr 17 at 12:39 PM PDT.
Highway 7 (Lougheed Highway), in both directions. Maintenance planned between St. Anthony's Way and McLean St for 0.6 km (Mission). Starting Thu Apr 23 at 6:45 AM PDT until Thu Apr 23 at 3:00 PM PDT. Debris cleanup in the medians. Left turn lanes blocked both ways.
minor construction | last updated Fri Apr 17 at 1:09 PM PDT.
Highway 10, westbound. Construction work planned at 200 St (Langley - City). Starting Wed Apr 29 at 8:00 PM PDT until Fri May 1 at 6:00 AM PDT. Right lane will be blocked. Watch for traffic control personnel.
minor construction | last updated Fri Apr 17 at 1:13 PM PDT.
Highway 99, in both directions. Road sweeping between Lions Bay Ave and Porteau Cove for 12.8 km (10 km south of Squamish to Lions Bay). Until Tue Apr 21 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on Monday and Tuesday. Watch for traffic control.
minor construction | last updated Fri Apr 17 at 2:10 PM PDT.
Highway 99, northbound. Roadside brushing at Lions Bay Ave (Lions Bay). Until Tue Apr 21 at 5:30 PM PDT. Right lane is blocked. Watch for traffic control.
minor construction | last updated Fri Apr 17 at 2:15 PM PDT.
Highway 99, in both directions. Maintenance between Exit 3: Horseshoe Bay Junction and Depot Rd for 50.0 km (West Vancouver to Squamish). Until Fri Apr 24 at 5:30 PM PDT. Watch for traffic control.
minor construction | last updated Fri Apr 17 at 2:17 PM PDT.
Highway 99, southbound. Bridge maintenance at Lions Gate Bridge (West Vancouver). Until Thu Apr 23. From 10:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Right lane closed. Watch for traffic control. Bridge washing will be taking place. The centre lane will be used for southbound traffic.
minor construction | last updated Fri Apr 17 at 2:22 PM PDT.
Highway 10, westbound. Utility work planned between 153 St and 152 St for 0.3 km (Surrey). Starting Mon May 11 until Tue May 12. From 10:00 PM to 4:30 AM PDT on Monday and Tuesday. The right turn lane and curb lane will be blocked.
minor construction | last updated Fri Apr 17 at 4:20 PM PDT.
Highway 1A, in both directions. Paving operations planned at Riverview Bridge (New Westminster). Starting Fri Apr 24 at 9:00 PM PDT until Mon Apr 27 at 5:00 AM PDT. Road closure planned. Detour planned. This work is weather-dependent. DriveBC will keep you updated.
major construction | last updated Fri Apr 17 at 5:52 PM PDT. | next update Thu Apr 23 at 10:00 AM PDT.
Highway 99. Watch for slippery sections between Lil'wat Pl and Seton Lake Rd for 45.1 km (Lillooet).
minor road condition | last updated Tue Apr 21 at 1:11 AM PDT.
Highway 5 (Coquihalla South), in both directions. Road sweeping between the start of Highway 5 (Coquihalla South) and Exit 202: Portia for 24.8 km (Hope to 11 km south of Great Bear Snowshed). Until Thu Apr 23 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Slow rolling lane closures will be in effect. Watch for crews working.
minor construction | last updated Mon Apr 20 at 7:02 AM PDT.
Highway 15 (Pacific Highway), in both directions. Utility work between 48 Ave and 68A Ave for 4.3 km (Surrey). Until Fri May 8. From 8:00 PM to 5:00 AM PDT on weekdays. Crews will be working on the shoulder. The centre, curb and bike lanes will be blocked.
minor construction | last updated Mon Apr 20 at 9:00 AM PDT.
Highway 10, in both directions. Utility work between 160 St and 180 St for 4.0 km (Surrey). Until Fri May 8. From 8:00 PM to 5:00 AM PDT on weekdays. Crews will be working on the shoulder. The curb lane will be blocked.
minor construction | last updated Mon Apr 20 at 9:02 AM PDT.
Columbia Valley Rd, in both directions. Bridge maintenance at Watt Creek Bridge. Until Fri Apr 24 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Mon Apr 20 at 9:18 AM PDT.
Highway 3 (Crowsnest Highway), in both directions. Construction work planned between Garret Rd and Sunday Summit for 14.0 km (46 to 32 km west of Princeton). Starting Wed Apr 22 until Tue Jun 30. Lane Closure. Watch for traffic control personnel. Work zone in effect 24/7. Work will be happening at Placer FSR near the Copper Creek Recreation Area.
major construction | last updated Mon Apr 20 at 9:39 AM PDT. | next update Mon Jun 29 at 10:00 AM PDT.
Imperial Dr, in both directions. Special event between W 16th Ave and W 29th Ave in Vancouver. Until Tue Apr 21. From 9:00 AM to 3:00 PM PDT on Monday and Tuesday. Watch for traffic control. Filming will be taking place. A full closure will happen on Tuesday.
minor special event | last updated Mon Apr 20 at 11:45 AM PDT.
Highway 1 (TransCanada Highway). Maintenance between Toll Rd and Thomas Rd for 22.0 km (9 to 31 km north of Yale). Until Sat Apr 25 at 1:00 PM PDT. From 7:00 AM to 1:00 PM PDT daily. Crews will be washing all tunnels through the Fraser Canyon. Watch for traffic control and expect delays.
minor construction | last updated Mon Apr 20 at 12:42 PM PDT.
Highway 91, southbound. Maintenance planned at Exit 1 (Delta). Starting Tue Apr 28 at 10:00 AM PDT until Tue Apr 28 at 2:30 PM PDT. Right lane of exit ramp will be closed. Shoulder will be closed. Watch for crews on shoulder. Removal and replacement of damaged pole.
minor construction | last updated Mon Apr 20 at 2:44 PM PDT.
Highway 13, in both directions. Road maintenance work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Fri May 1. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Mon Apr 20 at 3:15 PM PDT.
Highway 91 Off-Ramp, eastbound. Maintenance planned at Knight St Bridge in Richmond. Starting Mon Apr 27 at 10:00 AM PDT until Mon Apr 27 at 2:00 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Pole replacement.
minor construction | last updated Mon Apr 20 at 3:19 PM PDT.
Highway 91, northbound. Utility work between Exit 4: Kittson Pky and Exit 6: 72 Ave (Delta). Until Fri Apr 24. Shoulder closed. Watch for traffic control.
minor construction | last updated Mon Apr 20 at 3:32 PM PDT.
Highway 1 (TransCanada Highway), in both directions. Line painting between Exit 49: 156 St and 216th St for 12.8 km (Surrey to Langley - District). Until Tue Apr 21 at 5:00 AM PDT. Expect rolling lane closures and watch for crews working at highway interchanges and ramps.
minor construction | last updated Mon Apr 20 at 4:24 PM PDT.
Highway 17, southbound. Road sweeping between Exit 13 and 56 St for 7.8 km (Delta). Until Tue Apr 21 at 4:00 AM PDT. Right lane is blocked. Watch for traffic control. Slow rolling lane closure.
minor construction | last updated Mon Apr 20 at 8:52 PM PDT.
Highway 1A. Construction work between Royal Ave and Riverview Bridge (New Westminster). Until Tue Apr 21 at 5:00 AM PDT. Right lane closed. Watch for traffic control. Expect delays. Northbound off-ramp to Columbia St closed until 6:00 AM.
minor construction | last updated Mon Apr 20 at 8:52 PM PDT.
NW Marine Drive, in both directions. Special event planned between Spanish Banks and 16th Avenue in Vancouver. Starting Sun May 3 at 8:30 AM PDT until Sun May 3 at 12:00 PM PDT. Road closure planned. BMO Vancouver Marathon. NW Marine Drive and 16th Avenue closed in UBC Endowment lands. Visit https://bmovanmarathon.Ca/detours for full road closure list.
minor special event | last updated Mon Apr 20 at 9:27 PM PDT.

Check Highway 99 Road Conditions

BC Highway 1 Road Condition Reports

BC Highway 7 Lougheed Highway Road Conditions

The Lower Mainland is a geographic and cultural region of the mainland coast of British Columbia that generally comprises the regional districts of Metro Vancouver and Fraser Valley. The term has historically been in popular usage for over a century to describe a region that extends from Horseshoe Bay south to the Canada–United States border and east to Hope at the eastern end of the Fraser Valley. . The region is bounded to the north by the Coast Mountains and to the southeast by the Cascade Mountains, and is traversed from east to west by the Fraser River. BC Lower Mainland – Road Conditions Boating in the Lower Mainland. Remember to Get a Boat Operators Licence

Washington State Road Conditions

 

Filed Under: Area, Road Reports

Canada USA Border Cameras

BC Canada to USA – Border Cameras and BC Routes to the USA – Use these Camera images and links below to plan your trips across the border so that you can chose a route with minimal Border Delays.

Crossing the border to the US for a Daytrip? Here’s how!

Washington State

Highway 11 – Huntington – Border Cameras

Highway 13 – Lynden – Border Cameras

Highway 15 – Pacific Crossing – Border Cameras

Highway 97 – Oroville Wa USA / Osoyoos BC Border Cameras

Highway 99 – Peace Arch Douglas Crossing – Border Cameras

Montana

Roosville Montana / Grasmere BC Highway 93 – Border Cameras Road Report – https://bchighway.com/report/hwy93

Other Border Crossings in BC to the USA through Washington Idaho and Montana that we couldn’t find Cameras BC Routes to the USA

Washington State

Point Roberts Washington Tyee Dr. / Boundary Bay, 56th Street Tsawwassen https://bchighway.com/report/hwy17

  • Point Roberts Border Wait Times – From US-CBP

Nighthawk Loomis Washington Similkameen Rd. / Chopaka, Cawston BC Nighthawk Rd.https://bchighway.com/report/hwy3

Ferry, Curlew Washington Customs Rd 501 / Midway BC Dominion Street https://bchighway.com/report/hwy3

Danville Washington SR 21 / Carson Grand Forks BC https://bchighway.com/report/hwy41

Laurier Washington SR395 / Christina Lake BC https://bchighway.com/report/hwy395

Frontier Washington SR25 / Paterson, Rossland BC https://bchighway.com/report/hwy22

Boundary, Northport Washington / Waneta Trail BC https://bchighway.com/report/hwy22a

Metaline Falls Washington SR31 / Nelway BC https://bchighway.com/report/hwy6ns

Idaho State

Porthill Idaho State Hwy 1 / Rykerts BC https://bchighway.com/report/hwy21

Eastport Idaho State Hwy 95 / Kingsgate BC https://bchighway.com/report/hwy95

Alaska

Hyder, Alaska International Street / Stewart BC http://bchighway.com/report/hwy37a

Haines Alaska Haines Hwy / Atlin BC Pleasant Rd. Haines Highway Road Forecast

Skagway Alaska Route 98 / Fraser Border Dawson City Yukon Crossing Klondike Hwy 2

Page end Canada USA – Border Cameras and BC Routes to the USA

Government Advice for Border Wait Times

Washington State Border Wait Times Department of Transportation

Government of Canada Border Wait times – Main Crossings Only

Don’t Cause yourself a delay? Find Out Restrictions

USA Border Cams

Enjoy a Naturist Experience – Visit Wreck Beach Vancouver

Highway 93 Road Conditions

by

BC Highway 93 – Road Conditions report from USA Hwy 93 Montana through BC to Highway 1 Alberta.

Highway 93 – Border Cameras

Radium Hotsprings Northbound – Hwy 93/95 roundabout, at Radium Hot Springs, looking northbound on Hwy 95.

Radium Hotsprings Eastbound – Hwy 93/95 roundabout, at Radium Hot Springs, looking eastbound on Hwy 93.

Radium Hotsprings Southbound – Hwy 93/95 roundabout, at Radium Hot Springs, looking southbound on Hwy 93/95.

Panorama West – On Toby Creek Road at Panorama Fire Hall, near Springs Creek Rd, looking to the west.

Panorama East – On Toby Creek Road at Panorama Fire Hall, near Springs Creek Rd, looking to the east.

Canal Flats – Hwy 93 at Burns Avenue, looking south on Highway 93.

Wasa – Hwy 93/95 at junction of Hwy 95A, looking to the north.

Highway 93 is a north–south route through the southeastern part of British Columbia, in the Regional District of East Kootenay and takes its number from U.S. Highway 93 that it connects with at the Canada–United States border. It follows the Crowsnest Highway (Highway 3) and Highway 95 through Radium Hot Springs and to where it crosses the Continental Divide into Alberta at Vermilion Pass, where it continues as Alberta Highway 93. The section between the Canada-U.S. border and the Crowsnest Highway is known as the Elko–Roosville Highway, the section between the Crowsnest Highway and Radium Hot Springs is known as the Kootenay–Columbia Highway, while the section east of Radium Hot Springs is known as the Banff–Windermere Parkway.

From the international border crossing at Roosville, the 321 km (199 mi) long Highway 93 parallels the eastern shore of Lake Koocanusa for 36 km (22 mi) to where it meets the Crowsnest Highway (Highway 3) at Elko. Highway 3 carries Highway 93 west for 53 km (33 mi) to where it is handed off to Highway 95 just south of Fort Steele. Highway 95 carries Highway 93 north for another 134 km (83 mi) along the Kootenay River and the Columbia River passing through Wasa, Canal Flats, Fairmont Hot Springs and Invermere to Radium Hot Springs, where Highway 95 diverges north towards Golden.

Highway 93 leaves the concurrence and proceeds east from Radium Hot Springs for about 1.3 km (0.8 mi) to the western gate of Kootenay National Park. Through the park, the highway travels northeast along the Kootenay and Vermilion rivers for 93 km (58 mi) to Vermilion Pass and the Alberta border, where it is continues as Alberta Highway 93. After crossing the border, the highway continues for another 11 km (7 mi) to meet the Trans-Canada Highway (Alberta Highway 1) near Castle Junction.

Filed Under: Road Reports

Highway 15 Road Conditions

by

Highway 15 Road Conditions

Highway 15 – Border Cameras

Highway 15 (Pacific Highway), in both directions. Construction work between 28B Ave and 40 Ave for 0.6 km (Surrey). Until Sun May 31. From 7:00 PM to 5:00 AM PDT daily. Right turn lane closed. Right lane closed. Lane closures will only be in one direction at a time.
minor construction | last updated Wed Apr 8 at 2:42 PM PDT.
Highway 15 (Pacific Highway), northbound. Maintenance between 80 Ave and 92 Ave for 2.5 km (Surrey). Until Fri Apr 24. From 6:00 PM to 5:00 AM PDT daily. Right lane closed.
minor construction | last updated Wed Apr 8 at 2:47 PM PDT.
Highway 15 (Pacific Highway), in both directions. Construction work between 64 Ave and Fraser Hwy for 2.0 km (Surrey). Until Sat Apr 25 at 10:00 PM PDT. Right turn lane from Fraser Highway eastbound to Hwy 15 southbound closed. Right turn lane from Hwy 15 northbound to Fraser Highway eastbound closed. Watch for traffic control.
major construction | last updated Thu Apr 16 at 10:18 AM PDT. | next update Sat Apr 25 at 10:00 PM PDT.
Highway 15 (Pacific Highway), northbound. Construction work at Fraser Hwy (Surrey). Until Sat Apr 25. Right turn lane closed. Watch for traffic control. Eastbound right turn lane of Fraser Hwy also closed.
minor construction | last updated Fri Apr 10 at 4:43 PM PDT.
Highway 15 (Pacific Highway), in both directions. Utility work between 48 Ave and 68A Ave for 4.3 km (Surrey). Until Fri May 8. From 8:00 PM to 5:00 AM PDT on weekdays. Crews will be working on the shoulder. The centre, curb and bike lanes will be blocked.
minor construction | last updated Mon Apr 20 at 9:00 AM PDT.

Filed Under: Road Reports

Cariboo Road Conditions

by

Cariboo road conditions are Regional Highways Conditions for the BC Cariboo Area

Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road.
major incident | last updated Tue Apr 14 at 9:03 AM PDT. | next update Tue Apr 21 at 9:00 AM PDT.
Johnston Bridge, in both directions. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or less. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision.
major incident | last updated Wed Apr 15 at 3:20 PM PDT. | next update Mon Oct 19 at 9:00 AM PDT.
McKay Road, in both directions. Flooding at McKay Road. Road closed.
major incident | last updated Thu Apr 9 at 2:51 PM PDT. | next update Thu Apr 30 at 9:00 AM PDT.
Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road.
major incident | last updated Mon Apr 13 at 10:16 AM PDT. | next update Mon Apr 12, 2027 at 10:00 AM PDT.
Highway 20, in both directions. Watch for livestock between Elsey Rd and Chipman Rd for 143.1 km (39 km east of Tatla Lake to 6 km west of Anahim Lake).
minor incident | last updated Tue Apr 21 at 1:03 AM PDT.
Road 40 (Lillooet-Pioneer Rd). Debris on roadway between Tyaughton Lake Rd and Yalakom Rd for 60.9 km (87 to 26 km west of Lillooet). Construction work. Watch for traffic control. Expect delays. Light traffic only, limited road widths.
minor incident | last updated Tue Apr 21 at 1:03 AM PDT.
Knife Creek Road. Utility work at Hwy 97 and Walker Road. Until Thu Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for signage and personnel. Expect minor delays of up to five minutes.
minor construction | last updated Thu Apr 2 at 11:06 AM PDT.
Spokin Lake Road. Utility work between Horsefly Road and Mile 108 Horsefly Road. Until Thu Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for signage and personnel. Expect minor delays of up to five minutes.
minor construction | last updated Thu Apr 2 at 11:06 AM PDT.
Highway 97. Utility work between Rodney Road and 300 Meters N of Likely Road. Until Thu Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for signage and personnel. Expect minor delays of up to five minutes.
minor construction | last updated Thu Apr 2 at 11:07 AM PDT.
Pavilion-Clinton Road. Utility work between Jesmond Road and Elliot Park Way. Until Fri Apr 24. From 8:00 AM to 4:00 PM PDT on weekdays. Please watch for signage and personnel. Expect minor delays of up to five minutes.
minor construction | last updated Wed Mar 11 at 2:32 PM PDT.
Highway 20, in both directions. Utility work between Chilcotin - Meldrum Creek Rd and Big Creek Road. Until Thu Apr 30. From 7:00 AM to 5:00 PM PDT on weekdays. Vegetation clearing. Watch for signage and personnel. Possible delays.
minor construction | last updated Mon Mar 30 at 10:03 AM PDT.
Highway 97 (Cariboo Connector). Utility work between Naver Creek Rd and Colebank Rd E for 24.5 km (Hixon). Until Mon Jun 29 at 4:00 PM PST. Single lane alternating traffic. Vegetation removal. Obey all speed signage and traffic personnel. Possible delays.
minor construction | last updated Fri Feb 27 at 10:03 AM PST.
Highway 97 (Cariboo Connector), in both directions. Utility work between Dallas Rd and Kragbak Rd for 4.9 km (3 to 8 km north of Wildwood). Until Fri May 8 at 4:00 PM PDT. Curb/Outside Lanes and Center/Inside Lanes will be effected. Pay attention to signage and traffic control personnel. Possible delays.
minor construction | last updated Mon Mar 30 at 3:43 PM PDT.
Highway 97 (Cariboo Connector). Utility work between Airport Rd and Becker Rd for 1.4 km (1 to 2 km south of Wildwood). Until Fri May 8. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control.
minor construction | last updated Wed Mar 25 at 10:18 AM PDT.
Fox Mountain Road - North Side. Special event at West of Eider Drive near Williams Lake. Until Fri Apr 24. BC Wildfire Service - Controlled burning planned periodically on the North side of Fox Mountain, west of Eider Drive. Traveler's may see smoke while driving. No planned traffic interruptions.
minor special event | last updated Wed Mar 25 at 3:18 PM PDT.
Hwy 20. Utility work between Stafford Field Road and Buckley Drive. Until Fri Apr 24. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control.
minor construction | last updated Mon Mar 30 at 9:59 AM PDT.
Hwy 20. Special event between Sheep Creek Brake Check and Chilanko Forks Road. Until Tue Jun 30. Watch for traffic control.
minor special event | last updated Mon Mar 30 at 11:48 AM PDT.
Hwy 1. Utility work between Hwy 97 and Valleyview Drive. Until Thu Apr 30. From 8:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Single lane alternating traffic.
minor construction | last updated Tue Apr 14 at 9:09 AM PDT.
Highway 97 . Utility work between Soda Creek Substation and Pinnel Road. Until Fri May 8. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control.
minor construction | last updated Thu Apr 2 at 11:53 AM PDT.
Mission Mountain Road. Watch for slippery sections between Mission Dam and Shalath Cut Off near Lillooet.
minor road condition | last updated Tue Apr 21 at 1:11 AM PDT.
Highway 97. Special event at White Road 1 km south of Williams Lake. Until Fri Apr 24 at 5:00 PM PDT. BC Wildfire Service - Controlled burning planned periodically in White Road area. Traveler's may see smoke while driving. No planned traffic interruptions.
minor special event | last updated Thu Apr 9 at 10:29 AM PDT.
Highway 97 (Cariboo Connector), in both directions. Limited visibility with smoke between McDonald Ave and Mound Rd for 4.5 km (Clinton).
minor weather condition | last updated Sun Apr 19 at 11:15 AM PDT.
Nazko Rd. Tree pruning between Hangmans Trail and Tibbles Rd for 22.9 km (61 to 84 km east of Nazko). Until Mon Apr 27 at 4:00 PM PDT. From 7:30 AM to 4:00 PM PDT daily. Watch for traffic control. Single lane alternating traffic. Clearing under BC Hydro lines. Expect minor delays.
minor construction | last updated Mon Apr 13 at 11:36 AM PDT.
Highway 26. Construction work between Wells Visitor Info Center and Pooley Street. Until Sat Jun 13. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Tue Apr 14 at 8:57 AM PDT.
Gibraltar Mine Road. Utility work between Rimrock Rd and Beaver Lake Rd. Until Thu Apr 30. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control.
minor construction | last updated Tue Apr 14 at 9:06 AM PDT.
Highway 1 (TransCanada Highway). Utility work between Airport Rd and Coyote Valley Rd for 1.2 km (3 to 4 km south of Cache Creek). Until Wed Apr 22. From 8:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Expect minor delays.
minor construction | last updated Tue Apr 14 at 9:13 AM PDT.
Hwy 97. Construction work at Australian Rest Area. Until Mon Apr 27. Drilling equipment and personnel within the rest area. Please watch for signage and work crews. No interruption to traffic on the highway.
minor construction | last updated Wed Apr 15 at 8:48 AM PDT.
Mission Mountain Road. Industrial traffic may slow or block regular traffic. Between Terzaghi Dam and Shalalth. Until Sat May 9. From 6:00 AM to 6:00 PM PDT on weekdays and Saturday. Pilot Vehicle will be in use, please drive with caution, watch for signage, and obey all personnel instructions. Public is encouraged to arrange alternate travel plans during this time.
minor incident | last updated Wed Apr 15 at 10:49 AM PDT.
Highway 97 (Cariboo Connector), in both directions. Bridge maintenance between Torches Rd and Hold Rd for 2.0 km (23 to 21 km south of Quesnel). Until Fri May 8 at 4:00 AM PDT. From 6:00 PM to 4:00 AM PDT on weekdays. Single lane alternating traffic. Quesnel River Bridge #1569, Quesnel OH #1641 and Northstar overpass #2379.
minor construction | last updated Thu Apr 16 at 3:00 PM PDT.
Highway 97 (Cariboo Connector). Utility work between Loon Lake Rd and Cariboo Ave for 17.6 km (Clinton). Until Thu Apr 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control.
minor construction | last updated Fri Apr 17 at 2:43 PM PDT.
Highway 97 (Cariboo Connector). Utility work between Felker St and Begg Rd for 8.5 km (22 to 31 km north of 100 Mile House). Until Mon Apr 27. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control.
minor construction | last updated Fri Apr 17 at 2:51 PM PDT.
Highway 99. Utility work between Medicine Man Rd and Old Cariboo Rd for 25.6 km (44 to 70 km north of Lillooet). Until Tue Apr 21. From 7:30 AM to 4:00 PM PDT on Monday and Tuesday. Watch for traffic control. Vegetation management for BC Hydro.
minor construction | last updated Fri Apr 17 at 2:56 PM PDT.

Complete Road Condition Reports for:

Hwy 97 – https://bchighway.com/report/hwy97

Hwy 24 – https://bchighway.com/report/hwy24

Hwy 20 – https://bchighway.com/report/hwy20

Hwy 16 – https://bchighway.com/report/hwy16

Cariboo Road Conditions

The Cariboo region of BC is located in the central interior of the province. It is situated between the Cariboo Mountains to the east and reaches west across the Fraser River plateau to the Coast Mountains. Major cities in the Cariboo region include 100 Mile House, Williams Lake and Quesnel. Cariboo road conditions

Filed Under: Area, Road Reports

Highway 18 Road Conditions

by

BC Highway 18 Road Conditions reports from Duncan to Lake Cowichan

Highway 18, westbound. Tree pruning between Somenos Rd and Youbou Rd for 24.4 km (Lake Cowichan). Until Thu Apr 30 at 3:30 PM PDT. Single lane alternating traffic.
minor construction | last updated Tue Mar 24 at 12:36 PM PDT.

All Vancouver Island Road Conditions

Lake Cowichan

Lake Cowichan, is a town located on the east end of Cowichan Lake and, by highway, is 27 kilometres west of Duncan, British Columbia. The Cowichan River flows through the middle of the town.

British Columbia Highway 18 connects Duncan (via North Cowichan) to the town of Lake Cowichan to the west.

Highway 18 Road Conditons

Filed Under: Cameras, Road Reports Tagged With: Cam18

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to page 6
  • Go to page 7
  • Interim pages omitted …
  • Go to page 10
  • Go to Next Page »

Primary Sidebar

Caribbean Business for Sale

Move to Sint Maarten with this incredible opportunity 

Best Personal Breathalyzer

Personal Breathalyzer
Dont risk a DUI. Make sure you don’t drive while impaired Get a personal breathalyzer check your alcohol levels and drive responsibly.




This 'travel news' services website is privately owned. It is not affiliated or sanctioned by the Government of BC, nor is it part of the provincial governments - DriveBC program or websites, operated by the BC Ministry of Transportation and Infrastructure. The data and electronic links provided in this web site are for informational purposes only and bchighway.com disclaims all responsibility for the accuracy of site content or linked information. This information obtained from bchighway.com should not be used as a basis for making financial or other commitments. Privacy Agreement © 1996–2026 bchighway.com - All Rights Reserved.